APR 131989
'
- .
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN: Mr. Cordell Reed'
Senior Vice-President
Post Office Box 767
Chicago, ILu 60690
,
Gentlemen:
'
This refers' to the routine safety inspection conducted by Mr. R.. A. Hasse,
Ms. A. M. Bongiovanni, and Ms. V. P. Lougheed of. this office on February 27
through March 16, 1989, of activities at Byron Nuclear Power Station, Units li
'
and.2 authorized by NRC Operating Licenses No. NPF-37 and NPF-66 and to the
discussion of our findings with Mr. R. Pleniewicz and others of your staff
at t~ne conclusion of the inspection.
The purpose of this inspection was to determine if design changes and
modifications and the dedication of commercial grade equipment for
,
safety-related applications were being conducted in accordance with
'
regulatory ~ requirements. Within these areas, the inspection consisted
!
of a selective examination of procedures and representative records,
observations, and interviews with personnel.-
The results of this inspection indicated some weaknesses in the areas of design
control and post modification testing.
It appeared that this was due, in part,
,
'to a weakness in communications between the large number of organizations
involved in the design change process.
Several examples of problems noted
i
were:
failure to seismically qualify several valves installed in a
j
modification to MSIV accumulator test connections; failure to convey critical
i
preventative maintenance requirements for diesel general governor circuit
relays; and, failure to fully test a modification installing a time delay
relay.in the auxiliary feedwater pump trip logic.
We were also concerned with the apparent lack of understanding of the intent
of 10 CFR Part 50, Section 50.59 and the lack of a well-structured program
,
for dedicating commercial grade equipment for safety-related applications.
,
We were encouraged by our review of several recent audits performed by your
quality assurance organizations in that they had identified several concerns
similar to'those identified during this inspection. This indicates that your
audit program is effective in identifying problems.
\\
(
8904200396 SoO413
}
l
ADOCK 05000454
'fI
i
O
l
-_ _
,_.
-.
_
_ _ _ _ _ _ -
.
.
APR13 1999
..
,,
..
Commonwealth Edison Company
2
i
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed notice. A written response
is required.
We also request that you respond to the open items identified in Paragraphs
3.b(1) (design control), 3.b.(2) (Post Modification Testing), and 4.c
(dedication of commercial grade equipment for safety-related applications) of
the attached Inspection Report.
In responding, we request you address how
such problems are occurring in view of your Modification Program enhancements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.ORIGli:AL SIGNED BY MBEM L MG1R
Hubert J. Miller, Director
Division of Reactor Safety
Enclosures:
1.
j
2.
Inspection Reports
No. 50-454/89009 DRS ;
l
No. 50-455/89006 DRS
,
See Attached Distribution
/
'
W
]
RIII
RIII
RIII
,RIII
RIII
RIII
RLI
RI I
I
.
h/j O
BokgYovahi
LokheI0
Ha
P
i
r
_ _ _ _ _ _ _ _ _ _
.
- _ - - _ _ _ - _ _
- -
u
-u
..
h
. .-
.
r
.APR ! 3 jgggi
_
[
- , ,
4..
V ..
g
. .
p'
Commonwealth l Edison. Company.
3
,
s
Distribution
cc w/ enclosures:
T. J..Maiman, Vice President,
-PWR Operations
'T. Kovach,-Nuclear
Licensing Manager
R.EPleniewicz, Station Manager
DCD/DCB(RIDS)'
Licensing Fee Management' Branch
Resident Inspectcr, RIII Byron
Resident Inspector, RIII
Braidwood
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, of.ief, Public
. Utilities Division
Diane Chavez, DAARE/ SAFE-
.L. 01shan,_NRR LPM
H.. S. Taylor,- Quality Assurance