NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-373 Docket No. 50-374 As a result of the inspection conducted on July 13-15, August 10-11 and 1
l September 8, 1987, and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure for NRC Enforcement Actions (1985), the followir violation was identified:
Amendment No.1 of Facility Operating Licenses No. NPF-11 (Unit 1), Section 2.0 (24) and No. NPF-18 (Unit 2), Section 2.C (15) require the licensee to maintain in effect all provisions of the approved fire protection program for LaSalle Unit I and Unit 2 describing that those provisions are included in the Safety Evaluation Report (SER) and in Supplement Nos. 1, 2, 3, 5, and 7.
As described h
specifically in the SER and Supplement No. 2, the LaSalle fire protection program includes commitments to the NRC document, " Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls, and Quality Assurance."
Attachment No. 6 (Paragraph 2.0) of this document states in part, "...
administrative controls... that govern the fire protection program shall be prescribed by documented instructions (and) procedures."
In addition, states in part that, "The fire fighting procedures should identify
... the need for brigade assistance upon... receipt of an alarm on the control room annunciator panel...."
Contrary to the above, Procedure No. LOA-FP-01 entitled " Fire Alarm Response" did not prescribe the need for fire brigade assistance upon receipt of an alarm in the control room.
It provided for an unacceptable time delay in fire brigade response to a fire through the allowed and established practice of dispatching an individual to an alanned area without alerting and assembling the fire brigade after the annunciation in the control room of the activation of a fire detector.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
BN d SEP 111987 j_
Dated J. J. Harrison, Chief Engineering Branch 8709170283 870911 DR ADOCK 050 3
-