s
a arc
oq'%
+
UNITED STATES
[
,e,
'i
NUCLEAR REGULATORY COMMISSION
- i
.j
HEGION IV
o,
a
611 RYAN PLAZA DRIVE SUITE 400
% "-*****[
.
ARLINGTON TEXAS 76011 8064
September 2,1998
C. Randy Hutchinson, Vice President
Operations
Arkansas Nuclear 0,1e
Entergy Operations, Inc.
.
1448 S.R. 333
Russellville, Arkansas 72801-0967
SUBJECT: NRC INSPECTION REPORT 50-313/98-15; 50-368/98-15
Dear Mr. Hutchinson:
From August 18-21,1998, an announced, emergency preparedness inspection was conducted
at your Arkansas Nuclear One, Units 1 and 2 reactor facilities. The enclosed report presents
the scope and results of that inspection. A followup discussion was conducted on August 26,
1998, with Mr. Randy Gresham, and others of your staff, to address a change to the inspection
findings presented during the inspection exit meeting.
The inspection included implementation of your emergency plan and procedures during your
biennial emergency preparedness exercise. Overall, performance during the biennial exercise
was generally good; however, two exercise weaknesses were identified. The exercise
weaknesses involved: (1) the failure to complete initial accountability within 30 minutes of the
site area emergency declaration, and (2) the failure to implement proper radiological protection
practices.
Exercise weaknesses, according to 10 CFR Part 50, Appendix E.IV.F.2.g are inspection
findings that need to be corrected by the licensee. Therefore, you are requested to provide this
office with a description of your corrective measures and your schedule for completing these
actions within 30 days after receipt of this letter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
fl W M e w e f
Blaine Murray, Chief
/
l
Plant Support Branch
[.
Division of Reactor Safety
f
o
W O90384 980902
l
r
gDR
ADOCK 05000313
.
_ _ _ _ _ _ . _ . _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _
_.
.
. _ _ _ _ _ _ _ _ _
.__ __ ___ _ ___ - - _ __ - .
-
-__ _ -___ _____ _ __ - _
.
,
,
.Entergy Operations, Inc.
-2-
Docket Nos.: 50-313
50-368
License Nos.: DPR-51
NPF-6
Enclosure:
NRC Inspection Report
'
50-313/98-15;50-368/98-15'
cc w/ enclosure:
Executive Vice President
& Chief Operating Officer
Entergy Operations, Inc.
'
P.O. Box 31995
Jackson, Mississippi 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286
Manager, Washington Nuclear Operations
ABB Combustion Engineering Nuclear
Power
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852 '
County Judge of Pope County
Pope County Courthouse
Russellville, Arkansas 72801
Winston & Strawn
1400 L Street, N.W.-
Washington, D.C. 20005-3502
David D. Snellings, Jr., Director
Division of Radiation Control and
Emergency. Management
4815 West Markham Street, Mail Slot 30
Little Rock, Arkansas 72205-3867
Manager
Rockville Nuclear Licensing
Framatome Technologies
1700 Rockville Pike, Suite 525
l
l
Rockville, Maryland 20852
L
o
,
- - - - _ - - - - - - - - -
_ _ _ - - _ _ - - _ - _ _ - _ _ _ -
.___ __
- .
.
' Entergy Operations, Inc.-
-3--
Training, Exercises, & Evaluation
Branch Chief
FEMA Region VI
- 800 North Loop 288
Fearal Regional Center
Denton, Texas 76201-3698
.
.4
>
l
l:'
_ _ _ - --__-______-______ __
.
.
Entergy Operations, Inc.
-4
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail seport to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
l
bec to DCD (IE35)
l
. bec distrib. by RIV:
Regional Administrator
Resident inspector
DRS Director
DRS Deputy Director
DRP Director
MIS System
l
Branch Chief (DRP/C)
RIV File
l
Project Engineer (DRP/C)
DRS-PSB
Branch Chief (DRP/TSS)
l
l
l
t
l
!
!
l
l
DOCUMENT NAME: R:_AN815RP.GMG
I
To receive copy of document, Indicate in box: "C" = Copy without enclosures 'E" = Copy with enclosures *N' = No copy
RIV:RI, 4
E, EPA:PS8
lE
SRS:PSB
lf SEPA:PSB
E C:DRS\\C l E
C:DRS\\PSB 1e- pV
l
gget/M
SCBurlo W # THAndrews M MPShannoMD GMGood @# CSMarschal@ BMurray /je4FD
08/77/98
08/$Y98
08/ry/98
08/).7/98
08/ff/98
08/g/98
OFFICIAL RECORD COPY
l
I
F,
-
,j.
.I.
' Entergy Operations, Inc.
-4
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
- E Mail report to NRR Event Tracking System (IPAS)
E Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE35)_
bec distrib. by RIV:
l
Regional Administrator
Resident inspector
DRS Director
DRS Deputy Director
DRP Director
MIS System
l
Branch Chief (DRP/C)
RIV File
L
Project Engineer (DRP/C)
DRS-PSB
Branch. Chief (DRP/TSS)
Ij,
I
DOCUMENT NAME: R:_AN815RP.GMG
To receive copy of document, Indicate in box: "C" = Copy without enclosures *E' = Copy with enclosures "N" = No copy
RIV:RI A
E. EPA:PSB
'l E
SRS:PSB
lf SEPA:PSB
E C:DRS\\C l E
C:DRS\\PSB [r gM,
SCBur'idhiSF# THAndrews M MPShannMO GMGood LJTW CSMarschall5 BMurray /M ggel/
08/27/98
08/TV98
08/ y/98 -
08/).7/98
08/77/98
08/w/98
1
OFFICIAL RECORD COPY
g<j007s
s
.._-._m--
.