Proposed Tech Specs,Changing Action Statements 3 & 4 of Table 3.3-11 to Clarify Wording to State That Inoperable Reactor Vessel Level Indicating Sys Channel Will Be Returned to Operable Status as Stated
ML20244B026
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/06/1989
From:
ALABAMA POWER CO.
To:
Shared Package
ML20244B025 List:
References
NUDOCS 8904180328
Download: ML20244B026 (3)


Text

{{#Wiki_filter:_ _ _ ._ _ ._ _.

i. 4. .i ? q . -._

f ,

                                                                                                                ,        ; .- , -j l

g.. , 1- 4

                                       .                                                                                         i 4

i i Enclosure'1

                                                                                        'Propo. sed Changed _Pages Unit 1-                     Revision
                                                                  -Page 3/4 3-57a                              Add Unit 2                     Revision Page 3/4 3-57a                             Add r

7. 8904180328$hh340: PDR ADOCK pg P 4 l~- -_---a.___._._--________a___ __ _,_ _ _ _ _ _ _ _ _

e . 'l Table 3.3-11 (Continued) i ACTION STATEMENTS 1 li 1 1 ACTION 1 - Vith the number of OPERABLE accident monitoring channels ) less.than the Required Number of Channels shown in Table -{ 3.3-11, restore the inoperable channel to OPERABLE status ' vithin 7 days or be in at least HOT SHUTDOWN within the next 12 hours. ACTION 2 - Vith the number of OPERABLE accident monitoring channels less than the' Minimum Channels OPERABLE requirements of Table 3.3-11, restore the inoperable channel (s) to OPERABLE status within 48 hours or be in at least HOT SHUTDOVN vithin the next 12 hours. ACTION 3 - 'Vith the number of OPERABLE channels one less than the Required Number of Channels shown in Table 3.3-11, restore the inoperable channel to OPERABLE status within 7 days. If repairs are not feasible without shutting down, prepare and submit a Special Report.to the Commission pursuant to the Specification 6.9.2 within 30 days following the event , outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status. ACTION 4 - Vith the number of OPERABLE channels less than the Minimum Channels OPERABLE requirements of Table 3.3-11, restore the inoperable channels to OPERABLE status within 48 hours. If repairs are not feasible without shutting down:

1. Initiate an alternate method of monitoring the reactor vessel inventory; and
2. Prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 vithin 30 days following the event outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status; and ,
3. Restore at least one channel to OPERABLE status at the ,

next scheduled refueling outage. FARLEY-UNIT 1 3/4 3-57a Amendment No. l

F

      <                     ~

x 7,g . 7 b

 '.,w.'     sq Table 3.3-11 (Continued)

ACTION STATEMENTS-1 ACTION 1 - 'With'the number of OPERABLE accident' monitoring channels-lessEthan the-Required Number of Channels shown in Table 3.3-11, restore.the inoperable. channel to OPERABLE status within 7 days or be in at least HOT SHUTDOWN.within the next.12 hours. ACTION 2 --- With the number of OPERABLE accident monitoring channels less than the Minimum Channels OPERABLE requirements of Table 3.3-11, restore the inoperable channel (s) to OPERABLE-status within 48 hours or be in at least HOT. SHUTDOWN within. the next 12 hours. ACTION 3 - 'Vith the number of OPERABLE channels one less than the Required Number of Channels shown in Table 3.3-11, restore the inoperable channel-to OPERABLE status within 7 days. If repairs are not feasible without' shutting down, prepare and submit a Special Report to the Commission pursuant to the Specification 6.9.2 within 30 days.following the event.

                                      . outlining the. action taken, the'cause of the inoperability, and.

the plans and schedule for restoring the system to OPERABLE status. ACTION 4 - With the number of OPERABLE channels less than the' Minimum 4 _ Channels OPERABLE ~ requirements of Table 3.3-11, restore: the inoperable channels to OPERABLE status within 48 hours.- If repairs are not feasible without shutting down:

1. Initiate an alternate method of monitoring.the reactor -

vessel inventory; and.

2. Prepare end submit a Special Report to the Commission pursuant to Specification 6.9.2 within 30 days following the event outlining the action taken, the cause of the inoperability, and the plans and schedule for restoring the system to OPERABLE status; and ,
                                                                                                              +i
3. Restore at least one channel to OPERABLE status at the ,:

next scheduled refueling outage. I i FARLEY-UNIT 2 3/4 3-57a Amendment No. l L.}}