ML20239A389
| ML20239A389 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/09/1987 |
| From: | Miller H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sylvia B DETROIT EDISON CO. |
| References | |
| NUDOCS 8709170304 | |
| Download: ML20239A389 (4) | |
Text
........ _ _ _ _. _
SEP 9 1987 Docket No. 50-341 The Detroit Edison Company ATTN:
B. Ralph Sylvia Group Vice President Nuclear Operations 6400 North Dixie Highway Newport, MI 48166 Gentlemen:
SUBJECT:
EQUIPMENT QUALIFICATION INSPECTION - FERMI 2 NUCLEAR PLANT This letter confirms the dates of September 21-25, 1987, for the NRC Environmental Qualification (EQ) Inspection of electrical and instrumentation equipment, at the Fermi Nuclear Station.
These dates were established during a September 3,1987, telephone conversation between Mr. S. Cashell of your staff and Mr. A. S. Gautam of my staff.
The inspection will be performed by a six member inspection team with Mr. A. S. Gautam of the Region III office as lead inspector.
The following areas will be inspected:
Implementation of corrective action commitments addressed in the final Fermi EQ Safety Evaluation Report.
Compliance to EQ regulations of 10 CFR 50.49, including Program Procedures, Master Equipment List, Maintenance, Procurement, Upgrading of Replacement Equipment, Quality Assurance and Employee Training.
Adequacy of equipment qualification files, including responses to relevant NRC Information Notices and Bulletins.
Installation and maintenance of selected plant EQ equipment.
A management entrance meeting is scheduled for 2:00 p.m. on September 21, 1987, at the plant site. A plant walkdown inspection of selected EQ equipment is scheduled for September 23, 1987, and an NRC exit meeting is scheduled for 11:00 a.m. on September 25, 1987. To facilitate NRC preparation for this inspection Mr. Cashell of your staff was requested during the September 3,1987 telephone conversation to submit the following EQ documents no later than September 11, 1987.
8709170304 870909" PDR ADOCK 050 1
0 t l
/ 80I
Y The Detroit Edison Company 2
SEP 9 1987 1.
Licensee's response to Generic Letter 84-24 (D. G. Eisenhut to licensee's and applicants dated December 27, 1984;
Subject:
Certification of Compliance to 10 CFR 50.49).
2.
a.
Master List, version in effect at the time of the inspection.
l b.
Licensee's current System Component Evaluation Worksheets (SCEW l
Sheets).
1 3.
Licensee's procedures applicable to EQ (EQ Program, procurement of qualified equipment, maintenance of qualified equipment, and modifications to plant that could affect qualified equipment).
The licensee is requested to make a presentation at the entrance meeting to address:
Organization Chart with EQ applicability.
t I
Overview of EQ Program.
Overview of EQ documentation file organization such as how files address meeting EQ criteria (10 CFR 50.49, DOR, NUREG-0588), instrument accuracy, and submergence.
Arrangements for plant walkdown (the NRC team leader will identify selected equipment samples at the entrance).
Your cooperation with us during this inspection will be appreciated.
In particular please arrange to have all inspectors escorted as visitors to avoid delays due to formal radiation training.
Should you have any questions regarding this inspection, please contact Mr. R. N. Gardner at (312) 790-5524 or Mr. A. S. Gautam at (312) 790-5523.
Sincerely, ORIGINAL SIGNED BY H. J. MILLER Hubert J. Miller, Director Division of Reactor Safety i
See Attached Distribution Af6r/
RIII RIl RI RIII Gautam/jk Gardner Harri n
r 09/04/87 09/S/87 09/T 87 09/ /87
/
i 9
U:c i ai The Detroit Edison Company 3
I 1
Distribution cc w/ enclosure:
'J' S. R. Frost, Licensing i
P. A. Marquardt, Corporate Legal Department DCS/RSB (RIDS)
Licensing Fee Management Branch c,
Resident Inspector, Rill Ronald Callen, Michigan L
Public Service Commission Harry H. Voight, Esq.
Michigan Department of l
Public Health Monroe County Office of Civil Preparedness V. Potapovs, NRR J. Stefano, PM, NRR
'I
)
)
I i
Y 6
seum LT u)o <
iO
.O M
Z t.n LaJ O vb e
i l
I i
I l
l 1
l l
\\
_ _ _ -_ _ n