Confirms 890530 Discussion Re 890614 Enforcement Conference in Glen Ellyn,Il to Discuss Violations Noted in Insp Rept 50-461/89-14 Re Discrepancies in Environ Qualification of Plant Equipment & Issues in
ML20244B430
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/07/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
References
EA-88-241, EA-89-059, EA-89-59, NUDOCS 8906130108
Download: ML20244B430 (3)


See also: IR 05000461/1989014

Text

pWGO

UNITED STATES e

' j

$

NUCLEAR ' REGULATORY l COMMisslON

f ,

S

REGION lli;

'

In

if

. 799 ROOSEVELT,RO AD

g

y

CLEN ELLYN ILLINots ' 60137

IJUN . 7f 1989 :

Docket No. 50-461

~

]

EA 89-059

EA 88-241

' Illinois. Power Company-

,

ATTN: Mr. - W. C. Gerstner

'

Executive:Vice President-

1

500 South 27th Street'

l

Decatur,- 11.- 62525

ll

J

,

-)

~ Gentlemen:

,

.

.

.

1

This confirms our plans' as discussed on May 30, 1989 between Mr. B. Drouin -

]

of this office and Mr. D. Holtzscher. of your staff to conduct an Enforcement

J

Conferenceat1:00p.m.(CST)onJune 14,.-'1989 at the Region III office in

l

Glen Ellyn, Illinois. The purpose of the Enforcement Conference is" twofold:

!

1.

To discuss those issues forwarded to you by an NRC letter,: dated.

.,

February 14, 1989, regarding Office of Investigations report number

i

3-86-008.

(Note: The meeting was originally scheduled for June 8,

!

1989)

2.

To discuss the ap(parent violations documented in Inspection Report

i

No. 50-461/89014 DRP).concerning several:. discrepancies in the

i

environmental qualification (EQ) of. plant equipment.

At-the Enforcement Conference, yco should be prepared 'to. discuss ~ those issues

relating to the Office of Investigations report,and those EQ issues-described

!

in the enclosure to this letter. We request-you provide a handout'at the-

1

Enforcement Conference that describes your position on the discussion. topics.

.

We will gladly discuss any questions you may have regarding.this ma'tter.

Sincerely,

h=Ak-

, ,+:~

Edward G.-Greenman, Director

Divisicn of Reactor Projects

l

See Attached Distribution

l

V\\

8906130108 890607

'

{DR. ADOCK 05000461

PDC

)

__--- _ - _

__

. _ .

._

__

...

f

.a i

~

LNJN 71989

1114nois' Power Company

2-

~

Dis tribution

cc: !D. P. Hall, Vice President'

J.oS. Perry, Assistant

Vice President

R..D.. Freeman,' Manager,.

-Nuclear StationL

-

in

epartment.

9

'

r%;iMeensi g"Fes

'nagement Branch

-

Resident Inspector, RIII.

. Richard Hubbard

J. W. McCaffrey,fChief,2 Fublic

Utilities Division .

'

H. S. Taylor,: Quality Assurance.

.

..

Division, Sargent & Lundy-

Engineers

David Rosenblatt, Governor's

' Office of Consumer Services

Sheldon Zabel, Esquire,-

Schiff, Hardin, & Waite

L. Larson, Project Manager,

General. Electric Company

Chairman of DeWitt County

Illinois Department of.

Nuclear Safety

D.- Schopfer, Project Manager,

Sargent & Lundy Engineers

3

!

'

~-

i

I

!

!

,

.

.

l

_ - - _ _ _ _ _ _ _ - _ - _

.:

ENCLOSURE

-

ENFORCEMENT CONFERENCE DISCUSSION TOPICS

1.

Discuss the safety significance of the EQ discrepancies identified in the

following plant equipment.

l

a.

Hydrogen Igniters

b.

GE Instrument Racks

c.

Solenoid (ASCO) Valve Leads

d.

Damper Assembly on the Standby Gas Treatment System

e.

Electrical Penetration Enclosures (i.e. the construction of the

enclosures could subject the terminal blocks to direct spray for

which the terminal blocks are not environmental ' qualified).

2.

A summary of action taken to correct the above discrepancies as outlined

in the May 16, 1989 IP letter to Region III, " Environmental Qualification

Issues at Clinton Power Station."-