ML20244B584

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-458/89-12 on 890327-31 & Notice of Violation
ML20244B584
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/07/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Deddens J
GULF STATES UTILITIES CO.
Shared Package
ML20244B587 List:
References
NUDOCS 8904190280
Download: ML20244B584 (2)


See also: IR 05000458/1989012

Text

. _. . _ .

- . ..

. .

'

n:y

s, .

, .

APR LT 1989.

,

j .In Reply'Re'fer'To:

,

Docket: 50-458/89-12

' Gulf State's' Utilities.

.

r ATTN: Mr. James C. Deddens

L Senior Vice President'(RBNG)

.P.O. Box 220

L St. Francisville. Louisiana 70775

' Gentlemen:

.This refers to the inspection conducted by.Mr. L. D.- Gilbert of_this office.

during the-period March 27-31,11989 of activities authorized by NRC Operating

License NPF-47. for River Bend Station, and to the discussion of our findings

f 'with you and other members'of your. staff at the conclusion:of the inspection.

The area examined during the inspection.was welding' activities. Within this

,

area,;the inspection consisted of selective examination of procedures and

representative records, interviews'with personnel, and observations by the NRC

inspector. The inspection findings are documented in the enclosed inspection

-

report.

'

"

During this' inspection,-it was found that certain of your activities were in

violation of NRC requirements.- Consequently, you are required to respond to -

.

the violations, in writing, in accordance with the provisions of Section 2.201

. of the NRC's " Rules of. Practice," Part 2. Title 10. Code of Federal Regulations.

.Your response should be based on the specifics contained in the Notice of

' Violation enc 1csed 'with :this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

-by the Paperwork Reduction Act of 1980, PL 96-511.

4 ,

Should you:have any questions concerning this inspection, we will be pleased to

discuss them with you.-

4-

Sincerely,

/s/T7hkea~

L. J. Callan, Director

Division of Reactor Projects <

L . Enclosures:

1.. Appendix A - Notice of Violation i

2. -Appendix B - NRC Inspection Report

-50-458/89-12

cc w/ enclosures: (seenextpage)

RIV:Rl* C:MQPS* D:DRS* D:DRP*

.LG11bert/cjg -IBarnes JLMilhoan LJCallan q

-/ -/89 / /89 / /89 / /89

  • previously concurred

1

..

, f j  ;

'

j gqg$ 7 gs

- .

i

_ _ _ _ _ _ _

.; .

'

. ,

7

.. Gulf. States Utilities' -E-

L Enclosures:

Gulf States Utilities

~ ATTN: J. E. Booker, Manager-

River. Bend Oversight

i

P.O. Box 2951

Beaumont, Texas 77704

Gulf States Utilities

ATTN: Les England. Director u

'

-Nuclear Licensing - RBNG

P.O. Box 220

. St. Francisville, Louisiana 70775

Lobisiana State University. .

Government Documents Department 4

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by,RIV:

  • RRI
  • DRP
  • R. D.: Mar n. RA

f *SectionChief(DRP/C) -

Lisa S ,RM/ALF * MIS System

- *RPB- S *RSTS Operator

  • Pr ect Engineer, DRP/C *RIV File
  • .Paulson,NRRProjectManager(MS: 13-D-18)

DRS(2) *I. Barnes.

  • L. Gilbert

-

'

  • w/766.

p-

i

w-

l

. _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ - - - - - - _ - _ - _ - _ - - - _ - - _