_ _ - _ _ - _ - _ _ _
B.
OPERATING DATA REPORT DOCKET NO.:
50-456 l
UNIT: Braidwood 1 DATE: 03/10/89 COMPILED BY:
M. W. Peterson TELEPHONE:
(815)458-2801 ext. 2480 OPERATING STATUS 1.
Reporting Period:
February, 1989 Gross Hours:
672.0 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (HWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120 3.
Power level to which restricted (If'Any): None 4.
Reasons for restriction (If Any): None THIS MONTH YR TO DATE CUMULATIVE 5.
Report period Hours:
672.0 1416.0 5145.0 6.
Hours Reactor Critical:
501.3 935.0 4445.4 7.
RX Reserve Shutdown Hours:
0.0 0.0 0.0 8.
Hours Generator on Line:
487.5 920.4 4331.8 9.
Unit Reserve Shutdown Hours:
n_n 0.0 0.0 10.
Gross Ther.nal Energy (MWH):
1491310 ] _7857081 13227543 l
11.
Gross Elr.c. Energy (MWH):
M024 996132 4585096 12.
Net Elec. Energy (MWH):
494841 948157 4372381 13.
Reacter Service Factor:
74.6 66.0 86.4 14.
Reactor Availability Factor:
74.6 66.0 86.4 15.
Unic Service Factor:
72.5 65.0 84.2 _
16.
Ur.it Availability Factor:
72.5 65.0 84.2 17.
Unit Capacity Factor (MDC net):
65.7 59.8 75.9 18.
Unit Capacity Factor (DER net):
65.7 59.8 75.9 l
19.
Unit Forced Outage Rate:
5.3 2.9 7.4 l
20.
Unit Forced Outage Hours:
27.1 27.1 345.1 l
21.
Shutdowns Scheduled Over Next 6 Months: - Refueling Outage September 1989 22.
If Shutdovn at End of Report Period, Estimated Date of Startup:
l l
l 6i7 228 8906130041 0
PDR ADOCK 05000456 R
PDC (4957z/4)