Forwards Safety Insp Rept 50-461/89-14 on 890316-0530 & Notice of Violation.Util Will Be Notified by Separate Correspondence of NRC Decision Re Enforcement Action
ML20244E424
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/12/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20244E428 List:
References
NUDOCS 8906200334
Download: ML20244E424 (2)


See also: IR 05000461/1989014

Text

.

--

-

- _ - - - - - - - -

.-

- - _ . - _ - - _ -

,

Qf r

&

,

,

=>

.

(,,b, ,

'

O

m3

.

A'

-;E

w;

-d3

r, .

W

'

JUN 12 1999

4'

"

' Docket No.' 50-461

.

lllino_isiPower Company.

C

ATTN:

Mr. W; C. Gerstner

<

. Executive Vice President

50C South 27th. Street

Decatur,:IL: 52525-

'

'

,

Gentlemen:

g

'

'This refers t'o the. routine safety inspection conducted by Messrs. P. L. H land,

'

.A. S.~ Gautam and S. P. Ray _of this office on March 16, 1989,. through May 30,

1989, of.' activities at Clinton Power Station authorized by NRC Operating

'

License No. NPF-62, and to the discussion of our findings with Mr.-D. P. Hall

~

and others of-your staff at the conclusion of the inspection.

.

.The enclosed copy of our inspection report identifies areas examined during-

l

the. inspection; Within these areas, the inspection consisted of a.selec.ve

examination of procedures and representative records, observations, and

Linterviews'with personnel.

Dbring this inspection,-certain of your activities appeared to be in violation-

of NRC requirements as specified in the enclosed Notice. With respect to Item 1,

t

the inspection showed that actions had been taken to correct the identified

violation and-to prevent recurrence. Our understanding of your. corrective

1 actions is described in Paragraph 2.d of the enclosed inspection report.

_ Consequently, no reply to the violation is required and we have'no further

-

-questions regarding this matter-at this time.

Regarding the remaining items, a written response is required.

You may wish

to consider the comments in Paragraphs 2.f and 12 of the enclosed report in

your. response.

'Also during this inspection, certain other activities regarding the

environmental: qualification of electrical equipment appeared to be in

' violation of NRC requirements (Paragraph 9 of the report). ' We are releasing

this report at this. time for your information.

Following an enforcement

conference, you will be notified by separate correspondence of our decision

regarding enforcement action.

No written response is required until you are

notified of proposed enforcement actions.

f

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l

this letter, the enclosures, and your response to this letter will be

l-

placed in the NRC Public Document Room.

/l

-.

ggg@h

2

e

, _ _ _

_

,

.

-

,

!

2 JUN 121989

j

Illinois Power Company

.

-

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

4

as required by the Paperwork Reduction Act of 1980, PL 96-511.

{

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

ORIGINAL SIGNED BY W. L FORNEY

Edward G. Greenman, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-461/89014(DRP)

cc w/ enclosures:

D. P. Hall, Vice President

'J.

S. Perry, Assistant

Vice President

R. D. Freeman, Manager,

Nuclear Station

Engineering Department

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division, Sargent & Lundy

Engineers

David Rosenblatt, Governor's

Office of Consumer Services

Sheldon Zabel, Esquire,

Schiff, Hardin, & Waite

L. Larson, Project Manager,

General Electric Company

Chairman of DeWitt County

Illir.ois Department of

Nuclear Safety

D. Schopfer, Project Manager,

1

Sargent & Lundy Engineers

46

W

1

RIII

RIII

RIII, V

'

RIII

'

RI

RI

RII]

A1

W

Ad

to%f% Coop &

N

LOL%

V

o

gr

La ids an g Greenman

G

I;ilan / jaw

Ring

Gardner

Knoph (rose

kf

,, NM

f/f/SI

f

,

_ _

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

__