Forwards Insp Repts 50-313/98-15 & 50-368/98-15 on 980818-21.Two Exercise Weaknesses Identified Involving Failure to Complete Initial Accountability within 30 Minutes of Site Area Emergency Declaration
ML20239A303
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 09/02/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20239A304 List:
References
50-313-98-15, 50-368-98-15, NUDOCS 9809080384
Download: ML20239A303 (5)


See also: IR 05000313/1998015

Text

s

a arc

oq'%

+

UNITED STATES

[

,e,

'i

NUCLEAR REGULATORY COMMISSION

i

.j

HEGION IV

o,

a

611 RYAN PLAZA DRIVE SUITE 400

% "-*****[

.

ARLINGTON TEXAS 76011 8064

September 2,1998

C. Randy Hutchinson, Vice President

Operations

Arkansas Nuclear 0,1e

Entergy Operations, Inc.

.

1448 S.R. 333

Russellville, Arkansas 72801-0967

SUBJECT: NRC INSPECTION REPORT 50-313/98-15; 50-368/98-15

Dear Mr. Hutchinson:

From August 18-21,1998, an announced, emergency preparedness inspection was conducted

at your Arkansas Nuclear One, Units 1 and 2 reactor facilities. The enclosed report presents

the scope and results of that inspection. A followup discussion was conducted on August 26,

1998, with Mr. Randy Gresham, and others of your staff, to address a change to the inspection

findings presented during the inspection exit meeting.

The inspection included implementation of your emergency plan and procedures during your

biennial emergency preparedness exercise. Overall, performance during the biennial exercise

was generally good; however, two exercise weaknesses were identified. The exercise

weaknesses involved: (1) the failure to complete initial accountability within 30 minutes of the

site area emergency declaration, and (2) the failure to implement proper radiological protection

practices.

Exercise weaknesses, according to 10 CFR Part 50, Appendix E.IV.F.2.g are inspection

findings that need to be corrected by the licensee. Therefore, you are requested to provide this

office with a description of your corrective measures and your schedule for completing these

actions within 30 days after receipt of this letter.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

fl W M e w e f

Blaine Murray, Chief

/

l

Plant Support Branch

[.

Division of Reactor Safety

f

o

W O90384 980902

l

r

gDR

ADOCK 05000313

PDR

.

_ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _

_.

.

. _ _ _ _ _ _ _ _ _

.__ __ ___ _ ___ - - _ __ - .

-

-__ _ -___ _____ _ __ - _

.

,

,

.Entergy Operations, Inc.

-2-

Docket Nos.: 50-313

50-368

License Nos.: DPR-51

NPF-6

Enclosure:

NRC Inspection Report

'

50-313/98-15;50-368/98-15'

cc w/ enclosure:

Executive Vice President

& Chief Operating Officer

Entergy Operations, Inc.

'

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852 '

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

Winston & Strawn

1400 L Street, N.W.-

Washington, D.C. 20005-3502

David D. Snellings, Jr., Director

Division of Radiation Control and

Emergency. Management

Arkansas Department of Health

4815 West Markham Street, Mail Slot 30

Little Rock, Arkansas 72205-3867

Manager

Rockville Nuclear Licensing

Framatome Technologies

1700 Rockville Pike, Suite 525

l

l

Rockville, Maryland 20852

L

o

,

- - - - _ - - - - - - - - -

_ _ _ - - _ _ - - _ - _ _ - _ _ _ -

.___ __

- .

.

' Entergy Operations, Inc.-

-3--

Training, Exercises, & Evaluation

Branch Chief

FEMA Region VI

- 800 North Loop 288

Fearal Regional Center

Denton, Texas 76201-3698

.

.4

>

l

l:'

_ _ _ - --__-______-______ __

.

.

Entergy Operations, Inc.

-4

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail seport to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

l

bec to DCD (IE35)

l

. bec distrib. by RIV:

Regional Administrator

Resident inspector

DRS Director

DRS Deputy Director

DRP Director

MIS System

l

Branch Chief (DRP/C)

RIV File

l

Project Engineer (DRP/C)

DRS-PSB

Branch Chief (DRP/TSS)

l

l

l

t

l

!

!

l

l

DOCUMENT NAME: R:_AN815RP.GMG

I

To receive copy of document, Indicate in box: "C" = Copy without enclosures 'E" = Copy with enclosures *N' = No copy

RIV:RI, 4

E, EPA:PS8

lE

SRS:PSB

lf SEPA:PSB

E C:DRS\\C l E

C:DRS\\PSB 1e- pV

l

gget/M

SCBurlo W # THAndrews M MPShannoMD GMGood @# CSMarschal@ BMurray /je4FD

08/77/98

08/$Y98

08/ry/98

08/).7/98

08/ff/98

08/g/98

OFFICIAL RECORD COPY

l

I

F,

-

,j.

.I.

' Entergy Operations, Inc.

-4

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

- E Mail report to NRR Event Tracking System (IPAS)

E Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE35)_

bec distrib. by RIV:

l

Regional Administrator

Resident inspector

DRS Director

DRS Deputy Director

DRP Director

MIS System

l

Branch Chief (DRP/C)

RIV File

L

Project Engineer (DRP/C)

DRS-PSB

Branch. Chief (DRP/TSS)

Ij,

I

DOCUMENT NAME: R:_AN815RP.GMG

To receive copy of document, Indicate in box: "C" = Copy without enclosures *E' = Copy with enclosures "N" = No copy

RIV:RI A

E. EPA:PSB

'l E

SRS:PSB

lf SEPA:PSB

E C:DRS\\C l E

C:DRS\\PSB [r gM,

SCBur'idhiSF# THAndrews M MPShannMO GMGood LJTW CSMarschall5 BMurray /M ggel/

08/27/98

08/TV98

08/ y/98 -

08/).7/98

08/77/98

08/w/98

1

OFFICIAL RECORD COPY

g<j007s

s

.._-._m--

.