Text
h7 p,.m -.
-[
o UNITED STATES g
- [
NUCLEAR REGULATORY COMMISSION o
r-3 I
WASHINGTON, D. C..' 3656 k****+,o April 11,1989 9
l Docket No. 50-454 Mr. Henry E. Bliss ~
Nuclear Licensing Manager Cossnonwealth Edison Cospany Post Office Box 767 Chicago, Illinois 60690
Dear Mr. Bliss:
SUBJECT:
'BYRONSTATION, UNIT 1,INSERVICEINSPECTIONPROGRAM(TACNO.60703)
-With assistance from the Idaho National Laboratory, we have reviewed your letter dated February 6,1986 May 28,1987 and September 1,1987 regarding the
'l first ten-year interval-Inservice Inspection Program Plan for Byron Station, Unit 1.
The program plan was submitted for review and evaluation of its compliance with the requirements of the 1980 Edition through Winter 1981
- Addenda of Section XI of the ASME Boiler and Pressure Vessel Code and relevant comitments made prior to plant operation.
We agree with the contractor's conclusions and recommendations presented in itsTechnicalEvaluationReport(TER) attached. We have determined that the.
Byron Unit 1 Ten-Year Inservice Inspection Program Plan,(Revision'1 is in compliance with the requirements with the exception of: 1) the licensee's application of exemption criteria to the Containment Heat Removal System (CHRS) and(2)theexemptionfromexaminationoftwoweldsofanintegralattachment that the staff has determined should be examined.
In addition, we have determined that certain Section XI Code requirements that you cited are impractical to perform at Byron Unit 1.
In such instances we have granted relief from those requirements. This relief is authorized by law and will not endanger life or property or the comon defense and security and is otherwise in the public interest given due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility. We have denied relief request NR-3, NR-12, CR-2, and SR-1. A sumary of the requirements dttached SER/TER (granting or denying the relief requests are contained in the and the bases for ).
We conclude that the Byron Station, Unit 1. Ten-Year Interval Inservice Inspection Program Plan, Revision 1, with the additional information provided and the reliefs granted, constitute part of the basis for meeting the DC
m.
E,,.
April 11, 1989 Henry E.- Bliss requirements of 10 CFR 50.55a and Technical. Specification 4.0.5.
The program plan can be considered acceptable and:in full compliance with 10 CFR 50.55a only when you provide an acce) table response to the items discussed in Sections 2.2.2 and 2.2.3 of tie attached TER.
i
. Leonard N. 01shan,' Project Manager Project Directorate III-2 d
~ Division of Reactor Projects III, IV,.Y and Special' Projects-Office of Nuclear Reactor Regulation cc:
See next page j~
, DISTRIBUTION ipocket files.
-NRC & Local PDRs
'GHolahan MVirgilio~
LLuther L01shan DMuller:
OGC EJordan BGrimes
.ACRS(10)
PDIII-2 r/f
)
f I' fog d,J PDIII-2 PDIII-2 PDIII-2 OGC p
ML01shan:km
.Lluthedh DMu11er 2/ S /89 2423 89 2/93/89 2/go/89 3
i
T.:
l I
Henry E. Bliss !
l requirements of 10 CFR 50.55'a and Technical Specification 4.0.5..
The program l
plan can be considered acceptable and in full compliance with 10 CFR 50.55a l
only when you provide an acceptable response to the items discussed in Sections 2.2.2 and 2.2.3 of the attached TER.
ybNb(
Leonard N. 01shan, Project Manager Project Directorate III-2 Division of Reactor Projects III.
IV, Y and Special Projects Office of Nuclear Reactor Regulation cc: See next page 4
6 m
)
i e
i
.u Mr. Henry E. Bliss Byron Station l
Commonwealth Edison Company Units 1 and 2 l
cc:
Mr. Jack Tain Regional Administrator Atomic Power Distribution U. S. Nuclear Regulatory Westinghouse Electric Corporation Commission Post Office Box 355 799 Roosevelt Road, Bldg. f4 Pittsburgh, Pennsylvania 15230 Glen Ellyn, Illinois 60137 Michael Miiier, Esq.
Mr. Michael C. Parker, Chief Sidley and Austin Division of Engineering One first National Plaza Illinois Department of Chicago, Illinois 60603 Nuclear Safety 1035 Outer Park Drive Springfield, Illinois, 62704 Mrs. Phillip B. Johnson 1907 Stratforc Lane Joseph Gallo, Esq.
Rockford, Illinois 61107 Hopkins and Sutter Suite 1250 Ms. Lorraine Creek 1050 Connecticut Avenue, N.W.
Rt. 1. Box 182 Washington, D.C. 20036 Manteno, Illinois 60950 Douglass Cassel, Esq.
Dr. Bruce von Zellen 109 N. Dearborn Street Department of Biological Sciences Suite 1300 Northern Illinois University Chicago, Illinois 60602 DeKalb, Illinois 61107 Ms. Pat Morrison Mr. Edward R. Crass 913 H Main Street #707 Nuclear Safeguards & Licensing Rockford, Illinois 61103-7058 Sargent & Lundy Engineers 55 East Monroe Street Attorney General Chicago, Illinois 60603 500 South 2nd Street Springfield, Illinois 62701 U. S. Nuclear Regulatory Commission Byron / Resident Inspectors Offices Chairman, Ogle County Board 4448 North German Church Road Post Office Box 357 Byron, Illinois 61010 Dregon, Illinois 61061 j
EIS Review Coordinator
]
Environmental Protection Agency
)
Region V 230 S. Dearborn Street Chicago, Illinois 60604 Commonwealth Edison Coopany Byron Station Manager 4450 North German Church Road i
Byron, Illinois 51010 l
1
_.