Requests That 60-days Advance Submittal Requirement Be Waived & Core Surveillance Rept Will Be Submitted by 890428, Per Reactor Trip Experience on 890225
ML20244B661
Person / Time
Site: North Anna 
Issue date: 04/13/1989
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-192, NUDOCS 8904190318
Download: ML20244B661 (2)


Text

_- -

c Y

-9 VINGINIA ELECTRIC AND Powsu COMI%NY RIcirwoNu,VIROINIA 20261 April 13, 1989

~ W. H.CAurwmsoner Vace Passinant NucLnAm,

United _ States Nuclear Regulatory Commission Serial No.89-192 Attention:

Document Control Desk NO/JBL:jmj Washington, D.C. 20555 Docket No.

50-338 License No. NPF-4 4

- Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION -UNIT 1 TECHNICAL SPECIFICATION REPORTING REQUIREMENTS

- FOR THE CORE SURVEILLANCE REPORT North Anna _ Unit 1 was originally scheduled to complete its seventh cycle of operation on February 3,.1989.

However, because of system load demands and changing outage' schedules for other plants within our system, the North Anna Unit.1 refueling outage was postponed until April 10, 1989.

This schedule change required reactor operation beyond the burnup range used for the initial cycle 8 reload core design.

The cycle 8 core redesign process was scheduled l to-be complete in time to support the April 10, 1989 refueling outage.

However, North _ Anna Unit 1 cycle 7 operation was terminated on February 25, 1989 when the unit experienced a reactor trip

. caused by the closure of a main feedwater regulating valve.

Circumstances accompanying the reactor trip dictated that North Anna Unit 1 commence the cycle 7/ cycle 8 refueling outage earlier than scheduled.

North Anna Unit 1 is currently scheduled to begin cycle 8 operation on June 15, 1989.

Technical Specification 6.9.1.7 requires that the Core

- Surveillance Report for each cycle be submitted to your staff 60 days prior to cych startup.

Because cycle 7 operation was terminated approximately 1-1/2 months earlier than expected, the cycle 8 startup date has also been moved forward and we are unable to complete the reload core redesign and l

safety analysis in time to meet the 60 day requirement.

However, the Technical Specification provides for an alternate submittal date with NRC written approval.

Therefore, in accordance with this Technical

~

8904190318 890413 ADoCKoSooge DR

---l

v

,.y va Specification' provision, we request the sixty day advance submittal-requirement be waived by the NRC, and alternately, we propose to submit the required Core Surveillance Report by April 28, 1989.

Based on a preliminary assessment, Technical Specification changes are not expected to be required to support the cycle 8 reload core design.

Should you have any-questions, please contact 'us at your. earliest convenience.

Very _ truly yo rs, W.. R. Cartwright cc:

U.S. Nuclear Regulatory Commission Region -ll