ML20238F542
| ML20238F542 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/31/1998 |
| From: | Tapia J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Eaton W ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20238F544 | List: |
| References | |
| 50-416-98-09, 50-416-98-9, NUDOCS 9809040010 | |
| Download: ML20238F542 (5) | |
See also: IR 05000416/1998009
Text
. - _ - _
. _
_
_ _ _ . _ _ - _ . _ _ _ - - - - _ _ _ _ _ _ _ _ _ _ _ _ - _ - - _ _ _
.e.
+p@**%e)'4{
.
UNITED STATES
[ ' f ,.
'
' -
NUCLEAR REGULATORY COMMISSION '
- E
REGION IV
,d[ '
0,,
611 RYAN PLAZA DRIVE, SUITE 400
- %, *M w
'
ARUNGTON, TEXAS 76011 8064
AUG- 31 1998
. William 'A.' Eaton, Vice President -
-
Operations - Grand Gulf Nuclear Station .
Entergy Operations, Inc.
4
P.O. Box 756
. Port Gibson, Mississippi 39150
SUBJECT: NRC INSPECTION REPORT 50-416/98-09
,
Dear Mr. Eaton:
From June 28 through August 8,1998, an NRC inspection was conducted at your Grand Gulf
Nuclear Station reactor facility. The enclosed report presents the scope and results of that
' inspection.
During the 6-week period covered by this inspection, your conduct of activities at Grand Gulf
was generally characterized by safety-conscious operations with strong maintenance and
engineering practices and careful radiological work controls.-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a cor,y of this letter and its
- enclosure will be placed in the NRC Public Document Room (PDR).
Should you have any questions conceming this inspection, we will be pleased to discuss them
with you.
Sincerely
I
(
ph I. Tapia, Chief
Project Branch A
Division of Reactor Projects
'
Docket No.:
50-416
,
. License No.: NPF-29
Enclosure:
i
- NRC Inspection Report
i
'
50-416/98-09
9809040010 980831
ADOCK 05000416
G
POR
u
_
_
._.
_ _ . . _ _ _ . _
_ . _ _ _ _ _
.___________d
- _ _ - . _ - - - _ _ _ _ _ _ _ _ - _ - - _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _
.
i
<
n-
.
1
Entergy Operations, Inc.
-2-
oc w/ enclosure:
- Executive Vice President
and Chief Operating Officer
1
- Entergy Operations, Inc.
i
' P.O. Box 31995
Jackson, Mississippi 39286-1_995
Wise, Carter, Child & Caraway .
..
- P.O. Box 651
Jackson, Mississippi 39205 -
.
Winston & Strawn -
1400 L Street, N.W. - 12th Floor
"
Washington, D.C. 20005-3502
Sam Mabry, Director
.
Division of Solid Waste Management
Mississippi Department of Natural
Resources
,
._ P.O.- Box 10385
Jackson, Mississippi 39209'
President
Claiborne County Board of Supervisors
Port Gibson, Mississippi 39150
General Manager--
Grand Gulf Nuclear Station
Entergy Operations, inc.
.
- P.O. Box 756 -
l Port Gibson, Mississippi .39150
The Honorable Richard Leyoub
' Attomey General
Department of Justice
.
.
State of Louisiana
.
' P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
'
Office'of the Govemor -
,
'
~ State of Mississippi
Jackson, Mississippi 39201
-
l
>3
-
-_______.._._____.______._____W
_ _ _ _ _ _ _ _ _ - -
-
-
_ . _ - .
...
l
l
l
- Entergy Operations, Inc.
-3-
Mike Moore, Attorney General
1-
Frank Spencer, Asst. Attorney General
l-
State of Mississippi
L-
P.O. Box 22947 -
Jackson, Mississippi 39225 :
Dr. F. E. Thompson, Jr.
- State Health Officer
' State Board of Health
' P.O. Box 1700
4
Jackson, Mississippi 39205
,
' Robert W. Goff, Director
State Liaison Officer-
Division of Radiation Health
Mississippi Department of Health
P.O. Box 1700
Jackson, Mississippi 39215-1700
j
-l
Vice President
' Operations Support
Entergy Operations, Inc.
P.O._ Box 31995
Jackson, Mississippi 39286-1995
I
Director, Nuclear Safety
and Regulatory Affairs:
Entergy Operations, Inc.
P.O. Box 756
Port Gibson, Mississippi 39150
.Vice President, Operations
Grand Gulf Nuclear Station
Entergy Operations,' inc.
P.O. Box 756
!
Port Gibson, Mississippi . 39150..
i
i
!
i
l
c.
j
___ ___ ____ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
..
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)-
E-Mail report to D. Lange (DJL)
g
' E-Mail report to NRR Event Tracking System (IPAS)
..
E-Mail report to Document Control Desk (DOCDESK)
,
E-Mail report to Richard Correia (RPC)
'
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)-
1
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
'
'
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A) -
RIV File
Branch Chief (DRP/TSS)
l
!
l
]
l
l
DOCUMENT NAME:. R:\\_GG\\GG809RP.JLD
To reoche oosw of :1. : ^. indloots in box: "C" = Colw without enclosures 'E" = cow with enclosures "N' = No copy
RIV:SRl:DRP/A -
PE:DRP/A -
C:DRP/A
JLDixon-Herrity*
RAKopriva*
JITapia*
8/31/98 per telecon
8/28/98
8/31/98
' *Previously. Concurred
. OFFICIAL RECORD COPY
l
L
d
_
.)
_ _ _ _ . _ _ - - _ _ _ _ _ _ _ - - _ _ _ _ ,
f
'$'
.
1
!
!
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL) -
..E Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT).
i
- bec to DCD (IE01)-
bec distrib. by RIV.
Regional Administrator-
Resident inspector
DRP Director
DRS-PSB
'
Branch Chief (DRP/A) .
MIS System
~ Project Engineer (DRP/A)
RIV File -
s
Branch Chief (DRP/TSS)
i
)
!.
DOCUMENT NAME: R:\\_GG\\GG809RP.JLD
To receive copy of document, Indicate in box: "C" = Copy without enclosures "E* = Co)y with enclosures "N" = No copy
RIV: SRI:DRP/A
PE:DRP/A
C:DRP/A
i;
JLDixon-Herrity*
RAKopriva*
JITapia*
8/31/98 per telecon
8/28/98
8/31/98
- Previously Concurred
OFFICIAL RECORD COPY
,
'
C'OU10
J
$_.l _
_
._
_
.__ .
__.
_ _ _ _ _ - _ _
_ _ _ _ _ _ _ _ _ _ _ _ _