ML20239A112

From kanterella
Jump to navigation Jump to search

Discusses Evaluation of Licensee 980317 Response to GL 97-05, Steam Generator Tube Insp Techniques. Review of Response Did Not Identify Any Concerns W/Sg Tube Insp Techniques Employed at Point Beach,Unit 2
ML20239A112
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/31/1998
From: Wetzel B
NRC (Affiliation Not Assigned)
To: Sellman M
WISCONSIN ELECTRIC POWER CO.
References
GL-97-05, GL-97-5, TAC-MA0485, TAC-MA485, NUDOCS 9809080227
Download: ML20239A112 (2)


Text

_

l J 9, August 31, 1998 r

i I-

' Mr. Michael B. Sellman Chief Nuclear Officer

- Wisconsin Electric Power Company -

231 West Michigan Street 2 Milwaukee, WI 53201 f

SUBJECT:

EVALUATION OF RESPONSE TO NRC GENERIC LETTER 97-05 FOR POINT BEACH NUCLEAR PLANT, UNIT 2 (TAC NO. MA0485) l

Dear Mr. Sellman:

Iln a letter dated March 17,1998, Wisconsin Electric Power Company (WE) submitted a response to NRC Generic Letter (GL) 97-05, " Steam Generator Tube inspection Techniques."

lc The focus of GL 97-05 was to verify that licensee steam generator tube inspection practices

- were consistent with existing regulatory requirements and plant licensing bases. The WE f

response to GL 97-05 included a description and technical basis for all inspection techniques used to size the depth of steam generator tube degradation at Point Beach, Unit 2. The staff's review of this response did not identify any concerns with the steam generator tube inspection

(

techniques employed at Point Beach, Unit 2 that would indicate the licensee is not in compliance with the current licensing basis for this facility.

]

This completes our work for TAC No. MA0485.

L

. Sincerely,-

L ORIGINAL. SIGNED BY l

Beth A. Wetzel, Senior Project Manager

. Project Directorate 111-1 l

.. Division of Reactor Projects - Ill/IV l

' Office of Nuclear Reactor Regulation Docket No. 50-301 mn ma E pp

e

.u O

. cc: See next page 0

, DISTRIBUTION:

Docket File PUBLIC '

PD#3-1 Reading EAdensam (EGA1)

OGC

-ACRS

. PRush..

EMurphy MKunowski, Rlli

(),

DOCUMENT NAME: G:\\WPDOCS\\PTBEACH\\PTBA0485.LTR

  • No changes to memo.

To recente a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy i

[l OFFICE PM:PD31 C

PM:PD31 C

LA:PD31 C

(A)C:EMCB*

D:PD31 NAME o

db BWetzel'

.CJamerson JADavis for CACar r-

$/$/g8 h / [8/98 f/h/g 8/11/98 8 /.M /98 l DATEL OFFICIAL RECORD COPY my gg e

PDft. ADOCK 05000301 F-PDet

l i.

Mr. Michael B. Sellman Point Beach Nuclear Plant f

Wisconsin Electric Power Company Units 1 and 2 cc:

Mr. John H. O'Neill, Jr.

Ms. Sarah Jenkins l

Shaw, Pittman, Potts & Trowbridge Electric Division 2300 N Street, NW Public Service Commission of Wisconsin Washington, DC 20037-1128 P.O. Box 7854 Madison, Wisconsin 53707-7854 Mr. Richard R. Grigg l

President and Chief Operating Officer Wisconsin Electric Power. Company 231 West Michigan Street Milwaukee, Wisconsin 53201 Mr. Scott A. Patulski Site Vice President Point Besch Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks

)

13017 State Highway 42

)

Mishicot, Wisconsin 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 i

Regional Administrator, Region lli l

U.S. Nuclear Regulatory Commission l

801 Warrenville Road Lisle, Illinois 60532-4351 l

Resident inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 RAerch 19?S