ML20238E516
| ML20238E516 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/04/1987 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20238E518 | List: |
| References | |
| NUDOCS 8709150042 | |
| Download: ML20238E516 (2) | |
See also: IR 05000348/1987018
Text
__
__ - - -
--
_.
_ - __
k
$0
>
.,
7
,
.
."
SEP 0 4'1987
'
Docket Nos. 50-348, 50-364
, License Nos.,NPF-2 and NPF-8'
I#
Alabama ~ Power. Company
ATTN: Mr. R. P. Mcdonald
= Senior Vice President.
P.-0. Box 2641
- Bi rmingham, AL
35291-0400
. Gentlemen:
SUBJECT:- NRC INSPECTION REPORT NOS. 50-348/87-18 AND 50-364/87-18
This refe.rs. to the Nuclear Regulatory Comission (NRC). inspection' conducted by:
S. S. Adamovitz on August 17-20, 1987.
The inspection. included a review of
activities euthorized for your Farley facility.
At the conclusion of the
inspection, the, findings were (discussed with .those members of your staff
identified in the enclosed inspection report.
. Areas examine'd during the inspection are identified in the report.
Within
. these. areas, the inspection consisted of selective examinations of. procedures
and representative records, interviews with personnel,: and observation of
' activities in progress. The inspector also conducted independent measurements,
in the Pegion II Mobile Laboratory at your site to verify your. capability for
analyzing radioactive effluents .and to establish and ' maintain standardized
methodology among regulated facilities and the NRC.
Within the scope of the inspection, no violations .or deviations were
identified.-
Your. attention is i.nvited to unresolved item identified in. the inspection
report. This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
870915004287090hg'
ADOCK OSOog
) '.
ppjt
<
O.
I
s
zu a
., .,
.
. ___ - -__
._____-- _ _
L l -.' !- *1
.
.' ..
.
- e'
. Alabama. Power Companyi
2
l
4 Should you have aily questions concerning this letter,-please contact us.
Sincerely,.
CRfGfNAL SIGNED BY
DOUGLAS M. COLUNS
Douglas-M. Collins,. Chief
Emergency Preparedness and .
Radiological Protection' Branch
Division of Radiation Safety
and Safeguards.
Enclosure:
Inspection Repcrt
-cc'w/ enc 1:
W. 0.-Whitt, Executive Vice President
. J. . D, Woodard, General Manager
-
Nuclear Plant.
W. G. Hairston, III, General' Manager.'-
' Nuclear Support
.
J. W. McGowan, Manager-Safety Audit
and Engineering Review.
.
J. K. Osterholtz, Supervisor-Safety
' Audit and Engineering Review
bec w/ enc 1:
NRC Resident. Inspector
E.. Reeves, Project Manager, NRR
Document Control: Desk-
State of Alabama
- l
f
f
!
hp
&
.SAdamovitz b Gloerse
Kahle
[r+ dace
l
9/ S/87
9/ 4-/87
9/_.7/87
9/ /87
<
. _ _ _ _ _ _
_ _ - _ _ - _ _ _ _ _ -