ML20244B425

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-353/89-11 on 890213-0326.No Violations Noted
ML20244B425
Person / Time
Site: Limerick Constellation icon.png
Issue date: 04/10/1989
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20244B428 List:
References
NUDOCS 8904190195
Download: ML20244B425 (2)


See also: IR 05000353/1989011

Text

_ _ - _ - _

^

.

.

.

m. "

'

..

,.

(

c

10 APR 1989

Docket-No.'50-353'

Philadelphia Electric Company

-ATTN: 'Mr. C. A; McNeill

' Executive Vice President-Nuclear

Correspondence Control Desk

P.O. Box 17520

. Philadelphia, PA' '19101

Gentlemen:

Subject:

Inspection Report 50-353/89-11

This letter transmits our report of the routine resident. safety inspection by

Messrs. R.:A. Gramm and R..L. Fuhrmeister on February 13.to March 26, 1989 at

the Limerick Generating Station, Unit 2, Limerick, Pennsylvania of activities

authorized.by NRC License No. CPPR-107 and to the discussions held by the-

-

inspectors with Messrs.:.W; T. . Ullrich,- A. .S. MacAinsh and other members' of :

your staff at the conclusion of the inspection.

Areas examined during'this inspection are described in the enclosed NRC Region

I Inspection Report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel and observations by the -inspectors.

No. violations were identi"ied and no response to this letter is required.

The Limerick Generating Station Unit 1 and Unit '2 rasident inspe tor offices

have been combined under a single Senior Resident Inspector, Thomas Kenny.

Subsequent resident inspection reports will be issued as combined reports for

both Unit 1 (Docket No. 50-352) and Unit 2 (Docket No. 50-353).

Specialist

inspections will continue to be single unit'reporcs for the present time.

.

Your cooperation is appreciated.

Sincerely,

ORIGINAL SIGileD B"

i

EDWARD C. WENZINGER

Edward C. Wenzinger, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosures:

1.

NRC Region I Inspection Report 50-353/89-11

0FFICIAL RECORD COPY

IR LIM 2 89-11 - 0001.0.0

04/10/89

8904190195 890410

//

'

PDR

ADOCK 05000353

  1. e' ' O / ' ,'i

-- - - ^]

'

G

PDC

___-__

- . ..

. - - -_

-

1

E*

JA ' '

L ~ *.

.

.

..

.

..

Philadelphia Electric Company

"2 '

~10 APR 1989 _

,

4

cc w/encis:

. John-S. Kemper,.Sr.i Senior:Vice President-Nuclear-

S. J. Kowalski, Vice President, Nuclear. Engineering:

W. ' T. Ullrich,-- Manager, ' Limerick Unit. 2 Startup -

A. S. MacAinsh, Manager, Limerick Quality, Division

Graham 1Leitch, Vice President', Limerick Generating Station.

'J. W. Gallagher,7 Vice . President-Nuclear- Services

Troy B. ; Conner, Jr.. ,: Esquire t

Eugene' J.- Bradley, Esquire, Assistant General Counsel

Dave Honan, PEco Licensing

-Public. Document Room (POR).

(

. Local Public Document. Room (LPDR)

b

Nuclear. Safety Information Center (NSIC)'

'

NRC~ Resident-Inspector.

Commonwealth of Pennsylvania-

E..L'. Conner, RI-

E.: Baker, NRR'-

J.-Conway,:NRR-

.bcc w/encls:

.

Region-I Dock'et Room (with concurrences)

Management Assistant, DRMA.(w/o' enc 1)

--J. Linville, Section Chief, RPS 2A

'J; Durr, Branch Chief, DRS

-SLO

..

Ra Clark, NRR.

-M.' Johnson,'ED0

yI, Limerick 1

U

LI:DRP:

R

Linville/rbl.

ger

,

4/}/89

4/ /89

,

t

0FFICIAL RECORD COPY

IR LIM 2 89-11 - 0002.0.0

04/06/89

_ - _ _

_-____-____-__-_-__________-____-____________-__--___-__-____2