ML20239A592
| ML20239A592 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 09/14/1987 |
| From: | Mallett B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20239A593 | List: |
| References | |
| NUDOCS 8709170508 | |
| Download: ML20239A592 (2) | |
See also: IR 05000454/1987035
Text
--_
_ _ _ _ _ _- ____-____ _-_
DM 6
'l
.
~
eA Toll A 3 30-
i 1nnw
e t
% U ' r n
. ; g
~1 I v 3 m , g
2
SEP 141987
I
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
i
Gentlemen:
l
l
This refers to the routine safeguards inspection conducted by Mr. J. R. Kniceley
J
of.this office on August 17-21, 1987, of activities at Byron Nuclear Power
Station, Units 1 and 2, authorized by NRC Operating Licenses No. NPF-37 and
No. NPF-66 and to the dis:.:ssion of our findings with Mr. R. Querio and other
members of your staff at the concl"sion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
1
examination of procedures and representative records, observations, and
I
e
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
1
)
Areas examined during t'.iis inspection concern a subject matter which is exempt
]
from disclosure accore'ing to Part 73, Title 10, Code of Federal Regulations,
i
Section 73.21(c)(2). This information must be handled and protected in
'
accordance with the provisions of 10 CFR 73.21. ' Consequently, our report of
this inspection w'll not be placed in the NRC Public Document Room.
)
a
We will gladly discuss any ouestions you have concerning this inspection.
i
Sincere
/, .. .l
)
,
,
/
-
i
/
/
'
/
/
$ ,- -
h
-
.
Bruce S. Mallett, Ph.D., Chief
Nuclear Materials Safety and
Safeguards Branch
Enclosure:
Iaspection Report
No. 50-454/87035;
No. 50-455/87032
(UNCLASSIFIED SAFEGUARDS INFORMATION)
See Attached Distribution
1
1
'/
RIII
Kniceley/rr
~
.d
Mal,let6,closurecontains
I
870917050s e70914
.y.t7
ADDCK 05000454,
g/
SAFEGUARDS INFORMATION
'
G
//// Upon Separation this
f
-PMe u D cortralled
g
.
gppmitAnu A"InL
f
g
.
.s 0
i1
,...,i
,.
-
,
.
g
y gp/
_ _ _ _ _ _ _ _ _ _ - _
_ _ _ _ _ _ _ _ _ _ _ _ _
Commonwealth Edison Company
2
Distribution
cc w/ enclosure:
D. Butterfield, Nuclear
Licensing Manager
V-. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
!
Superintendent
R. E. Querio, Plant Manager
NRR/DRIS/SGB
NRR/DRIS/S1B
cc w/ enclosure, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
i
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Diane Chavez, DAARE/ SAFE
L. 01shan, NRR LPM
H. S. Taylor, Quality Assurance
Division
1
I
I
i
Enclosure contains
SAFEGUARDS INFORMATI0!I
Upon separation this
page is Decontrolled
'
e- ^ m l A T O M
___..
.
"f'j $ lv
, W'J ",; 4 P ' * " '
_
-
.
U. S. NUCLEAR REGULATORY COMMISSION
REGION III
Reports No. 50-454/87035; 50-455/87032
Docket Nos. 50-454/50-455
Licensee: Commonwealth Edison Company
Post Office Box 767
Chicago, IL 60690
Facility Name:
Byron Nuclear Power Station, Units 1 and 2
Inspection Conducted: August 17-21, 1987
Date of Last Physical Security Inspection:
February 9-13 and 17, 1987
Type of Inspection: Unannounced Physical Security
Inspector:
3 % L Id d antyi l a
7
/87
James R. Kniceley
U
Date
Physical Security Inspector
Approved By: S%dhb
Slot l&7
yeVamesR.' Creed, Chief
Date
Safeguards Section
Inspection Summary
,
Inspection on August 17-21,1987 (Reports No. 50-454/87035(DRSS);
No. 50-455/87032(DRSS))
Areas Inspected:
Included a review of Records and Reports; Testing and
Maintenance; Locks, Keys, and Combinations; Physical Barriers - Vital Areas;
Security System Power Supply; Compensatory Measures; Access Control - Packages
and Vehicles; Personnel Training and Qualification Requirements; Safeguards
Contingency Plan Implementation Review; and licensee actions on previously
identified open items.
Results: The licensee was found to be in compliance with NRC requirements
_
within the areas examined. All previously identified open items are closed.
(Details:
UNCLASSIFIED SAFEGUARDS INFORMATION)
Enclosure contains
SAFEGUARDS INFORMATION
.Upon separation this=
rxc? is Decontrolled
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ . _ _ _ _ _ _
=
_ _ _