ML20244E540
| ML20244E540 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 06/15/1989 |
| From: | Brady J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8906200384 | |
| Download: ML20244E540 (3) | |
Text
{->. _ _
-~---"w
' M '
an net UNITED STATES t
3
' 'ffig/
e o
NUCLEAR DEOULATORY cOMMIS$10N
]
REfl!N 18 -
(
Y g-
]
101 MACIETTA ST8IE ET. N.W.
A T!.ANTA, o EoNGt A 30323 JUN1slets NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Tennessee Vai;ey Authority (TVA)
Name'of' Facility:
Sequtyah Units 1 & 2
!?
Docket Numbers:
50-327, 50-328 Date and Time of Meeting: June 29,1989 at 9:00 a.m.
Location of Meeting:
Room 2F21. White Flint Building, Rockville, Maryland Purpose of Meeting: Enforcement Conference to discuss three issues which indicate apparent we.tknesses in the implementation of your programs.
These issues are the RHR events reported in LER 89-011, the BIT recirculation issue, and the Source Range /Inte*nediate Range detector relocation issue.
NRC Attendees:
D. M. Crutchfield, Associate Director for Special Projects, Cffice of NLclear Reactor Regulation (NRR)
- 8. D. 'iaw, Cirector, TVA Projects Division, (TVAPD), NRR S. Black, Assistant D: rector for Projects, TVAPD, NRR R. Pie
- son, Assistant Director for, Technical Programs, TVAPD, NRR B. A. Wilson, Assistant Di ector for Inspection Programs, TVAPO, NRR E. C. Marinos, Branch Chief, Reactor Operations Branch, T\\lAPD J. N. Donohew, Senior Project Manager, TVAPD, NRR J. B. Brady, Acting Section Chie# for Sequoyah, TVAPD,.
NRR K. H. Jenison, Senior llesident Inspector, Sequoyah, TVAPD, NFtR P. H. Harmon, Senior Resident Inspector, Sequoyah, TVAP3, titR T. flotella, Feactor Systems Engineer, TVAPD, NRR W. Troskos(1, Office o ' E,forcement B. B. Desai, Project lingineer, Sequoyah, TVAPD, NRR NOTE-Attendance by NRC perso1nel other :han those listed above should be nade known by 4:00 a.m., June 22, 1989, via telephone to J. Brady (404) 331-5436.
/
AD 0*
p P
1_ _ __ _ _ _ _ _ _ _. _
U_
wswvue rs w ieis-
- JUN1 stag-o V
L}f
' Notice of Significant Meeting 2
h th l
- Licensee Attendees: J. R. Synum, Vice President, Nuclear Production. TVA' M. Medford, Vice President and Nuclear Technical Of rectcr, j'
TVA J. L. LaPoint. Site Directer, Sequoyah Nuclear Plant, TVA~
M. Burrynski, Acting Site Licensing Manager, TVA W. Largergren, Operadens Superintendent, TVA Acproved By: ba.AI/8//d t
fosdph B Brady/ Acting Chief, Project Mection.1 TVA Projects Division J
Enclosure:
l Meeting Agenda DISTRIBUTION:
V. Stello, EDO J. Taylor, DEDR
.S.
Ebneter, Region II
-M.-'.Ernst, Region.II J.
Lieberman, OE L. Chandler, OGC J. Goldberg, OGC T. Murley, NRR F. Miraglia, NRR J. Partlow, NRR D. Crutchfield, NRR B.
D. Liaw, NRR S.
Black, NRR R. Pierson, NRR B. Wilson, TVAPD, NRR/RII J. Brady, TVAPD, NRR/RII K. Jenison, NRR/RI2 P. Harmon, ND3 Coff&#f**M'W" S. I sa :2, fvAro, NRR/RII G. Jenkins, Region II K. Clark, Region II R. Trojanowski, Region II Region II Division Directors R.
Borchardt, EDO W.-Troskoski, OE T. Rotella, NRR E..Marinos, NRR NRC PDR Local PDR
Pg-JUN 1 s;lagg
--e: n,
-e s G ll ;
j,.
m k..-
ENCt.050RE MEETING AGENDA' TENNESSEE VALLEY AUTHORITY JUNi 29, 1989, 9:00 a.m.
I, Opening Remarks.
NRC II Issues of Concern NRC/TVA TVA's. apparent failures rela ed to 10 CFR 50- 59 implementation, procedural. adequacy ard compliar.ce, and Technical Specification operability for the; following events:
A.
RHR events described in LER 89-011 B..
Removing the EIT.fron Recirculation C..
SR/IR Detector Relocation
- 0f scussion to include for ea
- h event:
Why reviews pursuant to 50.59 d d not identify t-unreviewed safety.ct.estions and tFe consequences involved in esch of.:hese events prior to their occurrence Why procedures were-either inacaquate or not followed for each of these everm;
. hy corrective actions for previous similar W
violations did not prevent these events Why operators were unaware of thd coiditions and/or their consequences on ope,ebility for these events What correettve act'ons have o will be implemented to prevent recurren.:.a of these events III. Closing Remarks NRC
-