Revised Monthly Operating Rept for Feb 1989 for Braidwood Nuclear Power Station Unit 1
ML20244B248
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 02/28/1989
From: Peterson M
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20244B250 List:
References
NUDOCS 8906130041
Download: ML20244B248 (1)


Text

_ _ - _ _ - _ - _ _ _

B.

OPERATING DATA REPORT DOCKET NO.:

50-456 l

UNIT: Braidwood 1 DATE: 03/10/89 COMPILED BY:

M. W. Peterson TELEPHONE:

(815)458-2801 ext. 2480 OPERATING STATUS 1.

Reporting Period:

February, 1989 Gross Hours:

672.0 2.

Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (HWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120 3.

Power level to which restricted (If'Any): None 4.

Reasons for restriction (If Any): None THIS MONTH YR TO DATE CUMULATIVE 5.

Report period Hours:

672.0 1416.0 5145.0 6.

Hours Reactor Critical:

501.3 935.0 4445.4 7.

RX Reserve Shutdown Hours:

0.0 0.0 0.0 8.

Hours Generator on Line:

487.5 920.4 4331.8 9.

Unit Reserve Shutdown Hours:

n_n 0.0 0.0 10.

Gross Ther.nal Energy (MWH):

1491310 ] _7857081 13227543 l

11.

Gross Elr.c. Energy (MWH):

M024 996132 4585096 12.

Net Elec. Energy (MWH):

494841 948157 4372381 13.

Reacter Service Factor:

74.6 66.0 86.4 14.

Reactor Availability Factor:

74.6 66.0 86.4 15.

Unic Service Factor:

72.5 65.0 84.2 _

16.

Ur.it Availability Factor:

72.5 65.0 84.2 17.

Unit Capacity Factor (MDC net):

65.7 59.8 75.9 18.

Unit Capacity Factor (DER net):

65.7 59.8 75.9 l

19.

Unit Forced Outage Rate:

5.3 2.9 7.4 l

20.

Unit Forced Outage Hours:

27.1 27.1 345.1 l

21.

Shutdowns Scheduled Over Next 6 Months: - Refueling Outage September 1989 22.

If Shutdovn at End of Report Period, Estimated Date of Startup: