ML20238E032

From kanterella
Jump to navigation Jump to search

Requests Addl Info in Order to Complete Review of 870120 Application for Amend to Diesel Generator & Electrical Sys Tech Spec,Including Details Re Impact of Taking Credit for Emergency Diesel Generator Tests in One Plant for Another
ML20238E032
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/08/1987
From: Martin R
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
TAC-65143, TAC-65144, NUDOCS 8709140070
Download: ML20238E032 (3)


Text

_

SEP 0 8 387 l

Docket Nos.

50-277/278 I

Mr. Edward G. Bauer, Jr.

Vice President and General Counsel Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

SUBJECT:

DIESEL GENERATOR AND AUXILIARY ELECTRICAL SYSTEMS TECHNICAL SPECIFICATIONS (TAC NO. 65143,65144) f As a result of our review of your application dated January' 20, 1987 for i

3 amendment of the diesel generator and auxiliary electrical systems technical specifications we find that we need the following additional information.

Plere provide details relative to the impact of taking credit for emergency diesel generator tests in the one plant for the other plant.

Specifically, this is with regards to the dedicated diesel generator follower instrumentation and equipment for each plant which controls the opening of circuit breakers to shed loads and the closing of circuit breakers to sequence on loads. Will the time interval for testing this complete loop of dedicated emergency diesel generator instrumentation / equipment for each plant meet the current technical specification requirements?

In the event it is anticipated that more than 45 days will be required to respond to this request, please provide the planned date for submittal of your response.

Sincerely 3

Robert E.

artin, Project Manager Project Directorate I-2 Division of Reactor Projects I/II

. DISTRIBUTION lDocketFilecI NRC PDR/LPDR l

PDI-2 Reading SVarga/BBoger i

DCaphton BHillman WButler M0'Brien RMartin/RClark OGC-Bethesda 4

DHagen ACRS(10)

GPA/PA 0

hl-.2/PM-PDI-2/D WB d.

I pkM6 Min:mr g /$ytler i

l 1 49 /87

/87 l

8709140070 870908 PDR ADDCK 05000277 i

l P

PDR L_ __ ___

p s.tcu, b

o UNITED STATES T8" NUCLEAR REGULATORY COMMISSION l

n E'

WASHINGTON, D. C. 20555 j; p y

%,,,,,+'

$EP 0 81987 l'

Docket Nos.

50-277 i

and 50-278 Mr. Edward G. Bauer, Jr.

'Vice President and General Counsel

's Philadelphia Electric Company 2301 Market' Street

. Philadelphia, Pennsylvania 19101 Gentlemen:

SUBJECT:

DIESEL GENERATOR AND AUXILIARY ELECTRICAL SYSTEMS TECHNICAL SPECIFICATIONS (TAC N0. 65143, 65144)

As a result of our review of your application dated January 20, 1987, for amendment of the diesel generator and auxiliary electrical systems technical specifications we find that we need the following additional information.

Please provide details relative to the. impact of taking credit for emergency diesel generator tests.in the one plant for the other plant. Specifically, this is with regards to the dedicated diesel generator follower instrumentation and equipment for each plant which controls the opening of I

circuit breakers to shed loads and the closing of circuit breakers to sequence on loads. Will the time interval for testing this complete loop of dedicated emergency diesel generator instrumentation / equipment for each plant meet the current technical specification requirements?

In the event it is anticipated that more than 45 days will be required to respond to this request, please' provide the planned date for submittal of your response.

Sincerely f hf 0

'w i b ert E. Martin, Project Manager Project Directorate I-2 Division of Reactor Projects I/II 1

4 I

y q

j' c',

Mr. E. G. Bauer,- Jr.

-Peach Bottom Atomic Power Station,

' t Philadelphia Electric Company Units 2 and 3

.cc:

1 Troy B. Conner, Jr., Esq.

Mr. R. A.-Heiss, Coordinator f

i1747 Pennsylvania Avenue, N.W.

Pennsylvania State Clearinghouse Washington, D.C. 20006.

Governor's Office of State Planning and Development

Philadelphia Electric Company P. O. Box 1323 1

ATTN: Mr. D; M. Smith, Manager Harrisburg, Pennsylvania 17120 1

Peach Bottom Atomic Power Station Route 1,: Box 208 Mr. Thomas M. Gerusky, Director Delta, Pennsylvania 17314 Bureau of Radiation Protection Pennsylvania Department of Mr. J. W., Gallagher, Vice President Environmental Resources Nuclear Operations P.O. Box 2063-Philadelphia Electric Company Harrisburg, Pennsylvania 17120 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Albert R. Steel, Chairman Board of Supervisors Mr. W. M. Alden Peach Bottom Township Engineer-In-Charge-Licensing R. D. #1

Philadelphia Electric Company-Delta, Pennsylvania 17314 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Gary Mnck.

P.O. Box 09181 Morgan J. Morris, III Columbus, Ohio 43209 General Manager - Operating Services Atlantic Electric Mr. Thomas S. Shaw, Jr.

P. O. Box 1500.

Vice President - Production 1199 Black Horse Pike Delmarva Power and Light Company Pleasantville, New Jersey 08232 800 King Street Wilmington, Delaware 19899 Resident Inspector U. S. Nuclear Regulatory Commission Mr. Tom Magette Peach Bottom Atomic Power Station Power Plant Research Program P. O. Box 399 Department of Natural Resources

' Delta, Pennsylvania 17314 B-3 Tawes State Office Building

' Regional Administrator Annapolis, Maryland 21401 U. S. Nuclear Regulatory Commission 631 Park Avenue Mr. Roland Fletcher King of Prussia, Pennsylvania 19406 Department of Environment 201 West Preston Street l

Baltimore, Maryland 21201 l

\\

l i

_ -.