ML20244C915

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-313/89-21 & 50-368/89-21 on 890508-12.No Violations or Deviations Noted
ML20244C915
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/06/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20244C918 List:
References
NUDOCS 8906150209
Download: ML20244C915 (2)


See also: IR 05000313/1989021

Text

. _ _ _ .

__

_

,

,

.-

,

'~

.

JUN - 61989

.-

In Reply Refer To:

Dockets: 50-313/89-21

50-368/89-21

Arkansas Power & Light Company

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P.O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Mr. L. Wilborn and

Dr. J. B. Nicholas of this office during the period May 8-12, 1989, of

activities authorized by NRC Operating License DPR-51 and NPF-6 for Arkansas

Nuclear One, Units 1 and 2, and to the discussion of our findings with

Mr. S. M. Quennoz and other members of your staff at the conclusion of the

inspection on May 12, 1989.

Areas examined during the inspection included the water chemistry and

radiochemistry programs and water chemistry and radiochemistry confirmatory

measurements. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

1

J. L. Milhoan, Director

Division of Reactor Projects

.,

Enclosures:

(see next page)

d

i

I k./

RIV:FRPS:RPB

FRPS:RPB

C:FRPS

C:RPB

D:DRSS

.ORP W

j

  • JBNicholas;ap *LWilborn
  • REBaer
  • BMurray
  • ABBeach

JLMijhoan

/ /89

/ /89

/ /89

/ /89

/ /89

6 / 3 /89

  • Previously concurred

g6150209090606

"

G

ADOCK 05000313

I

TQ

PNu

,

--

_

--

a

-- ..

_ _ _

1-

.

.

.

s

,

,

E

'

ss, i.

. . *

,

i1

Arkansas Power &ELight: Company

-2-

..

. Enclosu'resi

1.

Appendix'- NRC Inspection Report-

50-313/89-21:

50-368/89-21-

2.

- Attachment-1 -LAnalytical Measurements -

3.

' Attachment 2

' Water Chemistry Confirmatory.

Measurements Results (Secondary. Chemistry.

Laboratory);

4.

Attachment 3 - Water Chemistry Confirmatory

Measurements Results (Radiochemistry Laboratory)'

.5.

Attachment'4 - Criteria ~for' Comparing Water Chemistry-

Analytical Measurements-

6.

Attachment-6 - Radiological' Confirmatory Measurements

,

Results-

7.

Attachment 6 . Criteria.for' Comparing Radiological

..s

Analytical Measurements:

8.

Attachnient' 7 - Documents Reviewed

I

cc w/ enclosures: .

j

'

Arkansas Nuclear One

1

l

. ATTN:

N. S. - Carns, Director -

1

Nuclear Operations

~

P.0. Box 608

Russe' liv 111e, Arkansas 72801

Arkansas Radiation Control Program Director-

I

.

bec to DMB (IE06)

l

bec distrib. by RIV

.

.

  • RR1
  • R. D. Martin, RA-

..

  • RPB-DRSS
  • Section Chief (DRP/A)

i

,

Lisa Shea, RM/ALF

  • RIV File

{

  • DRP
  • MIS System
  • RSTS Operator

- "

  • Project Engineer. (DRP/A)
  • DRS-
  • L. Wilborn

i

  • J. B. Nicholas
  • R. E. Baer'

l

  • A. B. Beach
  • R. E.-Hall-

j

  • B..Murray

,.

!

  • C. Harbuck, NRR Project Manager (MS: ,13-D-18)

i

  • C. Posiusny..NRR Project Manager (MS:

13-D-18)

.

3

  • w/766

1

!

i

,

l

.

v

(

.