ML20244D196
| ML20244D196 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 04/11/1989 |
| From: | Calvo J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20244D197 | List: |
| References | |
| NUDOCS 8904210204 | |
| Download: ML20244D196 (4) | |
Text
_ _ _ _ _ _ _ - - _ _ _ _ _ _ _ - _ _.
l p2Kurg'.
o UNITED STATES
~,,
. 8.
NUCLEAR REGULATORY COMMISSION o
,E WASHINGTON, D. C. 20555
/
%,,..L.+,
ARKANSAS POWER.AND. LIGHT COMPANY DOCKET N0. 50-368 ARKANSAS. NUCLEAR.0NE, UNIT.2 AMENDNENT TO FACILITY 0PERATING LICENSE Amendment No. 90 License No. NPF-6 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Arkansas Power and Light Company (the licensee) dated January 28, 1985 as revised August 30, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulation:: set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Comr?ission; C.
There is reasonable assurance:
(i)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this license amendment h!Il not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
1 G904210204 890411 PDR ADOCK 05000368 P
I 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No.
i NPF-6 is hereby amended to read as follows:
l 2.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised.through Amendment No.90
, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
The license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 4.
AA Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: April 11, 1989 l
l l
l l
l
l ATTACHMENT TO LICENSE AMENDMENT NO.90 FACILITY OPERATING LICENSE NO. NPF-6 DOCKET.NO. 50-368 Revise the following page of the Appendix "A" Technical Specifications I
with the attached page. The revised page is identified by Amendment number and contains a vertical line indicating the area of change.
REMOVE PAGE INSERT PAGE 3/4 6-13 3/4 6-13 l
l 1
l
e-a CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued 1 d.
At least once per 18. months, during shutdown, by:
1.
Verifying tnat each automatic valve in the flow path actuates to its correct position on a CSAS test signal.
2.
Verifying that each sodium hydroxide addition pump starts automatically on CSAS test signal.
At least.once per 5 years by verifying a flow rate of at least 13 gpm e.
through each sodium hydroxide injection path from the sodium hydroxide pump discharge to the containment spray pump discharge.
l ARKANSAS - UNIT 2 3/4 6-13 Amendment No.90 E
e
_.