ML20244C368

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/89-11 & 50-499/89-11 on 890401-30 & Notice of Violation
ML20244C368
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/07/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20244C372 List:
References
RTR-NUREG-0588, RTR-NUREG-588 NUDOCS 8906140236
Download: ML20244C368 (3)


See also: IR 05000498/1989011

Text

. - _ - _ .- ____ __ _ _ _ _ _ _ _ - _ - _ _ _ - _ _ _ _ __

.' ;I  : M TH

In' Reply Refer To:

Dockets: 50-498/89-11

50-499/89-11

Housto.z !ighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.'0. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. J. E. Bess, J. I. Tapia,

R. J. Evans D. L. Garrison, and R. V. Azua of this office during the period

April 1-30,1989, of activities authorized by NRC Operating Licenses NPF-76 and

NPF-80 for the South Texas Project, Units 1 and 2, and to the discussion of our

findings with Mr. W. H. Kinsey and other members of your staff at the conclusion

of the inspection.

Areas examined during the inspection included plant status for both units,

followup of events - Unit 1, operational safety verification for both units,

monthly maintenance observations, monthly surveillance observation, and

preparation for refueling observation - Unit 1. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2 Title 10, Code of Federal Regulations.

L *esponse should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

The response requested by this letter is not subject to the clearance procedures

of the Office of Managehent and Budget as required by the Paperwork Reduction

Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

Original Siped D3

drtm E. 5 b. N I bOAA

James L. Milhoan, Director

Division of Reactor Projects

Enclosures: (seenextpage)

  • RIV: SRI *RI * SRI *RI *TPS *C:PSS

JEBess/lr RJEvans JITapia DLGarrison RVAzua TFStetka

/ /89 / /89 /,/89 / /89 / /89 / /89

'

  • DRP/D *C:DRP/D D: F j

DMHunnicutt EJHoller JLNil oan

89

I

(

/ /89 / /89 Q

8906140236 890607

PDP ADOCK 05000498

i_

Q PDC . - _ _ _ _ _ __

__ -- _ _ _ _ _ . _ _ _ _ . - ____ __.

- -___- . . _ - - . .. .

f

.. . .

,

j, 4 - *

.

i

Houston Lighting & Power Company -2-

Enclosures:

1. Appendix' A - Notice of Violation-

,

,

2. . Appendix B - NRC Inspection Report

50-498/89-11

,

50-499/89-11

v cc w/ enclosures: '

  • > Houston Lighting 8.: Power Company

19- ' ATTN:' M. A..McBurnett, Manager

<

Operations Support Licensing .

P.O. Box 289- g.

Wadsworth, Texas '77483

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice; President

.

.- . Nuclear Operations

P.O. Box 289.

.Wadsworth.-Texas 77483 r

~

Houston Lighting & Power Company

ATTN: J.- T. Westermeier, General Manager

South Texas Project

P.O. Box 289

Wadsworth, Texas. 77483

' Central. Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating

-Officer

721 Barton Springs Road

Austin, Texas 78704

Newman & Holtzinger, P.C.

ATTN: J. R. Newman,-Esquire

1615 L Street, N.W.

Washington, D.C. 20036

Houston Lighting & Power Company

l- ' ATTN: S. L. Rosen

l P.O. Box 289

l- 'Wadsworth, Texas 77483

Houston Lighting & Power Company

ATTN: 'R. W. Chewning, Chairman

Nuclear Safety Review Board

P.O. Box 289

Wadsworth, Texas 77483

e_ ._= _. _ - _ _ __= __ - -__-__ __ - _- -_ _ _______ _ -

- - - - _ _ _ _ - - - - - - - - - - - - - - - - - - - - - _ - _ _ _ _ _ _ - - - - - - -

- *

.

.

. - -

.

Houston Lighting & Power Company -3-

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771-

San Antonio, Texas 78296

Houston Lighting & Power Company

ATTN: Licensing Representative

Suite 610

Three Metro Center

Bethesda, Maryland 20814

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP *RRI
  • Section Chief (DRP/D) *DRS
  • MIS System *RPB-DRSS

Lisa Shea, RM/ALF *RIV File

R. Bachmann, 0GC *RSTS Operator

  • G. Dick, NRR Project Mana 13-D-18) *R. D. Martin
  • Project Engineer (DRP/D) ger (MS: G. F. Sanborn
  • w/766

w--- - -