Revised Monthly Operating Rept for Feb 1989 for Braidwood Nuclear Power Station Unit 1
ML20244B248
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 02/28/1989
From: Peterson M
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20244B250 List:
References
NUDOCS 8906130041
Download: ML20244B248 (1)


Text

_ _ - _ _ - _ - _ _ _ ._

B. OPERATING DATA REPORT DOCKET NO.: 50-456 .

l

' UNIT: Braidwood 1 DATE: 03/10/89 COMPILED BY: M. W. Peterson TELEPHONE: (815)458-2801 ext. 2480 OPERATING STATUS

1. Reporting Period: February, 1989 Gross Hours: 672.0
2. Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (HWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120
3. Power level to which restricted (If'Any): None _ _
4. Reasons for restriction (If Any): None THIS MONTH YR TO DATE CUMULATIVE
5. Report period Hours: 672.0 1416.0 5145.0
6. Hours Reactor Critical: 501.3 935.0 4445.4
7. RX Reserve Shutdown Hours: 0.0 0.0 0.0
8. Hours Generator on Line: 487.5 920.4 4331.8
9. Unit Reserve Shutdown Hours: n_n 0.0 0.0
10. Gross Ther.nal Energy (MWH): 13227543 l
11. Gross Elr.c. Energy (MWH): 1491310 ] _7857081 M024 996132 4585096
12. Net Elec. Energy (MWH): 494841 948157 4372381
13. Reacter Service Factor: 74.6 66.0 86.4
14. Reactor Availability Factor: 74.6 66.0 86.4
15. Unic Service Factor: 72.5 65.0 84.2 _
16. Ur.it Availability Factor: 72.5 65.0 84.2
17. Unit Capacity Factor (MDC net): 65.7 59.8 75.9
18. Unit Capacity Factor (DER net): 65.7 59.8 75.9 l 19. Unit Forced Outage Rate: 5.3 2.9 7.4 l 20. Unit Forced Outage Hours: 27.1 27.1 345.1 l 21. Shutdowns Scheduled Over Next 6 Months: - Refueling Outage September 1989
22. If Shutdovn at End of Report Period, Estimated Date of Startup:

l l

l 8906130041 6i70228 PDR ADOCK 05000456 R PDC (4957z/4)