ML20239A299

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1987
ML20239A299
Person / Time
Site: Limerick Constellation icon.png
Issue date: 08/31/1987
From: Alden W, Gropp R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8709170249
Download: ML20239A299 (6)


Text

-

_. - =.

('

l' AVERAGE DAILY UNIT P0HER LEVEL l

DOCKET No. 50 - 352 UNIT LIMERICK UNIT 1 DATE SEPTEtBER 15, 1987 COMPANY PHILADELPHIA ELECTRIC COMPANY R. N, GROPP TECHNICAL ASSISTANT

' LICENSING SECTION NUCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-5058 MONTH AUGUST 1987 DAY AVERAGE DAILY PDHER LEVEL'-

DAY AVERAGE DAILY P0HER LEVEL 1

( P94E-NET )

(PNE-NET) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

l 4

6 0

22 0

7 0

23 0

0 0

24 0

i 9

0 25 0

l 10 0

26 0

11.

0 27 0

12 0

28 0

13 0

29 0

g 14 0

30 0

(

15 0

31 96

/

l' 16 0

l l

s l

l 8709170249 870831 l

l.

POR ADOCK 05000352 R

l.

py

Ie E

i 6:

.4 DPERATING DATA REPDRT l

t.

4 l'

a

.j DOCKET NO. 50 - 352.

-f 1

DATE SEPTEHBER 15, 1987 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY R.' H. GRDPP TECHNICAL ASSISTANT l

LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE'1215) 841-5058 OPERATING STATUS

1. UNIT NAME: LIHERICK UNIT 1 1 NOTES UNIT RETURNED TO PDHER l

l l

2. REPORTING PERIOD AUGUST, 1987 l

OPERATION ON 8/31/87 FOLLOHING l l

l

3. LICENSED THERHAL P0HERIHHT):

3293 l

COMPLETION OF FIRST REFUELING l l

l

4. NAHEPLATE RATING IGROSS HHEli 1138 l

OUTAGE.

l i

l l

-l S. DESIGN ELECTRICAL RATING INET HHEls 1055 l

l l

l l

l

6. HAXIMUH DEPENDABLE CAPACITY (GROSS HHEls 1092 l

l j

l l

7. HAXIMUH DEPENDABLE CAPACITY INET HMEli ~ 1055 l

l

~ 8. IF CHANGES DCCUR IN CAPACITY RATINGS IITEMS IAFBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI

9. P0HER LEVEL TO HHICH RESTRICTED, IF ANY INET HHE )
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS HONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,831 13,847

...=---

12. NUMBER OF HOURS REACTOR HAS CRITICAL 112.1 3,249.2 9,966.2

_ - - - - - = -

13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 18.9 3,129.8 9,765.8 1

j 15.' UNIT RESERVE SHUTDOHN HOURS 0.0 0.0 0.0 I

}

(

16. EROSS THERNAL ENERGY GENERATED IMHHI 26,222 9,393,787 30,991,949 l
17. GROSS ELECTRICAL ENERGY GENERATED IMHH) 2,870 3,022,430 10,149,310
18. NET ELECTRICAL ENERGY GENERATED (HHH)

-10,381 2,869,483 9,718,333 PAGE 1 0F 2

OPERATING DATA REPORT (CONTINUED)

DOCKET No. 50 - 352 DATE SEP".' EMBER 15, 1987 THIS HONTH YR-TO-DATE CUHULATIVE

19. UNIT SERVICE FACTOR 2.5 53.7 7D.5
20. UNIT AVAILABILITY FACTOR 2.5 53.7 70.5
21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 46.6 66.5
22. UNIT CAPACITY FACTOR IUSING DER NET) 0.0 46.6 66.5
23. UNIT FORCED OUTAGE RATE 0.0 3.8 3.6
24. SHUTDONNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACHis REFUELING OUTAGE MAY 15, 1987 TO AUGUST 31, 1987
25. IF SHUTDONN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTvPt
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED 1

INITIAL CRITICALITY 12/19/84 12/22/84 INITIAL ELECTRICITY HID APRIL 85 4/13/85 l

COMMERCIAL OPERATION IST QTR 86 2/D1/86 I

PAGE 2 0F 2 l

a - NEGATIVE VALUE REPORTED FOR CONSISTENCY HITH FEDERAL ENERGY REGULATORY COMMISSION REPORTS.

l l

l l

l l

N

w.

_ UNIT SHUTBDM S AND PONER REDUCTIONS.

DOCKET No. 50 - 352 UNIT NAME LIHERICK UNIT 1 DATE SEPTEMBER 15, 1987 REPORT HONTH AUGUST, 1987 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY R. N. GROPP TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE (215) 841-5058 p...................................................................................

'l-1

.l l

l HETHOD OF l LICENSEE ISYSTEHlCOMPONENTl CAUSE AND CORRECTIVE

)

lTYPElDURATIONlREASONISHUTTING DOHN)

EVENT l CODE I CODE l ACTION TO

!$.1 ' DATE ~ l i l ll ( HOURS )l - ( 2 ) l REACTOR 13) l REPORT # l (4) l (5) l PREVENT RECURRENCE

~

3...........

l l~

l l

I I

I I

i

~7 l G70801 i S I 725.1 1 C l 2

1 N/A l ZZ l 777777 I UNIT SHUTDOHN ON 5/15/87 FOR REFUELING DUTAGE I

1-1 ----- I l'

I I

I I

i' l-l 725.1 i l

i i

i I

(1)

.(2)

(3)

(4)

) - FORCED:

REASON HETHOD EXHIBIT G - INSTRUCTIONS 3 - SCHEDULED A - EQUIPHENT FAILURE (EXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - HANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E -' OPERATOR TRAINING + LICENSE EXAMINATION.

F

  • ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAHE SOURCE l

l t

l t

.I PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA A. PA.19101 12151841 4000 September 15, 1987 Docket No. 50-352 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:

Document Control Desk

SUBJECT:

Limerick Generating Station Monthly Operating Report Gentlemen i

Enclosed is the monthly operating report for Limerick l

Unit 1 for the month of August 1987, forwarded pursuant to Technical Specification 6.9.1.6.

Very truly yours, J

zh*

W. M. Alden Engineer-In-Charge Licensing Section Nuclear Support Department Attachment cc:

Director, Office of Inspection & Enforcement, USNRC (12 copies)

William T. Russell, Administrator, Region I, USNRC E. M. Kelly, Senior Resident Site Inspector Mr. David E. Ney, PA Dept. of Envir. Resources Mr. P. A. Ross, NRC (2 copies)

INPO Records Center

[

'll

r.

4 O

Docket No. 50-352 Attachment to Monthly Operating Report for August, 1987 Limerick Generating Station Unit 1 August 1, through August 31, 1987 l

I.'

Narrative-Summary.of. Operating Experience i

The unit began the report period in the final stages of the first refueling outage.

The operational Hydrostatic Test and Primary Containment Integrated Leak Rate Test were both satisfactorily completed.in, preparation of startup.

On August 26, 1987, at 0420 hours0.00486 days <br />0.117 hours <br />6.944444e-4 weeks <br />1.5981e-4 months <br />, startup commenced and criticality was achieved at 0754 hours0.00873 days <br />0.209 hours <br />0.00125 weeks <br />2.86897e-4 months <br />.

On August" 31, ~ 1987,- at-0410 hours, - the : generator was synchronized and the unit returned to power operation.

t The unit ended the report period operating at approximately 23% power.

II.

Challenges to Relief Valves Or. August 28, 1987, the five (5) safety relief valves associated with the Automatic Depressurization System (ADS) tested-satisfactorily during required surveillance testing.

i l

1 l

i j

i 1

-