ML20244C261

From kanterella
Jump to navigation Jump to search
Forwards Engineering Evaluation on Cooldown During Loss of Control Room Test on 810914.Contributing Factor to Magnitude of Transient Was Inability of Operators to Control Auxiliary Feedwater Addition
ML20244C261
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 04/14/1983
From: Zukor D
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Seyfrit K
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML20244C265 List:
References
AEOD-E306, NUDOCS 8304210569
Download: ML20244C261 (1)


Text

, _ _ _ _ _ _ _ _

C

, g[2?arg# UNITED STATES

  1. h, NUCLEAR REGULATORY COMMISSION j g WASHINGTON, D. C. 20555 n- ,;

%,*****,/ APR 141983 l

MEMORANDUM FOR: Karl V. Seyfrit, Chief AE00/E306 Reactor Operations Analysis Branch Office for Analysis and Evaluation of Operation Data FROM: Dorothy J. Zukcr Reactor Operations Analysis Branch

SUBJECT:

C00LDOWN DURING LOSS OF CONTROL ROOM TEST Enclosed please find the engineering evaluation on the loss of control room test at McGuire Unit 1.

_ h u.tb

&ckt7 Dorothy Ji Z ord Reactor Operations Analysis Branch  !

f JA k. Y l

#/

'//

l i

8304210 569 XR 1 PP