ML20244B584

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/89-12 on 890327-31 & Notice of Violation
ML20244B584
Person / Time
Site: River Bend 
Issue date: 04/07/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20244B587 List:
References
NUDOCS 8904190280
Download: ML20244B584 (2)


See also: IR 05000458/1989012

Text

.

.

.

_.

.

_

.

- .

..

y

.

APR LT 1989.

'

n:

s,

,

.

,

j

.In Reply'Re'fer'To:

Docket: 50-458/89-12

,

' Gulf State's' Utilities.

.

ATTN: Mr. James C. Deddens

r

L

Senior Vice President'(RBNG)

.P.O. Box 220

L

St. Francisville. Louisiana 70775

' Gentlemen:

.This refers to the inspection conducted by.Mr. L. D.- Gilbert of_this office.

during the-period March 27-31,11989 of activities authorized by NRC Operating

License NPF-47. for River Bend Station, and to the discussion of our findings

'with you and other members'of your. staff at the conclusion:of the inspection.

f

The area examined during the inspection.was welding' activities. Within this

area,;the inspection consisted of selective examination of procedures and

,

representative records, interviews'with personnel, and observations by the NRC

inspector. The inspection findings are documented in the enclosed inspection

-

report.

'

"

During this' inspection,-it was found that certain of your activities were in

violation of NRC requirements.- Consequently, you are required to respond to -

.

the violations, in writing, in accordance with the provisions of Section 2.201

. of the NRC's " Rules of. Practice," Part 2. Title 10. Code of Federal Regulations.

.Your response should be based on the specifics contained in the Notice of

' Violation enc 1csed 'with :this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

-by the Paperwork Reduction Act of 1980, PL 96-511.

4

,

Should you:have any questions concerning this inspection, we will be pleased to

discuss them with you.-

4-

Sincerely,

/s/T7hkea~

L. J. Callan, Director

Division of Reactor Projects

<

L

. Enclosures:

1.. Appendix A - Notice of Violation

i

2. -Appendix B - NRC Inspection Report

-50-458/89-12

cc w/ enclosures:

(seenextpage)

RIV:Rl*

C:MQPS*

D:DRS*

D:DRP*

.LG11bert/cjg

-IBarnes

JLMilhoan

LJCallan

q

-/ -/89

/ /89

/ /89

/ /89

  • previously concurred

f j

..

,

j gqg$ 7

gs

'

-

.

i

_ _ _ _ _ _ _

.;

.

'

.

,

7

Gulf. States Utilities'

-E-

..

L

Enclosures:

Gulf States Utilities

~ ATTN:

J. E. Booker, Manager-

River. Bend Oversight

i

P.O. Box 2951

Beaumont, Texas 77704

Gulf States Utilities

ATTN: Les England. Director

u

-Nuclear Licensing - RBNG

'

P.O. Box 220

. St. Francisville, Louisiana 70775

Lobisiana State University.

.

Government Documents Department

4

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by,RIV:

  • DRP

f

  • RRI
  • R. D.: Mar

n. RA

  • SectionChief(DRP/C)

Lisa S

,RM/ALF

  • MIS System

-

- *RPB-

S

  • RSTS Operator
  • Pr ect Engineer, DRP/C
  • RIV File

.Paulson,NRRProjectManager(MS:

13-D-18)

DRS(2)

  • I. Barnes.
  • L. Gilbert

-

'

  • w/766.

p-

i

w-

l

. _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ - - - - - - _ - _ - _ - _ - - - _ - - _