l March 17, 1998 Mr. Richard R. Grigg Chief Nuclear Officer Wisconsin Electric Power Company 231 West Michigan Street, Room P379 Milwaukee, WI 53201
SUBJECT:
EVALUATION OF THE THIRD 10-YEAR INSERVICE INSPECTION INTERVAL RELIEF REQUEST RR-1-18 FOR POINT BEACH NUCLEAR POWER PLANT, UNIT 1 (TAC NO. MA1159)
Dear Mr. Gngg:
i The staff has reviewed and evaluated the information provided by Wisconsin Electric Power i
Company in its letter dated March 12,1998. You have proposed an alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code),1986 Edition,Section XI requirement IWA-2232, to use the Performance Demonstration initiative Program during the reactor pressure vessel third 10-year Inservice Inspection Interval for Unit 1. The PDI is based on Appendix Vill,Section XI of the ASME Code,1992 Edition including the 1993 addenda. The licensee requested relief based on 10 CFR 50.55(a)(3)(i).
The staff has concluded that the use of the alternative method is authorized for the requested interval pursuant to 10 CFR 50.55(a)(3)(i) since it provides an acceptable level of quality and safety. A copy of the staff's safety evaluation is enclosed.
l If you have any questions, please contact Linda L. Gundrum at (301) 415-1380.
Sincerely, ORIGINAL SIGNED BY Cynthia A. Carpenter, Director Project Directorate ill-1 Division of Reactor Projects - lil/IV 7
Office of Nuclear Reactor Regulation I
Docket No. 50-266 -
Enclosure:
Safety Evaluation cc w/ encl: See next page DISTRIBUTION: See attached page DOCUMENT NAME: G:\\WPDOCS\\PTBEACH\\PTBA1159.RR *See previous concurrence Tt receive a copy of thle stocument. Indicato in the bor "C"e Copy without attachment /encJosure "E" e Copy with attachment / enclosure "N"a No copy l OFFICE PM:PD31 lE LA:PD31 lE BC:ECGB OGC l
D:PD31 lNAME LGundrum: SAM.
CJamerson UntQ GBagchi*
MYoung*
CACarpent4S-lDATE 3/j6
/98 3/ l1' /98 3/16/98 3/16 /98 b /l'l /98 OFFICIAL RECORD COPY hp
&"Q Wm"n pq q,
l
^
9803230270 980317 PDR ADOCK 05000266 G
I
\\.
Mr. Richard R. Grigg Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos.1 and 2 cc:
Ernest L. Blake, Jr.
Shaw, Pittman, Potts & Trowbridge l
2300 N Street, N.W.
Washington, DC 20037 Mr. Scott A. Patuiski l
Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 i
Chairman
]
Public Service Commission j
of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Resident inspector's Office i
U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7954 March 1H7 i
- 4 a
DATED: March 17, 1998 RELIEF REQUEST RR-1-18 FOR FACILITY OPERATING LICENSE NO. DPR POINT BEACH UNIT 1-Docket File (50-266)