Forwards Safety Evaluation of Util Re Proposed Design for Standby Liquid Control Sys.Design Meets Criteria of 10CFR50.62 Re Atws.Commitment to Periodically Verify Isotopic Enrichment Should Be Included in Tech Specs
ML20238E136
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/08/1987
From: Abelson H
Office of Nuclear Reactor Regulation
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20238E138 List:
References
NUDOCS 8709140167
Download: ML20238E136 (2)


Text

_ -

September 8, 1987 Docket No. 50-333 DISTRIBUTION g^DockettFile d

"'7 OGC NRCPDR ~ C. Vogan Local PDR H. Abelson PDI-1 Rdg. E. Jordan Mr. John C. Brons S. Varga J. Partlow Executive Vice President, Nuclear B. Boger ACRS(10)

Generation J. Johnson,RI' F. Skopec Power Authority of the State of New York 123 Main Street White Plains, New York 10601

Dear Mr. Brons:

SUBJECT:

10 CFR 50.62 REQUIREMENTS FOR STANDBY LIQUID CONTROL SYSTEM (SLCS)

RE: JAMES A. FITZPATRICK NUCLEAR POWER PLANT

)

We have reviewed the information provided in your letter dated April 15, 1987 concerning the proposed design for the subject system. We find that your design meets the applicable requirements of 10 CFR 50.62 (the ATWS' rule) and is, therefore, acceptable. The enclosed SE provides the basis for this conclusion.

Your commitment to periodically verify isotopic enrichment as well as flow rate, as stated in your April 15, 1987 submittal, should be reflected in your Technical Specifications.

Sincerely, Harvey Abelson, Project Manager Project Directorate I-1 Division of Reactor Projects, I/II

Enclosure:

As stated cc: See next page 4e

( PDI-1 PDI-1 CVogan 9"d i ,eson RCapra 9/$/87 9/%/87 9/9/87 8709140167 870908 PDR ADOCK 05000333 P pyg

D, S .

'/.

. Mr. John C. Brons James A. FitzPatrick Fuclear Power Authority of the State of New York Power Plant

'CC' Mr. Gerald C. Goldstein Mr. Jay Dunkleberger Assistant General Counsel Division of Policy Analysis Power Authority of the State and Planning of New York New York State Energy Office 10 Columbus Circle Agency Building 2 New York, New York 10019 Empire State Plaza Albany, New York 12223 Resident Inspector's Office U. S. Nuclear Regulatory Commission Regional Administrator, Region I.

Post Office Box 136 U.S. Nuclear Regulatory Comission Lycoming, New York 13093 631 Park Avenue

' King of Prussia, Pennsylvania 19406 Mr. Radford J. Converse Mr. A. Klausman .

Resident Manager Senior Vice President - Appraisal James A. FitzPatrick Nuclear and Compliance Services Power Plant- Power Authority of the State Post Office Box 41 of New York Lycoming,-New York 13093 10 Columbus Circle New York, New York 10019 Mr. J. A. Gray, Jr. Mr. George Wilverding, Manager Director Nuclear Licensing - BWR Nuclear Safety Evaluation Power: Authority of the State Power Authority of the State of New York. of New York 123 Main Street 123 Main Street White Plains, New York 10601 White Plains, New York 10601 Mr. Robert P. Jones, Supervisor Mr. R. E. Beedle Town of Scriba Vice President Nuclear Support R. D. #4 Power Authority of the State 0swego, New York 13126 of New York 123 Main Street Mr. J. P. Bayne, Presiaent White Plains, New York 10601 Power Authority of the State of New York Mr. S. S. Zulla 10 Columbus Circle Vice President Nuclear Engineering New York, New York 10019 Power Authority of the State of New York Mr. Richard Patch 123 Main Street Quality Assurance Superintendent White Plains, New York 10601 '

James A. FitzPatrick Nuclear i

l. Power Plant Mr. R. Burns Post Office Box 41 Vice President Nuclear Operations Lycoming, New York 13093 Power Authority of the State j of New York a 123 Main Street i White Plains, New York 10601 l

l- k