ML20238E978
Jump to navigation
Jump to search
| ML20238E978 | |
| Person / Time | |
|---|---|
| Site: | University of California - Irvine |
| Issue date: | 08/24/1998 |
| From: | CALIFORNIA, UNIV. OF, IRVINE, CA |
| To: | |
| Shared Package | |
| ML20238E977 | List: |
| References | |
| NUDOCS 9809030026 | |
| Download: ML20238E978 (1) | |
Text
__ -______
s August 24th 1998..
' Proposed Definition Page 4. UCI Technical Specifications Docket 50-326 License R-116 1.27 -. Surveillance Activities.
Surveillance activities (except those specifically required for safety when the reactor is shutdown) may be deferred during reactor shutdown, however, they must be completed
- prior to reactor startup unless reactor operation is necessary for performance of the activity. Surveillance activities scheduled to occur during an operating cycle which cannot
- be performed with the reactor operating may be deferred to the end of the cycle.
l-eso,osooa6 9eosas e
PDR ADOCK 05o00326!'
P-PDR L.;
_-. _ _ - _