ggggy y
.)
3 g Q A RECORD F
g.,
i 1
i TU ELECTRIC - GENERATING DIVISION NUCLEAR ENGINEERING AND OPERATIONS PROCEDURE NEO 3,05 REPORTING AND CONTROL OF NONCONFORMANCES i64 FOR N OR E110H 0 0 REVISION:
_1 k
ISSUE DAT2:
February 16, 1987 l
EFFECTIVE DATE:
February 20, 1987 CONCURRENCE:
mi.
Direhtor, Quality Assurance
{
APPROVED:
t/72 9 phj{2 870910 c'
, 3,.
D BAUNANs7-4p9 hecutive Vice President.
pg Nuclear Engineering and Operations j
Q A RECORD
l
(.
NUCLEAR ENGINEERING AND OPERATIONS PROCEDURE
~"
NEO 3,.05 REPORTING AND CONTROL OF NONCONFORMANCES 1.0 PURPOSE The purpose of this procedure is to establish the requirements and methods for the initiation, processing, and control of Nonconformance Reports at the Comanche Peak Steam Electric Station (CPSES).
2.0 APPLICABILITY
.1 This procedure is applicable to quality related items or
'59 engineering requirements)ME@)J4;"fbyi)BR9$5Wthe]isc conditions which deviate from drawings, specifications, or other
- Y*EEleEbN A.'eWWOMeNWW be &
2.2 Nonconformances identified by contractors onsite shall be controlled in accordance with this procedure unless ot:herwise specified by the contract.
,+. g 2.3 Affected organizations will assure that affected documents
{"
(i.e. implementing procedures, plans, and policies), if required, are developed / revised and implemented on (but not before) the effective date of this procedure.
3.0 REFERENCES
3.1 NEO 1.03, " Format and Content of Nuclear Engineering and Operations Policy Statements / Procedures" 3.2 NEO CS-1, " Evaluation and Reporting of Items / Events Under 10CFR21 and 10CFR50.55e" 3.3 NEO 3.01, " Corrective Action" 4.0 DEFINITIONS f
Nonconformance L A deficiency in characteristic, documentation, or procedure which renders the quality of an item unacceptable.or indeterminate.
4.2 Item - Any level of unit assembly, including structure, system, subsystem, subassembly, component, part, or material.
NEO 3.05 Rev.:
1 Date:
02/16/87 Page 1 of 13
i 4
c._
4.3 Rework - The process by which a nonconforming item is made to
(
conform to prior specified requirements by corrective means.
4.4 Repair - The process of restoring a nonconforming characteristic to a condition such that the capability of an item to function reliably and safely is unimpaired, even though the item still does not conform to the original requirements.
This disposition requires a technical justification by the Engineering Department of the item's acceptability for use.
4.5 Scrap - The determination that an item is not acceptable for its intended use in a safety-related application and must be segregated or disposed of to preclude such use.
4.6 Use-As-Is - A disposition which may be assigned for a nonconformance when it can be established that the discrepancy shall result in no conditions adverse to safety and that the item will continue to meet all engineering functional requirements.
This disposition requires a technical justification by the Engineering Department of the item's acceptability for use.
4.7 Nonconformance Report (NCR) (Figure 7.2) - A document which identifies and describes a nonconformance and requests a disposition of a nonconforming condition.
4.8 Disposition - An action taken to resolve or correct a f
nonconformance.
fs: e 4.9 Quality Related - Any system. component, structure or activity identified as having Quality Assurance requirements.
5.0 RESPONSIBILITIES 51 Engineering Engineering is responsible; for:
5.1.1 Initiating or requesting NCR's for nonconformances identified by Engineering.
5.1.2 Assigning and approving dispositions to Nonconformance Reports, as required.
5.1.3 Reviewing NCR's for deportability as set forth in this procedure.
I I
f NEO 3.05 Rev.:
I Date:
02/16/87 Page 2 of 13 l
v H;. ' t.
5.2 Construction f:
Construction is responsible for:
Ss2.1 Initiating or requesting NCR's for nonconformances identified by Construction.
5.2.2 Assuring the implementation of disposition action instructions on Construction NCR's.
Verifying the disposition action completion on all 5.2.3 t.
Construction NCR's.
5.2.4 Reviewing all Construction, "C", designated NCR's and '
providing a reworh'or scrap disposition which Construction desires to rework or scrap.
5.3 operations Plant Operations is responsible'for:
5.3.1 Initiating or requesting NCR's for nonconformances identified by Plant Operations.
5.3.2 Assuring the implementation of disposition action 27
' instructions on Plant Operations NCR's.
' LL 5.3.3 verifying the disposition action completion on all Plant Operations NCR's.
5.3.4 Reviewing all Plant Operations, "P", designated NCR's and providing a rework or scrap disposition which Operations desires to rework or scrap.
5.4 Startup Startup is responsible for:
5.4.1 Initiating or requesting NCR's for nonconformances identified by Startup.
5.4.2 Assuring the implementation of disposition action instructions on Startup NCR's.
5.4.3 Verifying the disposition action completion on all Startup NCR's.
NEO 3.05 Rev.:
1 Date: 02/16/87 Page 3 of 13
E i
l 1
l.
l 5.5 Quality' Assurance-Quality Assurance is responsible for:
5.5.1 Initiating NCR's for nonconformances identified by QA or j
when requested by others.
1 5.5.2 Ensuring the processing of all NCR's frem initiation through closure.
5.5.3 Reviewing dispositions of nonconformances for concurrence.
5.5.4 Assuring that necessary controls are implemented to
,g prevent the uncontrolled use of nonconforming items, as required.
j
/
/
5.5.5 Performing inspection / verification in the closing of all
/
NCR's.
5.5.6 Ensuring the Deportability Review has been accomplished.
5.5.7 Transmitting copies of NCR's that have an affected document listed in block 16 to the Design Change Tracking Group.
6.0 INSTRUCTIONS l
6.1 A Nonconformance Report (NCR) may be initiated by Quality Assurance : Engineering. Construction, Startup, or Plant Operations personnel. The Instructions for Completing NCR's (Figure 7.1) provide specific directions for completing NCR's.
NOTE Nonconformance RepoNs shall be prepared on items when a " repair" or use as is"
-M
,p disposition is required. Items desired to
/
be reworked or scrapped will be controlled d$
under existing organizations implementing procedures.
However, Nonconformance Reports may be used to disposition rework or scrap in lieu of an implementing program.
6.2 NCR's shall address specific nonconformances only. They shall not be extended to include similar products or activities.
6.3 Nonconforming items for which an NCR is written may be installed and/or operated only as authorized by the Conditional Release program (NEO 3.02).
NEO 3.05 Rev.:
1 Date:
02/16/87 Page 4 of 13
. JV;)Wetet'mineFif YhW'T(qtiiredV%ork documents or NCR's shall-6.l Upon discovery of a nonconforming condition it should-be-l c
i p
be prepared to correct the nonconformance by rework or o'JO'/((p - Nonconformance Report shall always be originated.
The individual replacement.
If the item cannot be reworked or replaced a l
Q originating the NCR shall complete blocks 1 through 11 of the NCR j
I f
as detailed in Figure 7.1, and forward the NCR to Construction Quality Control or Plant Operations Quality Assurance.
b 6.4.1 The Manager, Quality Control shall receive the following NCR's:
1 6.4.1.1 NCR's on items not turned over in accordance with l
STA-802, " Final Acceptance of Station Systems and
{
Equipment".
j 6.4.1.2 NCR's that have been identified in the Comanche Peak Response Team (CPRT) effort.
6.4.1.3 NCR's on items that are being worked in accordance with STA-806, " Construction Work Request and Work Orders".
6.4.2 The Manager, Operations QA shall receive all other NCR's not encompassed by Section 6.4.1 above.
6.4.3 Should additional space be required for identifying the nonconformance, Figure 7.3 of this procedure shall be used.
6.5 Quality Assurance / Quality Control Evaluation 6.5.1 The Manager, Quality Control or Manager, Operations QA (for construction and plant operations NCR's respectively) or his designee shall be responsible for reviewing the NCR, as follows, and completing blocks 12 through 14 of the NCR as detailed in Figure 7.1.
6.5.1.1 tetermine if the NCR is valid, complete, and sufficiently detailed so the problem can be clearly understood and located.
.5.1.1horinvalidNCR'stheapprcprfate iGhager shall provide a written justification statement for not issuing the NCR. A copy of the proposed NCR and justification shall be returned to the initiator and the original retained as a permanent record.
NEO 3.05 Rev.:
1 Date: 02/16/87 Page 5 of 13
l l
1 6.5.1.2 Determine if a Corrective Action Request is
{
i warranted and, if so, initiate a CAR in accordance with procedure NEO 3.01, " Corrective Action."
6.5.1.3. Sign and date the " Approved By QA/QC/s/Date" block (block 12) of the NCR.
6.5.1.4 Quality Assurance / Quality Control shall enter the date and a description of the nonconformance in the NCR Status Log.
NCR numbers shall be assigned in ascending numerical order preceded by-the year the NCR is approved,' discipline code, and assignment identifier.
Assignment Identifier Discipline Codes C - Construction I - Instrumentation P - Plant Operations E - Electrical C - Civil i
H - Mechanical Example:
NCR-Z;-8j-
- [
j Instrumentation
- ~
Plant Operations NOTE For those NCR's generated in response to CPRT items, an "X" designator shall follow the NCR number (i.e., NCR-CI-86-00001-X).
6.5.1.4.1 After the NCR is numbered it is considered issued. A copy of the NCf should be retained on file by Quality Assurance / Quality Control until the NCR is closed.
1 6.5.1.5 QA/QC personnel shall assure that the nonconforming item is controlled to prevent inadvertent use.
6.5.1.6 Forward a copy of the NCR to the Startup Manager if the item / equipment is in Startup custody.
NEO 3.05 Rev.:
1 Date: 02/16/87
)
Page 6 of 13
. i;,7 f.
- 6. 5.1. 7 Forward a copy of the NCR to the Shift Supervisor
{'
if the NCR affects plant equipment in-Operations custody.
~
i 6.5.1.8 Forward "C" designator NCR's to the Construction Representative.
6.5.1.9 Forward "P" designator NCR's to the Plant Operations Representative.
6.5.1.10 After Construction / Operations review forward those NCR's that require Engineering disposition to the Director, of Engineering, or designee, for disposition.
6.6 Construction / Operations Dispositions 6.6.1 The Construction Representative or Plant Operations Representative shall provide rework or scrap dispositions, if applicable, in block 15.
He shall sign and date block 19 and N/A blocks 20, 21, and 22 and forward the NCR to QA/QC for review in accordance with paragraph 6.8 of this procedure.
6.6.2 Nonconformances that require a repair or use-es-is disposition shall be returned to QA/QC (see paragraph
(
6.5.1.10) noted " Forward to Engineering" in block 15 and initialed / dated by the Construction / Plant Operations.
Representative, as applicable.
6.7 Engineering Review and Evaluation 6.7.1 Upon receipt of the NCR the Director of Engineering, or his designee, shall forward the NCR to the appropriate l
discipline engineer (i.e. Mechanical. Electrical, er.c.).
Engineering shall complete blocks 15 through 22 of the NCR us detailed in Figure 7.1.
6.7.2 The Engineer shall indicate the type of disposition (i.e.,
Scrap, Rework, Repair, or Use-As-Is) by checking the appropriate bloc'k and shall describe the disposition actions which must be taken (use attachments if necesaary). The actions taken will normally be dictated by the specific situation and type of disposition i
required. The Engineer shall list the affecte/ document number (s) Type and Status Code, indicate if a NRC license document change is required, and determine if the nonconformance is potentially reportable as defined in NEO CS-1, " Evaluation of and Reporting of Items / Events Under 10CFR21 and 10CFR50.55(e)," and sign /date block 19 of the j
NCR. In addition, the engineer shall specify any j
additional quality assurance requirements necessary to l
'l NEO 3.05 Rev.:
1 Date:
02/16/87 Page 7 of 13
p l
l accomplish the disposition.- Should additional space be
[' '
required for the disposition, Figure 7.3 shall be used.
\\
A technical justification shall be documented for all NCR's which are dispositioned use-as-is or repair.
For rework or scrap dispositions, the Engineer shall mark N/A in Blocks 20 and 21 and forward the NCR to the Director of Engineering (Paragraph 6.7.6).
6.7.3 When additional investigations (e.g., inspection, test) are needed to develop a satisfactory disposition, engineering may request such investigations.
Investigation results shall become a part of the NCR and attached thereto.
6.7.4 An Independent Engineering review shall be accomplished 1
consistent with the guidelines of Reg. Guide 1.64, 4
" Quality Assurance Requirements for the Design of Nuclear l
Power Plants," when the disposition is use-as-is or repair.
Individuals performing this review shall not have 1: mediate supervisory responsibility for the Individual preparing the disposition, have specified a singular design approach, have ruled out certain design considerations or established the design inputs for the-particular design aspect being verified.
Block 20 of the NCR shall then be signed by the Independent Engineering Reviewer.
6.7.5 The Discipline Engineer shall review the disposition for approval and sign /date block 21 of the NCR.
6.7.6 The Director of Engineering shall review the disposition and sign /date block 22.
6.7.6.1 For "use-as-is disposition" the Director of Engineering shall denote N/A, initial and date block 25 of the NCR.
6.8 Quality Assurance / Quality Control Review 6.8.1 NCR's with final dispositions shall be forwarded to the Manager, Quality control or Manager, Operations QA, as appropriate, for QA review of the disposition.
This review shall verify the following:
g 6.8.1.1 thatthedispositionis(a complete, and in compliance with applicable codes and addresses condition details, cg6.8.1.2 that technical justification is provided for all
" Repair" and "Use-As-Is" dispositions.
)
l NEO 3.05 Rev.:
1 Date:
02/16/87 Page 8 of 13 I
j.T.,
6.8.1.3 that.all documentation' attached is adequate and complete.
6.8.1.4 that the qtiality assurance requirements contained in the disposition details are correct and that the reinspection of the item can be performed satisfactorily 6.8.1.5 that t.he ANI review is required.
6.8.2 The Manager, Quality Control or Manager, Operations QA, as appropriate, shall sign and date block 23.
6.8.2.1 For ASME NCR's dispositioned use-as-is ANI concurrence shs11 be accomplished.
6.8.2.2 The appropriate Manager shall denote N/A, initial, and date block 26 and sign block 27 of the NCF. for "Use-As-Is" dispositions then proceed to step 6.12 of this procedure.
6.8.3 The Manager, Quality Control or Manager, Operations QA shall forward copies of NCR's that have an affected document listed in block 16 to the Design Change Tracking Group.
g.
(
6.9 ANI Review l
J 6.9.1 The Authorized Nuclear Inspector (ANI) shall review for
)
code compliance all Constructions NCR's on ASME items
.dispositioned "Use-As-Is", " Repair" or " Rework" by welding and shall sign and date block 24.
N/A shall be placed in this block if ANI review is not required.
i 6.10 Disposition Accomplishment 6.10.1 Upon completion of the reviews described above, an NCR dispositioned as rework, repair, or scrap shall be forwarded to the responsible organization for the Eeneration of work documents and/or implementation of the disposition.
6.10.2 To indicate completion of the final disposition on Construction NCR's, the " Disposition Action Complete /Date" block 25, shall be signed and dated by the Director of Construction. For Plant Operations NCR's this block shall be signed by Manager, Plant Operations. Copies of any documentation generated as a result of the NCR shall be attached or referenced.
NEO 3.05 Rev.:
1 Date:
02/16/87 Page 9 of
- .3
i l
6.10.3 The NCR and attached documentation shall be presented to l
the QA/QC section for verification of the final disposition.
6.11 Verification /Close_ Gut 6.11.1 Quality Assurance / Quality Control is responsible for verifying satisfactory implementation of the final disposition. Upon satisfactory completion of the dispositioned action, the verifier, as applicable, shall perform the required inspection / verification and complete blocks 26 and 27.
6.11.1.1 If the rework / repair is unacceptable, the reperformance of work within the scope of the NCR disposition is' acceptable provided that b.oth the original work performed has not altered, and the reperformance will not alter the item such that the " Conditions / Details" of the NCR,are no longer accurate. This determination shall be made by the Manager, Quality Control or Manager, Operations QA, as appropriate. When weld repair is unacceptable, no reperformance of work shall be attempted unless allowed by the NCR disposition, or approved by a new NCR and/or revision.
If additional unsatisfactory
.I conditions beyond the scope of the original NCR are identified during inspection / verification they shall be addressed in accordance with governing programs.
NOTE It2 the case of additional repairs, a new or revised NCR shall be initiated and a new disposition obtained from Engineering prior to performing any additional repairs.
6.11.2 QA/QC shall ensure that all documentation generated as a result of the NCR is attached, when practical, or referenced in block 28 if not attached.
6.11,3 QA/QC shall remove the NCR Tags if attached.
NEO 3.05 Rev.:
1 Date:
02/16/87 Page 10 of 13
1 (Ufi.:.
6.11.4 QA/QC ahall enter the Inspection Document Number us'ed during the inspection of the disposition, if applicable, in block 26 of the NCR.
6.11.5 QA/QC shall sign /date the "QC Inspection Complete /Date,"
block 27 of the NCR to indicate the above verification steps are accomplished.
6.11.6 When the NCR Tags are removed and Block 27 is signed, the nonconforming condition is considered corrected and the item (s) may be placed in use.
/
(.1'2 Post Review
/
6.12.1 The Manager, Quality Control or Manager, Operations QA, as applicable, is responsible for the review of the NCR to determine if the NCR and attached documentation is acceptable and complete.. The appropriate Manager or their designee shall indicate the review by signing and dating the " Post Review /Date," block 29 of the latest revision of the NCR.
6.12.1.1 After the NCR has been reviewed, QA/QC shall log the date the NCR was completed in the NCR Status Log.
{1 A '
6.12.1.2 QA/QC shall forward the completed NCR and all associated documentation to the appropriate document storage location.
6.13 Revisions and Changes to NCR's 6.13.1 Change (s) may be made to the assigned disposition up to the point that the NCR is signed by QA/QC for approval in block 23.
The changes shall be made to the NCR by lining out the affected sections and then signing and dating the changes.
Prior signatories must review the i
change (s) and they shall indicate their approval by initialing and dating adjacent to the affected sections.
NOTE This type of change is not considered a revision.
j 6.13.2 When it is necessary to alter an NCR in any manner af ter QA/QC approval in block 23, a revision or a new NCR shall be issued as follows:
NEO 3.05 Rev.:
1 Date: 02/16/87 Page 11 of 13 1
6.13.2.1 When an NCR requires revision, the new document shall be identified with the letter j
"R" immediately following the NCR number, with 1
a sequential number indicating the level of the revision. The nonconforming condition will be restated. : The reason for revision and the individual making the revision should be stated. The original shall be marked
" Superseded"-by the Manager, Quality Control
]
b or Manager, Operations QA, as appropriate and j
initial and date. The NCR Status Log shall bc
{
brought up to date and the original NCR shall
{
be retained as a permanent record in the j
appropriate storage location.
J 6.13.2.2 When a new NCR is written it shall reference the previous NCR in the Remarks / Comments block. The original NCR shall be closed by referencing the new NCR in the Remarks / Comments block and noting the reason for issuing a new NCR. The Manager, Quality Control or Manager, Operations QA ahall sign /date block 29 for closure of the original NCR.
6.14 Conditional Release 6.14.1 A Conditional Release may be granted for nonconforming ites:s that are desired for installation, use or storage in place on an economic risk basis. This shall be accomplished in accordance with NEO 3.02.
6.15 NCR Status Log 6.15.1 NCR Status Logs shall be maintained by QA/QC and shall contain as a minimum:
6.15.1.1 NCR number / revision 6.15.1.2 Issue date 6.15.1.3 Disposition date (date QA/QC approval) 6.15.1.4 Closure date 6.15.1.5 Comments (associated new NCR numbers, etc.)
NEO 3.05 Rev.:
1 Date:
02/16/87 Page 12 of 13
e l.
.n.
, C:iG
'7.0 FIGURES.
l (;
Figure No.
Figure Title-
- 7.1 Instructions.For Completing NCR's 7.2 Nonconformance Report 7.3 NCR Continuation Sheet 8.0 ATTACHMENT _S 8.A - Major Changes from Previous Revision 9.0 QA RECORDS When completed, forms, reports or other documents generated in-response to this procedure will be treated as QA Records.
5 5 %.
(
I i
i NEO 3,05 Rev.:
1 I
Date: 02/16/87 Page 13 of 13 l
FIGURE 7.1 INSTRUCTIONS FOR COMPLETING NCR's All blocks shall be filled in.
Enter N/A, initial and date, when no other entry is* appropriate.
l BLOCK ENTRY RESPONSIBLE NUMEER INSTRUCTION INDIVIDUAL 1.
Enter the component name. Component name should be taken INITIATOR from the drawing, specification, equipment list, etc.
2.
Enter the component identification number. This number INITIATOR should be the unique identification number of the component taken from the drawing, specification, equipment list, etc.
3.
Enter the subcomponent identification number when INITIATOR applicable.
4.
Enter the system / subsystem number when applicable.
INITIATOR 5.
Enter the work document number.
INITIATOR 1
6.
Enter the full identifying number of the document (s)
INITIATOR l
violated, (including revision and/or addendum), followed f<w l
by the appropriate type code.
7.
Enter the affected Unit Number (1-Unit 1, 2-Unit 2 INITIATOR X-Common) if applicable.
I 8.
Enter the physical location of the nonconformance by INITIATOR building, elevation and room number.
9.
Enter the related Inspection Report number when the INITIATOR NCR is written as a result of an unsatisfactory IR.
10.
Enter the specific condition and extent of the INITIATOR nonconformance in a detailed, but concise, manner.
Attach any supplementary information to the NCR.
Also provide quantitative data such as dimensions, temperatures, or pressures.
l 11.
Enter name, badge number, and date of initiation.
INITIATOR j
NEO 3.05 Rev:
1 Date: 02/16/87 Page 7.1-1 of 4 w-__-____-_-
FIGURE 7.1 BLOCK ENTRY RESPONSIBLE NUMBER INSTRUCTION INDIVIDUAL 12,13,14 Review information in blocks 1-11 for completeness QA and accuracy, assign sequential NCR number and SEE NOTES determine if copy of NCR is to be sent to Shift 1
2 Supervisor or Startup Manager and date approval.
Forvard a copy of the NCR to the Shif t Supervisor if the NCR affects plant equipment in Operations custody.
Forvard a copy of the NCR to the Startup Manager if the NCR is in Startup custody.
Determine if NCR Tags are necessary and check appropriate block.
Enter the number of NCR Tags applied.
15.
Enter the disposition and specific action needed to ENG./CONST./
correct the nonconformance. Attachments may be used.
PLANT OPS.
SEE NOTE 8 16.
Enter the document (s) affected followed by the ENGINEERING
' appropriate type and status code.
17.
Enter yes or no for potentially reportable under the ENGINEERING guidelines of NEO CS-1, as required.
p...
(
18.
Enter yes or no for Licensing Document Change required.
ENGINEERING 19.
Sign and date.
ENG./CONST./
PLANT OPS.
SEE NOTE 9 20.
Sign for concurrence and date.
ENGINEERING SEE NOTE 3 21.
Sign for approval and date.
DISCIPLINE LEAD ENGINEER 22.
Sign for approval and date.
DIREC. OF ENG.
SEE NOTE 4 23.
Sign for review and approval and date.
QA, SEE NOTE 6 24 Sign and date, when required.
ANI, SEE NOTE 7 25.
Sign and date after disposition action is completed.
SEE NOTE 5 26.
Enter Inspection Document number (i.e., IRf) used QC INSPECTOR during the inspection of the disposition, if applicable.
NEO 3.05 Rev:
1 Date: 02/16/87 Page 7.1-2 of 4
~
FIGURE 7.1 BLOCK ENTRY RESPONSIBLE NUMBER INSTRUCTION INDIVIDUAL 27.
Sign and date for verification of disposition and QC INSPECTOR inspection accomplished.
28.
Enter supplemental information, as applicable.
AS APPLICABLE
'29.
Sign and date when the nonconformance is closed.
QA, SEE NOTE 1 j
This signature shall signify review of the NCR and supporting documentation.
NOTES:
1.
To be signed by the Manager, Operations QA (or designated representative) for plant operations activities or by the Manager, Quality Control (or designated representative) for construction activities.
2.
NCR's will be assigned an accending numerical number preceded by the year the NCR is approved, discipline code, and assignment identifier.
ASSIGNMENT IDENTIFIER DISCIPLINE CODES C - Construction I - Instrumentation f
P - Plant Operations E - Electrical C - Civil M - Mechanical Example NCR-PI-86-00001
~~
L- #1 NCR issued in 1986
.NCR issued in 1986 Instrumentation Plant Operations 3.
Independent review in accordance with the guidelines of Reg. Guide 1.64 (Note: Not required for rework or reject disposition) 4.
Director of Engineering or designated representative.
5.
Director of Construction for construction NCR's.
Manager, Plant Operations for Plant Operations NCR's.
6.
To be reviewed for adequacy and conformance to applicable QA requirements.
(
NEO 3.05 Rev:
1 Date: 02/16/87 Page 7.1-3 of 4
FIGURE 7.1"'
'~
NOTES:
(Continued) 7.
ANI review required for Construction, ASME related activities where use-as-is, rework or repair by welding dis positions are chosen.
8.
Engineering shall disposition all NCR's when a repair or use-as-is ed7' disposition is needed. The Construction Represeritative may dispor1 tion "C" designated NCR's when'the nonconforming condition can be reworked or' scrapped. The Plant Operations Representative may disposition "P" designated NCR's when the nonconfornfug condition can be reworked or scrapped.
9.
Engineering shall sign and date all designated NCR's when' Engineering has provided the disposition.
If Engineering has dispositioned the NCR as scrap or rework the NCR shall be forwarded :co, the Director of Engineering and mark block 20 and 21 N/A.
The Constr0ction Representative or Plant Operations Representative, as applicable, shall sign and date this block when they have provided a rework or scrop' disposition and N/A block 20, 21 and 22.
i
, c.:
.1 l
l
)
l NEO 3.05 Rev:
1 Date: 02/16/87 Page 7.1-4 of 4
I FIGURE 7.2 l
NONCONFORMANCE REPORI y
NCR-I COMPONENT % COMPONENTIDNUMBEQ SUBCOMPONENT ID EMBEQSYSTEM /SUBSYSTDi NUMBQ WORK DOCUMENI NUMBQ l
DOCUMENIS/ CODES VI TYPE D - DRAWING hUNIT NUMBER lh IDCATION/ ELEVATION ROOM NUMBEW IR NUMBQ l
S - SPEC.
P - PROC.
l I
C4PY20: O NONE C - CODE l
LJ SHIFT SUPERVISOR CONDITIONS / DETAILS:.g O STARTUP MANAGER h INITIATOR h DATE APPROVED BY QA/QC @
DATE NCR TACS APPLIED NO. OF TACS O YES O NO DISPOSITION DETAILS:
O REVORK OSCRAP O REPAIR OUSE-AS-IS Iw
^
AFFECTED DOCUMENT NUMBERS TYPE STATUS TYPE CODES - !SME AS ABOVE LICENSING DOCUMENT CHANCE STATUS CODES /C-WILL BE, N-WILL NOT BEQ GOYtS O NO DISPOSITION SUBMITIED BY DATE @ INDEPENDENT ENG. REVIEWDATE@
DISCIPLINE ENC. APPROVAL DATE 1
DIRECTOR OF ENGINEERING DATE@
QA/QC APPROVAL OF DISPOSITION DATE@
ANI REVIEW DATEh DISPOSITION ACTION COMPI2TE DATE@
QA/QC VERIFICATION DATE@
INSPECTION DOCUMENT NUMBER REMARKS / COP 9 TENTS:
REPORIABLE UNDER CS-1 (13)O YES O NO Init1.ito.ce e'If the item is under Operations control, is installed, and work documents POST REVIEW @
DATE are NOT inprocess, Shif t Supervisor notification is recuired.
_(
Ravs 1
{
Date 02/16/87 j
NEO 3.05 Page 7.21 of I
FICGI 7.3 '
.a
'NCR CONTINUATION SHEET
. e ~.
--!r.. ?.
.'(.
ren Page of~
CONDITION / DETAILS:
l
?%
- _ (, ;
DISPOSITION DETAILS:
4 Rev:
1 Date: 02/16/87 NEO 3.05 Page 7.3-1 of 1
L. '...
I ATTACHMENT 8.A l
MAJOR CHANGES FROM PREVIOUS REVISION CHANGE SECTION REVISION NO.
NOS.
COMMENT RESPONSIBILITY 1
6.4.1-6.4.3 Sections.added to Director, QA clarify NCR recipient 2
6.5.1.4 (NOTE)
Note added to Director, QA distinguish NCRs generated in response to CPRT items a#
l
- (
NEO 3.05 Rev.:
1 Date: 02/16/87 Page 8.A-1 of 1
( wvv L4] Ur]
nl a
l PROCEDURE NO.
CPSES h l' STA-606 STATION-ADMINISTRATION MANUAL VORK REQUESTS AND -WORK ORDERS REVISION NO. 7 PAGE 3 OP 22 4.1.2 Certain problems, as determined by the Shift Supervisor, will require immediate corrective action. The Shift Supervisor may authorize work to start without an approved Work Order; however, the Responsible Organization is responsible for ensuring that a Work Order package is processed as soon as possible, that the applicable inspection groups are notified prior to starting work, that all work performed is documented, and that the intent of this procedure is met.
4.1.3 Work Requests (WR) may be generated by anyone working at CPSES. WRs shall'be initiated either on the VR form or by 8
direct entry into the MMCP. A Work Order number will be assigned upon entry of the WR into the KMCP.
NOTE:
The preprinted number on the WR form or the WO number generated by the MMCP can be used to track the request.
4.1.4 The originator should hang the VR tag (card stock copy of i
the VR) on the item whenever possible.
NOTE:
Eanging the WR tag on the item aids in locating the itee for problem verification and maintenance. WR tags should not be hung on control boards or whenever it would interfere with component operation or increase personnel exposure.
4.1.5 The originator shall f orward the WR form to the Shif t Supervisor.
4.2 VR Screening 4.2.1 The Shift Supervisor shall be responsible for reviewing the Work Request. f or potential deportability in accordance j
with SIA-503, " Incident Reporting". In addition, the
~
Shif t Supervisor is responsible f or reviewing the WR to
(
determine if the item addressed on the VR is needed for continued use. If the item addressed on the WR is needed
)
for continued use and a Nonconf ormance Renort is recuired
. per STA-405. " Control of Noncenf ormine Materials". a s
Conditional Release Request shall be initiated in accordance with NEO 3.02, "Conditionni Releases."
NOTE:
Electronically initiated WRs are automatically available at an MMCP terminal for this review.
e
@54 4
m
__:._____.__-_.m_
\\
U~ G' U uu ' W U ' UL'= U U
y '_
gygg g
_E85-201646s R.h l
- p,g. [, cExt3ArDC Co.
- upoor 4 I.
h'-
- ' ace' F
ct I
~
ggg
- muc:g,synxu I:ruccMroptn
- x,;3 men J :.ccA::cs :n cLr/A;;:s 3:n w.
Saf [8,EL-810Byding CP2-EPSWEA-01 Ru CP2-N-02 2
Safeguart3/02CB 2EAl/2EA2 Rn 103,EL-852' N/A sana:mrone.no commes
)
J
'Ihe floor and walls of the following Switchgear Cubicles ere tot
, perpendicular causing an interference problen between the breaker side and the cubicle wall.'1his interference mkes it difficult to rack the breakers into the I
mrrect position.
2EAl CUB 5,17 2EA2 CUB 1,2,4,5,6,8,14,15 g
One hold tag applied to each cubicle All unrelated w rk may continue.
j
~ ; c.
- EE parEREncE DocunorE ES-100 uv 2
FARA 6.2.1 3
REPOR ED BY DAII:
^
Jeff.e;v D.Skelton 11/27 /Rci REVIEW /AFFROVAL:
DAII:
S rebn2+ Mm 19/03 05 g
AcnoN ADDRESSEE coNSTRUcrt0N MANAcDeer O et'AttrycourRet.D EscIxtrR2nch RIPCRIABII UNDER 10CFR 50.55(e):
- ma r s 2 t.
RIVIEVED SY: [ [ [ { [
h7 /((/h 5
YES NO IF YES, REFEREM'E 5DAR
- r um uw -
u.u] S U /A//f//fe
- cid '8 8 #
DISPOSIUCNr 19tf* O &
AIR USE A$ IS SCRAP Tenterary waiver ic=d to allow Startup testing to continue.?' i.tdm dir4 tion t^ M iT mtcd. Rework Switchgear 2EAl and 2EA2 cubicles 6 and 17,and cubicles 8 i
and 15 respectively by adjusting the chimney support brackets by rs: oval of h" fran t.he right hand support brackets (verdor's rectr:mendation per report #HU-01517-T)
~
g Ebr Switchgear 2EA2 rework cubicles 1 through 8 by ratoving than fran their E
fourdation ard adjusting than so as to accmplish rcM.r'terference between breaker 4
sides and cubicle valls.
% The above work siculd be accomplished with the issuance of appropriate trave s
d and concurrarce of the vendor representative as necessary.
gjfj J fy.f j.gg g
ACTION ADCPISSEE REVIEV/AFFROVAL:
A QE REVIEW /AFFROVALs DATE:
M LG>
lh/YI W l
DIsFostnen VryFIcAncs 6 c:. cst;ur
/
Dart:
A/0MciA 7Hmc 7%d,,J/= OOf-D-M67 /YAse__
/'S7/)
cms:
G ys, y,, yW.,,,,),, 4 Fev.6-issued for the purpose of redispositioning.
(wuuvnou"yq f
s w 3r$y 2.
f.
Eh.
'f/((9 t)a.hb n Bovehl
~ (bl3fDivision
'N
[I k
ese Brown severl.ine.
I District cir.ce 1
- I Me#tf0w Psfir CerittalIV. Sulle 70
[C.
, I.
10300 N.Centrat hpessway 4
Dallas. TX 75731 rl** Wl4)987 0t$1
. ptember 5,1906 6
3;.r..
Vy y;.
/
ig i3 I,'v e 4)[
Taxas' Utilities Generating Company Box 1002.............;...,...h,
.P.O..,f*y-f.5--
Glljf f
R.
w.
\\i ntio6:9,'Mr. Peter Stevens g
..f0 l
M25):/
ct:".6900V Metal-clad Switchgear 2-
' &.?..
TUGC0 P.O. CP-0425
- ( f' -
BBC S.O. 33-S1261 s
Gentlemen:
Thank you'for giving us the opportunity of meeting with you last week.
Enclosed is s copy of the report prepared by Mr. John Detwiler as a result of our inspection of the equipment.
This report summarizes the recommendations of our Switchgear Quality
.tssurance Group, Ser'vice and Sales Divisions.
(. wou'Id be pleased to discuss this subject further at yo$r convenience.
Iery truly yours, 3BC BROWN BOV R1, IN
' d Keasier, P.E.
)istrict Manager
.5K/rg t
Susp%.eg4 m m phto @
g n.mn, s.,
a em sua e yo
,ae as ma a me a em am ea e ap so a
s
&&W hrlicM5 To g.,_
L, nr,F 9/r/f4
?W W
i-i.
., g..
?
- ]tESULTS OF TRE COMANC*rIE PEAK SKV SWITCHGEAR
,c V
- i..
'f,t., '
N171 P W
- 7.,;,\\.,;#
\\ _ RAIN A 5 TRAIN B i
v;,m;;
1.
This switchgear was installed on embeaments which were not level wi or with the room floor line. This necessitated the use of shim er embedments and the switchgear in order to properly fasten the switchge y
,cmbedmenta. In some cases, gaps between the switchgear frames can b here washers were used as spacers between the frames due to gaps. W E
' general appearance of the switchges: Installation is poor the'e ui e
' o the floor has sufficient selsmie lategrity.
q pniselit'faiiten' tng f,
- i. It abould be noted, however, that in many cases th
[
Unsupported by the concrete floor, which is a critical shortcoming e metal switchgear floors are (JX]! installation. Because the breakers weigh approximately a half j
l of the
(*2?g. This is serious, not only from a seismic view, b
- ' " '"d the metal floors drop because of the breaker weight, the dimen i r s.
. If it,between the high voltage connections of the breaker tulip and the buss onal r se
.F inch, the breaker tully willhave inadequate contact with stabs will be 7, :"
j cause the contact to overheat. Should a fault current be iciposed on the brea
. This will the system may are due to burning of the contact, preducing ionized ga will act like a trampoline causing the breaker to rock s whichrs "
compartment, perhaps destroying the switchgear, at a time when it must rema e
operational. There are also auxillary switch malfunctions that o floors.
ccur with nen-level The deficiencies of the installation are so serious that it is required to fix th problem instead 6f the symptoms. The correction of the floor and the assoc cquipment distortion is the key to relieving the problems which exist in the switchgear.
T' o accomplish this aim, the floors of th6'suittligE5r~must b'~e brou ospecially at the wheellocation in the connected po c
nto to use jachserews to relevel the equipment floors where necess ry n
below it. It would be necessary to do this at every cub and then to a
e concrete the switchgear floor and the concrete belo6r exceeds 3/32 inch aft e vold between l
brought up to the required diciension to the bus stabs.
er the floor is
__ _ _ _ _ _ _ - _ - - - - - - - - - - ~
enc e eo e ut.
b turt z e
3
~-
_T R A I N A.
[This switchgear appears to be in a much better condition than th
.However, a dets.iled survey of this train should be conducted to see iI cubicles require the treatment prescribed for Unit i switchgear.
7/TRMN B l
.,.. t ie n.. :st portions of this switchgear show si r
.. straightening after shipment sad unloading.gns of having been installed without l
??
w$.C.the corners were not 90 degree angles.tswitchgear show that ents in a condition where
f.fW, To correct this problem, most of the frames should be cut loose straig then rewelded to the embedmente. Of course, the condition of th e,and L
below it should also be examined a.nd fixed as in Unit 1.
e floor and volds
{
s G
ggy
,_.m 3e c.
s 2
puvu erim 73 3 Brs.wn.Boverl BBC T/3
~
s:c-som.
(.
Switchgear Producta Group
' Bac Brown Beveri,inc.
.V Li' 437s County Une Aosd Chalfont.PA 149td Phone:(215)822 4270 Telecoogr:(2181022 4271 January 14,1987 y
Stone k Webster Engineering Corporation c/o Texas Utilities Generating Company Comanche Peak N.G.S.
Atta S. Hileman
. Hat Tony Howard, BBC y
Gentlemen
- a
'4 years during which I have been following it, is a classic
. a defect only to find that another patch is required to correct additional problems, infinitum".
It now appears that it is time to ' bite the bullet" and correct the original defectiin this
-(,
case, correct the floor whleh caused the problema la the first place. The Unit One installation is so bad that t have serious doubts if it is correctable short of follow recommendation given above. It may be possible to correct the Unit Two defects b installation perfection will be subject to critique by the Regulat This is only a recommendation which others will have to approve or disapprove.
BBC 3rown Boveri, Systems Engineering is able to provide techsteal services an however, be charges for these services.for the correction of the floor defect Sincere i
C
. W., Detwiler, Sr.'
Senior Systems Engineer JWD/jm cci P. Allen, D/F Sve.
I. Reaster D/F 3 ales i
s C. Kunkel, Systems Eng.
E. Rhoads, Q.A.
C 6
, agree
1 WJwm(j w/
i u
! Idh k iiNMNEMdt!IsJF'e 'fbNND$ist M VML MN4 Ah2fbHVdfMfit J
/
I 3
j NE-4755 1
TEXAS UTILITIES GENERATING COMPANY OFFICE MEMOR ANDUM To.B. Stevens Glen nose. Texas P
COMANCHE PEAK STEAM ELECTRIC STATION s.
REPORTABLE ITEM / EVENT EVALUATION SDAR-CP-87-03/SN-0220 6.9 KV SWITCHGEAR INSTALLATION i
0 As prescribed in Procedure NEO-CS-1, the subject issue is forwarded for evaluation by your Electrical Engineering organization.
Your preliminary response should be submitted to this office no later than March 6, 1987.
Submittal by this date is essential for the prr.paration of the project response.
In the event your evaluation cannot be completed by r.his date, please provide by March.'i,1987, a description of your planned evaluation and an anticipated date of completion. Response requirements noting specific prereq,uisite information have been included to assist your efforts.
Please contact me directly in the event additional information may be provided at this pdint.
R.P. Baker Regulatory Ccapliance Mtnager RPB/CM/ks Attachments:
SN-0220 Response Requirements NCR-CE-87-8 R1 cc:
ARMS W.G. Counsil A. London J.W. Beck C.E. Scott A.B. Scott T.G. Tyler L.D. Nace R.A. Jones J.E. Krechting H.J. Riggs D.M. Reynerson J.C. Hicks R.E. Camp P.E. Halstead J.F.,
Streeter R.W. Ackley (Action Assignee)
J.L. Barker D.E. Noss W.I. Vogelsang 0.W.
Lowe
~
ilbuRL /.2 i
DEPORTABILITY EVALUATION FORM DATE IDENTIFIED:
February 12, 1987 SERIAL f10:
0220 SCURCE OF INFORl1ATION:
NCR-E-85-201646-S (NCR-CE-87-8 RI)*
STATEl4ENT OF PROBLEll:
~
The 6.9 KV swit h gear installations (leal, LEA 2, 2sA2, and 2EA2) are
~
installed on structural embeddments which are not level.
In addition, ga::s exist between the concrete foundation and the switchgear floor,
)
As a result of misalignment, the operability of the switchgcar compon_e_nts cae not be assured during normal operating or accident conditions.
W 6.9 switchgear provides electric power distribution to the Emergency Core Coolinn System and the 480V Power Dist. System.
This issue is applicable to Units I and II.
- The deficiency has be'en observed during disposition rework.
EVALUATION ASSIGNED TO:
PBS/WIV EVALUATION DUE DATE: March 6, 1987 EVALUATION:
.=
.m.a.
RECOMMENDATION:
REPORTABLE YES
/ AFPLICABLE 10:
50.55(e7 PART 21 EVALUATOR:
DATE BOTH REVIEW 0F DEPORTABILITY RECOMMENDATION CONCLUSION:
REPORTABLE YES
/ APPLICABLE T0:
50.55(e)
C0t@ENTS:
PART 21
- ' - ~ ~
--~'-
BOTH REVIEWER:
~
DATE:
CONCLUSION:
REPORTABLE YES
/ APPLICABLE T0:
50.55(e) l C0FUENTS:
PART 21
~
l BCTH l
l IIEVIEWER:
DATE:
l NE0 CS-1 l
l l
!~ _ _ _ _ _ _ _
l a connurrow surrI I
i
~
n cE 8 2-1.
I Fage 2
eg g 1
CoNDZIZON/DEIA!LS:
l
~
REPAip-TQg.rnove sW31. 2EA2 cubicIts f Wu' 17 frarn ttse;t,[oundabei.
DISPOSITION DEIAILS:
Existin3 peg Wekes +o be ye rnovect by cy;rd.n3. (conc,et,, ffocy
%,{aca, of senga. 2EA2 cuhl k leveUed a.s pes DcA-29985 3 u, vendet inuructic Chacu S<pananess og casietes a.nd aAjust as ret 4
Stags. Cabine% hole si.te a.nd 'use (*tlet weQs on en G*nime Paft 3 of Y6 $41 kole, as shcWn 07) i Sno'nuzfac+uve<'s insfrue&lon Keat Reindalf, cu.6tcIes < (ka' 17 Pe5 Ptsyt*0dAC amj tuolls of SW31-
%e cdwve (4crfc coill be perform *2 ustk, f.Se supovision of he 4goog 1
Ve. ender
$W sejnts<m'lative(,600) l' F ** w i d -
"ey e-h :2 JusviFecATioN 1-OC! '7^d G' '--','tesanva w sme Stue acWWaa#khk su rEcHMICAL v-.. - -.. s we So wsw(6w~e%'d cGisk it wwt* W". We quv/pd2 Ruben. /%wp(8
(,,
. - DC A -79 9 2. On 2-2-g),
Z./2-
,, _ to,, c.uou.
- - ~ - _ _ - _ _. _ _
~
ecaw pect a TuAs LtLmas stancts o,c NCO CE-97-B #4 V /.
coMAMME PEAA S E S Ave Pc w,
OAu.As P0t'tA & UCNT cowpayy Texts ELECT *Je sisuct cowPAm
== = 1,. 16, l
- c.,
TEAAs POSEA 4 UGHT COwPgA
- 432, j
c a p as %
on e e >
l l
w fare: r one 72 N Abrw. amp L'
- M u e., w w At/ Ag&J' /
'${
l56" pM
~
M m
(*'"""kd[ M45)W % M
~
. 7. 3 MT * *
- w v
]
my i
a,^:.: r j
14
' fAlb'OfNO Ys $ -
f 2
N
' %{
L i
w%s, an"me.ma
~2., d k
i
^%
j g
g ens or c.a ww or
- n -A J
,, -u\\
,.-em w.-
,i f
s1sr > 1 zwsm
- e e
)
V
<N.mre swerwan dw U
.\\
{
he ~ ar as PLAN
\\
(L ? M.
y os sawror or ann >AAk d*72" (t
t I
l W
/W Ah n t 5
3 Y
DVL NfnLA4 sa ows Dr _.
5 N-h a,, ~m.
u -s w e as -
5' m
r, 4,,%
W.....-
stem t.eeA n ant a
rL
$ '(n bh[W D
et Ak 11.s n
starodrr str u
y.-
y y m.--
r~
s 1
y s
t' s
W
)
^^'
28
- /448F" A.
r.
C
{
Q'h& 'l}
l
-#M M O12'MA ywa pp A
xr
.u i
24Mddf b~
\\
d i
N )
)
n vu rumm.
?
! A i
?
^^W i f \\
M itWdt* **~~)
l V
1
- Q
, ( J1M i
i ptj g i i
i
'P '
i i
'M & " 'T' Ab \\
14 sim e ' 19 ' 2'o u e,
' TH twAtta 4
i
'&M J+1&T3td, $Mt'4
% CWA /2R t '
M WlE ' d A L* A f, f
\\
OCA 3/2.3).'
n L p-
~
l&c.4ofG
~
' ~./. 'BBC Brown ETveri SecMc, Inc.
2H
-=== :
u.n
,.aree new % s e anonaxma b
33-sit 61-ss
. sWITCHGEAR SYSTEntS OfVislON '
NCR -CE-87-8 feV.f
(.
k 'Sc" hi ' er * * ' - *
- W. ' S c= -
Errec.rtve Aa-=a E
,0' t.. wa usen ab serisw e. meswwg :
Pe n. ' AW 2 - hnuc+use.As. WeLoew4 Cc,ce,197S PAm,A.
- 2. 3.2 L
The ensc: rive Am.rA, A, estwa6s rue w,4y
~
' 1 Micas. Nasa M U.L vi P L t E D 9)f T k p: L a N 4 t et CW Tkt vee 4D.
E., = t = L t c.7o1 = 'A g
si C.11T x,0. f v c. ti'i
=c.osa sq.twcwas le W -./
7 Eri ec.r we Aa.e(, Es, or Peve. w eLo s iN 0 71 ' " '"
bl4. Hobas.
Pc,e. AWS Siv:uc.tud.A6. Watsiw A Coos, m s P4,u. d. s.3
'THE W PSKct eve A a#,A, Eu, env4 4 war ' Aiore c. Twe % ar tw "Ne PLAug. OF The Faye % c; (.Jesuru4) sud. pact.
D (0,.72 7 A
g,,. 'TT 7 = 314tss 4
m o.+1 sat., tuenn & $6E poTC Bft.on' 1
Swea, eA**
1'su9 w 88-8, t 5 Aeenos**Ataby
- Ys. 786*f1 We Ama'A Os
- % s Tesveo coupiquit,47:ou Aus %e n.t was.r 8 ps.v 4 Seet es
- 1. ('ff tFi e o o u %s o mae N 4.f, Eeviwit.eues-is Ps.ev a u.
@) Atorrs we as surerivt nan., r+w anen a o nu.Lar ww at ** - rwr
- conwMperL'M.c en rwe pot.gr PLarrywoonMrss og at 6MGe en 01046".
g CPNtr/ser ARM OP PM.LEr MrLO ptA Pt tI46tB MOLE 14 s Ra c.72x e.*F07A AID 46 s Alliant en rxe m.o Mounr,x< suwe r twesee Nos.es Pas unwer, rac errecrive ARCA 09 PIL4ft Mt.2-D$ Pf,.; C46/Ntr 13 C.9.16 7 s f.,$4 INWHICM e/ CECO 6 YN*
sK 0.091s 0.52 ts& coussrc@M+ ro rue yrsr sexporreal, l:p [ygg. gg,7 2/2/if M TNs.is.the prope,ty o.f. Brown Severt Desar6c. lac. and scritmens pr.oprieta.ry.nd..eenfidern.iel e,
1 UIN N APLC-
,u.
Pos 5 oF6 e
IMm2, INTERDITIPLIMO REVID (H5tl PCIN d - N - P 7-i mn nacervED:
'u n u m
'1 - 1/ ~ Y ]
A/C /[ - (' d '
}~~.
i occtteer REVIEWRDi
/
_,,_,_]
AtJDITIWAL DOCIMBKT3 REVIEWED:
1 PWXA3 HEVIEWED K51 (mam APPLICABG SIWIES) agtnnepfr QUALIFICATION (WAIVER _)
FIRE HKTIBUTJW (WA178R,__)
1
_ Seisunic Fire Safe Shutdcne Analysis (FSSA)
,__ Brwironssental
,_ Peretretion Seals t
__,,, Design Durineering
,__ ccost/ Production 9typort, FIN 2 HIPI1K7 FIN AND BQl11 RENT SIALIFICATIW:
4 f T4 U4 2 % ;,A s,4edif;ga. pg y,.,,. g e d a,d,,,,,d ],e et,a,,n ea) u,, (,f3>,
j 1 (cet-Er$~MGA ce ) ret her %+ (C P ! - EPC -NEA ve Wo % 4tsposiftn_ l h_give, oh r>M e Z of_3 n.+
pg 2 af T a The_ rewei-keJ kle ccence (viciiu s JC.,Isl h 2 ghe, aw png e,
'$ e.f 7, ca p f / g A arm y met d5 0Cn19tr8:5 S'/3 min - % asi e, fiv e, le %
es/erisk C r fike t w e (*! sit e s%ati
) se enn pJ k sin le k paren fke - sis a s G//s.s s :
( 41.,,
is,, c k n e s S Is *' t 2 enuce n or 9,t*
3 af O <A - 3 / 2 0, R e-y_ 2 ')
TM rew ek. J_ l l ht e n+* Vitti-I w, s,r is arv eptste s in e t m s. e sa.twy. vets a,,,
is
\\ me-e ~K. Lt gua// Red su /?u be 1
es 1 r rY Lv_ ha iteit l
A 6 c~
aI % tu, t/~ a..r pay e z
r..r th de< < m.ce r npp re..
a.'
sy rse. rei cunw-Up ActIm: K mer e %
M m oe e{ a t
1.2 fo/te1 <~ eid e em y &
c ir < << m fe e e n e e e 4'.ra. e p.nry.,,._s i s.t.
it <t%m e fe e Ae t e. Y L. t r>a e t s oc % cyc o s+
%g r,uas%,,e et I4z.a,)tof2.
3%
s fer se ale d r e s We '~ h ik i s Mrit is Pee c, ' a d rc < s. I es
_ f A.c <. 6. 4, /
/ R e.y 0
/~ /, c a / c 5.
<rpf SIW-WF/AITHOVAL (EfATIB OCDE: A-ANYKMED U4NAIYTENED Mt48Jr HpWIREU)
NULIIP. @AL.-8R19110:
$((l A. dhN
__ _ BIATW: __ _./) _,,_ M13: 2 - // g / '
B9l/IP. @AL.-ENVINNENTAL:_
BrATW:
._, M13:
FIR 8 R10r/F8SA:
BTA1W:
MIB:
FIRE HaCFT/PENB'IRATIM SEALS:
FTA1W:
m'IB:
FIRE naCFT/DBSI N ENGINEERING:
STATW:
M11:
FIRE MICFT/0MST/pt0D SUFFmr:
ETA 1 W :
M13:
REVIEW REQUB$ nD BY:
dg d2.4 EIT.:
o-us.4Eik:
mr. A.isia n
.:1..c :.:. c c r._ x seis iaa t 1
twwe>y,q s e i
a
- h h J
1 A7Yer/ Awn - AwSOrr.f f/f77 l
.CZ Gr/mer RF /thrnkh 9
.A'ely.
k D.E. DEemA1 7w nae
)
7 L.13a r)<v
'M f/edr'. e.,
i
-a.F. Mee T o.
hMc.
)
O. L. *Ti,<A.1 Tu dech,z.
0.in tow <-
ru awdac
&[ Qey Ty gjacfc
% 0 soke.s TO G 7 e. w v 60,F. SmTA NAc.
0 I-w.r.
e-r u.
hmc.
)
ru m
\\
Jm %,es
- N t &.00dA)3f(,
TU //fff/(
\\
4..h Pne#~
Tu c/<cmi$ >
1 J. is. Been r a a a c. w e.
i l
l l
CURTS 1
~
60 C
N I
YC NE IC IFED TNAC I
F g
IN z_
G I
4 S
/>
N A
E 4
K R
A E
T N A; N
R A
O M 6
/
D Y &
E L
N S
E N
N M
A O
L I
I TR M
P S
A E
U AE L
N L
G B
O E
C N H O
I C
N I C R
T N
O T
P C
A C
TI A
M R W F
R D
O S Y
O E
O N
P G
V F
A E
y O
S I
R R K L
I T
E Y
O S
C P
R O 9 N
Y E
A T
O L
R T
4 6
R A
R S
4 l
E H
N O
A U
R E C
A C
P S
U H L T IAF F 0 4%
yd s
l
CHRONOLOGY: SDAR-CP-87-03 (SN-220) 6.9 KV SWITCHGEAR INSTALLATION NOVEMBER, 1985 NCR E85-201646S ISSUED DOCUMENTING MISALIGNMENT CONCERNS OF BREAKERS IN THE UNIT 2 INSTALLATION.
TU ELECTRIC AND THE VENDOR (BBC5'j'1
- &q NOVEHBER 1985 TO AUGUST, 1986 PERFORNED A SITE INVESTIGATION OF BREAKER CONDITIONS.
SEPTEMBER 5, 1986 BBC ENGINEERING INSPECTION REPORT ISSUED. SEPTEMBER, 1986 TO SITE ENGINEERING TRANSITION OCCURS NOVEMBER 1986 (INVOLVING G&H TO SWEC) JANUARY 14, 1987 BBC LETTER RECOMENDED COMPLETE REWORK 0F THE UNIT 1 SWITCHGEAR FOUNDATION. FEBRUARY, 1987 10 UNIT 1 SWITCHGEAR REPAIRED NAY 1987 i l
FEBRUARY 12, 1987 DEPORTABILITY EVALUATION FORM (SN-220) ISSUED DOCUMENTING INSTALLATION DEFICIENCIES, FEBReARY 13, 1987 LICENSING VERBALLY NOTIFIED THE NRC 0F A REPORTABLE DEFICIENCY PURSUANT TO 10CFR50.55(E) LOGGED SDAR CP-87-03. 1 L__-_______-__
R N A A G E T R RO E Y P C T E A I R F L R I Y E B L T A E N Y T M 7 I T R I 8 I O T 9 M N L P 1 E G I E O L I B R T B SI 2 O E S R L 1 R D I O E P V F N Y N R M S MT O A E U E N N S U L O L E O R R B I B I I E B O V O C T P E B R I A F R O P F U L P F L A L T U A C I F N L S V I T E A E N N O M R N H U U U E P C S C T V E E 6 I O C I T T 8 D U G S 9 S R F 1 Y T TT T O L O S O S R A N N A T E L L R B N D I N A M A I V O P E D I I N T C T O E P R A H E E C Y T S G S I L A AF E N M N I R O M O A D L I E R M E A T Y L F L U N T B E D Q E I O D L N V R O B AT S I P I I H N A T R S E W I S E N M M S U P O E P S N O P T I U E I S S S U C S V M E Y Q O M N B O R S E F E_ I O T L P B M O Y R S P
I D D I E D RR S U E C I C C O NE C I E C W I S F E O D T T H N A G C I M M F O I E R N L F G B I O Y S R T I Y P L L I L F B A I I O S T N N S O E I P T S S O E P Y R E L G C A G N N N N I A I Y D A R F I E I U E T G N N I E T G D i! N I E S E I R R C O F O I T O F F C F A N E S U F O M E S I A R Y T R U E R I F D D O S E I T N E C V U A M O O B R I R R I T T P P RTNO C L
U V W I " I S O E F T) S R F I O A E D I P O V U ( E E G L 5 I G O G R N A 5 F N T N I V I I I E T E 0 T T S T H R " 5 N R E R T O R E O R O P 1 F D P U P N E 0 C I E D E I R 0 R E R 9 1 Y N C S D L O E O D I N E D L T K R N A C N A N A P A " E A C Y O I TI ) F T O F E O D 1 D F I T T O ( N 2 E I V A R 5 N A R L C I T O S N 5 O F U E T N E O I " C D P I E G I 0 T ) 0 E S S M D N T 5 A E 1 H N E E A A R U ( C S E L N H U F L 5 R S E S P C L C A 5 E I M N A 0 V D E T D I A T V 1 Y E 0 N C I N L N E L 5 U N L A E P A D U R A I R C N J 1 F S U B S U I ) A 0 C T S I E D N F 1 E 0 N S S G E O I 1 T 9 1 E I N N C I N S 2 A V 1 O A O G C R L C D E Y P H R T I F E N / L S C P C S E O C N A S U E A C E 0 I S M J R E O D N N 1 E 1 E R T N A ( E R 2 T E E U E A D R U U R I T E 1 D R V I 1 E S D F A Y E O I WU 0 D S E C F L O S C I T E G N I C 0 O L C O R I 9 U O 1 H P R P C V D R R G T M O P E E E O S O P R N I E E D R R L E TF E I W N N E R I N N G D T R O T E A E D N N R W O E C O V T F V E I U O E T R G U C I E O E L T P I C U N D S D / U R S E V A D I N N T S D O T R E R E N O E E F M E P N R T C I C T R A E H P E D N O A X O R TC U V N N O R R E E M D I S S E A I C P T B i
9 mi s 5* d>- br E i$ e s H" 'E 'e E 2 d"4at w >B = mmx M. 5 ' k~b I B id e E 2$. d$$W v a S
- W 4
i . s< M. am M U $~E 5 g D E gW i g o W Mdb a >d# w w E'di ~ = E S g* =%H it W W' ' 5 W
== t S i S z
- W 5gs
~ z C SE EE C BaB 5 _i v = o z .a 1 M O f E " ~U go 4 F U a 3 o v wa - -== M gm!b w DR
- v. 5 mk
= m l M & E w > O
- Og F
wb g8 E m l M Ms .8CE mm l E
- g 2*
=>da o em ma menf ~"E E P= "M5m gs-Ev-i m e2 geep = m$W sW -E%E d t 8 l 4 1 l l
) ) ) ) ) ) ) ) ) 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 88 / / / / / / / / / 1 2 6 3 4 1 3 0 0 2 2 2 0 1 3 0 3 3 E / / / / / / / / / T 2 2 2 3 3 3 4 5 5 A 0 0 0 0 0 0 0 0 0 D_ ( ( ( ( ( ( ( ( ( E E E E E E E E E N L T TT T TT T TT OE P E E E E E E E E E IL M L L L L L L L L L TU O P P P P P P P P P AD C MMMM MMMMM O O O O O O O O O TE C C C C C C C C C SH C CS IRK TR CO EW LE ER MR AA EE TG SHC KT AI EW PS SE EV L HK C I C B N9 U A C M6 K ) Y C S R R E O T A T O I E Z C I B N O A T I V L E L P A G I L M F E N R T U H R I E C P C T M N A / AU D R E E R TO N E R T A R T R A R T D O A E O A G A E N J N G O ( E E R A A I L L T G / M M E F L R A L T R V A I U T L S A E O P T A L E U E T MI S P A S P T E E H N E V E E E N D R C I R E R R R I AR T 1 2 3 4 5 6 7 8 9 l
) ) ) ) ) ) ) ) 7 7 7 7 7 7 7 7 8 3 8 8 8 8 8 8 / / / / / / / / 0 7 3 4 9 5 9 5 3 0 1 2 2 0 1 0 E / / / / / / / / T 3 4 4 4 4 5 5 6 A 0 0 0 0 0 0 0 0 D ( ( ( ( ( ( ( ( E E E E E E E E 7 7 N L T T T T T T TT 8 8 OE P E E E E E E E E / / IL M L L L L L L L L 6 7 TU O P P P P P P P P 0 1 C M MMMM MMM// AD O O O O O O O O 7 7 TE C C C C C C C C 0 0 SH C CS IRK TR CO EW LE ER MR AA EE TG SH C KT AI P EW M E PS T SE EV L L L C HK A I C T B N9 S U N K C AM6 I C E Y A S R T O T B T I A C I WE R N A N E V C Z L A E P R I Z I C I L E M E A M I T G U G H R E R G C T R P H C G E R A C E / C A R D H T E E N E T T O N C E N R N E TI R T O A T R E O N E A WO AL I E J O D N S O F E WD R A C I L L TS N / M ,M E F L R A A T S R R V A I U T S B S E E O P T A L E L E O WT M I S P A S L T R O E E H N E V E U E N C P D R C I R E R P R IA R 0 T 1 2 3 4 5 6 7 8 9 1
7 2 8/ T 5 NI 1/ ON 8 IU T N A O I T T SE E L L CU P ID M O RE C TH CC G ES N I L T EK S R E MO T AW D EE E TR LU S D R E KA H AE C EG 7 S 8 PH / C 1 ET 2 D HI / E 1 T CW 1 E NS i A N ? MV O I C OK T C C E 9 L K P R 6 M O O W C E R D E L L A U C D I E S A H B Y C H S P N N I I A A R R T T l
p--,.----- 8 M N2 b w M u e = = \\ = s g h 5 o E W i g W a it' W m 3 m M 3 m i 2 ? 4 G S E W2 w I a S a = 5 $w g em E i'E g m. R$ m. m 10 (J
5 E ) L ) B 8 TA 3 4 O T 6 1 8 1 ( N R ( 3 2 O 1 P 1 5 E 9 1 R ST E ) N L ) L E B 6 A MA 7 _ 3 N S T 3 6 9 2 _( I S R ( 2 2 F E O 1 S P 4 1 S E 5 1 AR E ) L E B - ( A D 5 T E 5 R U O S 0 P S 5 E I l R F S C " N 0 Y 6 3 O 1 L 4 1 7 9 1 I L 1 6 7 2 3 TO A A TI C T I T N F N E I AT TU O O S P N R " S U D P S N A ERT LAC 5 I 8 R 9 O 1 T 5 6 7 S E 8 8 8 I R 9 9 9 H P 1 1 1
COMPARATIVE TRENDS REPORTED AS FINAL "POTENTIALLY" ASSESSMENTS REPORTABLE REPORTABLE FACILITY PERIOD 10CFR50.55(s) 10CFR50.55(s) BYRON Z 84-86 (3 YRS) 17 BRAIDWOOD 1 84-86 (3 YRS) 3G WATERFORD 84-85 (2 YRS) 39 20 PERRY 85-86 (2 YRS) 57 26 PALO VERDE 84-86 (3 YRS) 136 70 ) COMANCHE PEAK '85-86 (2 YRS) 138 55* o 24 NOTIFICATIONS STILL PENDING FINAL DEPORTABILITY EVALUATION.
V E O DN E E V D T L O R W I L U C O S O E O E H N H R H S B E R U SI T E L S Y Y X R I YN E A L E D H AC OTM E O T F N I A M D O E S T I N G T A ES I U S T I C L R N N E H I C H O" U E E R T F N C P R V E E E O I E E S I B F .D C H R T A S F W T W N S I TN S O A O A D R OI Y N M Y P H O I H C ? C S A P TT I O E t0 N E Y E C L TH E R R TR U O T I I O A R .P T S C E T O TN S G U I R S S TS O TA N L F E I I N I N R I E W H E OT E T D C D TR C C MN N N S G R U AE O U O N N N O L v C C O C O O I P I xT R R I I T E A9 N O N R T T R R F E F I U D C C O 6 MN S N U A P Y A E E A R E L E C TS T E R E N H R S R E S V MA T O OC Y N I S I H F C P N R O T U T T F N R E A A C C O N OE N R T M E I UY S V R V C TD E Y M M K R E N I R E HL U U 9 O R AL OTT E C C P O P A MR S 6 F P E L F I I S S O - R A 0 T C E T C N H C C E N YS I U E T I I C E L E I H R R N M E I N T R T T AE MR A O C C C C I O N N F E E I R TF O F O L L F O I O T E E I F AS T G R N N I C Y N O U U G E E S E T I P T T I D A S I D E S S I B R N R V H E E E C O E T V P ) ) ) H R R H I E E E 1 2 T N P TWS D N ( 5 O 5 I S 0 U 5 L C E N H O T C
v-envng s v 3~ B7 NONCONFORMANCE CONTROL PROGRAM I. Describe the nonconformance control program as it relates to discovery and. initiation of corrective actions j to resolve nonconforming conditions. II. Address each of the NRC firidings. 4 III. Describe how the nonconformance control program meets 10CFR50 Appendix B Criterion XV. IV. Conclusion e 1
A DEFINITIQES i Rework - The process by which a nonconforming. item is made to conform to prior specified requirements by corrective means. Renair - The. process of restoring a nonconforming characteristic to a condition such that the capability of an item to function reliably and safely is unimpaired, even though that item still does not conform to the original requirements. Scran - The determination that an item is not acceptable for use in a. safety related application and must be segregated or disposed of to preclude such use. Use-As-Is - A disposition which may be assigned for. a nonconformance when it can be established that the discrepancy shall result in no condition adverse to safety and that the item under consideration will continue to meet all engineering functional requirements. 2 4
Heirarchy of Documents for Operations Nonconformance Control Program OAC/QAP Operations Administrative Control & Quality Assurance Plan NEO-3.05 Reporting and Control of Nonconformances 1 STA-405 Control of Nonconforming Materials l ) l I I Nonconforming conditions Nonconft,rming conditions prior to !saving warehouse after leaving warehouse i I WHS-001 STA-606 Receipt and Inspection of Work Requests Materials, Parts and and Work Orders Components l l 3 1
C 4 O OR O N RCAE PNT N S 4 My S S E.y E I T Y I R I Ii C 50 N R4 EE TPA IR TS W G m-E N S ,4 S I M U EY R O OH + FE D NR I R L OA I C O I N H CW MLNE A I E NE r R 1 I A S EA N C G D U O P N NIV D A N N E S UL E ,Y O E F R SO Y[ I GN T N U E S MF T VS1 O A TU A E 0 I EE A N C 0 TQI OS TB NR M mVPRH S EO R i W I E U GT E h U R C NE I D NE OS DSN NT P th O C i Nm M E T I
M5 / 5 0 0 MMA 43 - O E TS N y s 6 sO R 0 eWR6 CN 5 c/E oRPA 0 mW T NR4 S AE G EPA N E R T R S S W IMU SE y RO Y OH F E N R R E O O A B O D N DE CW mEKA MEC N cRRL OG OP E E HWR NN TN I bVNAf UE j/N OF R K R RNE SE ~O D ENM MT ~ W RO F ET A' R eW I D-NUO F M ET I
NRC FINDINGS i NRC FINDING NEO 3.05 contains wording that appears in variance with Criterion XV by adding the phrase "...and cannot be corrected within the scope of such requirements or otherwise [ sic] requires an Engineering disposition" to the applicability statement. This appears to mean if it can be fixed by some means, it is not nonconforming and does not need to be reported as nonconforming.
RESPONSE
NEO 3.05, " Reporting and Control of Nonconformances", paragraph 2.1 J states "This procedure is applicable to quality related items or conditions which deviate from drawings, specifications, or other engineering requirements and cannot be corrected within the scope of such requirements or otherwise requires an Engineering disposition." The wording in paragraph 2.1 means that any nonconforming condition which is dispositioned " repair", or "use-as-is", which by definition requires Engineering approval, must be accomplished in accordance with NEO 3.05 by using a Nonconformance Report. Items which can be corrected within-the scope of existing engineering requirements and require no Engineering input (i.e., " rework" or " scrap") may be corrected in accordance with that organization implementing procedures. In the case of Operations this means the Work Request / Work Order Program. l 1 a 6
NRC FINDING A note contained in Section 6.0 of NEO 3.05 states, "Nonconformance Reports shall be prepared on items when a ' repair' or 'use-as-is'- disposition is required." The meaning here appears to be that the ' type of disposition is the judging factor for writing Nonconforrnance Reports (NCR's), not that a nonconforming condition exists.
RESPONSE
The fact that an item does not meet specified requirements is the criterion used to determine an item is nonconforming. An NCR is required for nonconforming conditions requiring a " repair" or "use-as-is" disposition. If the item can be reworked, a Work Request / Work Order is written to%.e.r J identify and correct the nonconforming condition. a $'f,' wpnero 7
t: NRC FINDING Section.6.4 of NEO 3.05 starts with a sentence that reads, "Upon discovery. L of a nonconforming condition, it should be ' determined if an NCR is required." This again relates to the above note for detennining _ NCR requirements by the type of disposition.
RESPONSE
NEO 3.05, " Reporting and Control of Nonconformances", paragraph' 6.4 6 states. ir.. part, "Upon discovery of a nonconforming condition it should be determined if an NCR.is required. Work documents or NCR's shall be prepared to correct the nonconformance by rework or replacement. If the item cannot be reworked or replaced a Nonconformance Report shall always be originated." This paragraph clearly establishes and acknowledges that a ~ nonconforming condition exists. The question remaining is, can it be reworked, repaired, or used as is. If it can be reworked, then a work document such as the Work Request / Work Order can be used. If not, then an NCR.must be written to get Engineering approval of the " repair" or use-a's-is" and dispositioned. 8
c. l h [. NRC FINDING Section 6.5 of NEO 3.05 tasks QA/QC to perform an evaluation of NCR's. . The evaluation is to " determine if the NCR is valid, complete, and sufficiently. detailed so - the problem. can be clearly understood and i located." The steps following this section provide no guidance for determining validity. Discussion with a representative' of the applicant's l QA/QC department indicated that if an NCR could be written up on a Work Request, the QA/QC evaluator would invalidate the NCR. However, once the NCR has been invalidated and returned to the initiator, there is no explicit procedural instruction requiring the initiator to write up a Work Request.
RESPONSE
The validity review performed by Quality Assurance is for two reasons. First, to assure that a nonconforming conditions exists, and second to assure that items which can be reworked are reported using the Work Request / Work Order. Clear guidance does exist in STA-405' for direction as to what must be done once as is discovered. Paragraph 4.2.2.1 of STA-405 states: mm impman,. "The reporting of nonconformances that are on installed plant equipment shall normally begin with the initiation of a work request and work order, and notification of the Shift Supervisor." l { l 9 l
1 ) i i NRC FINDING Implementing Procedure STA-405, " Control of Nonconforming Materials". states that those identified nonconforming conditions that can be dispositioned by " rework" or " scrap" (i.e. replace) need not be reported on nonconformance reports. Again, as in NEO 3.05, it appears that, the criteria for writing NCR's is the method of disposition, not the fact that an 3 item is nonconforming. Additionally, the procedure is in variance with Section 3.9, paragraph 4 of the OAC/QAP above which requires an NCR to be prepared which identifies and describes the rienconformance. l s
RESPONSE
Section 3.9 paragraph 4 of the Operations Administrative Control and Quality Assurance Plant (OAC/QAP) states, in part: " Materials, parts and components which are determined to be nonconforr.iing, shall be identified and reported. Nc'iconfctmance reports shall be prepared which ic'entify and describe th6 nonconformance, the disposition of the nonconformance and reinspection or testing performed to determine the acceptability of the item after the disposition has been completed. 4 The term "nonconformance reports" as used in this paragraph was intended to have a broader defm~ ition than Nonconformance Reports ] (NCR's). The practice of using Work Request / Work Order and previously Maintenance Action Requests as nonconformance reperts has been in place since 1980. For nonconforming conditions dispositioned " rework" or j " scrap", the WR/WO meet all the requirements for identifying and describing the nonconforming conditions, the dispositions, and the reinspection and/or testing. l 1 10 { )
l i NRC FINDING l l The applicability statement of STA-405 requires nonconforming l conditions discovered -during receiving inspections-to be identified as nonconformances. In addition, the definition. of nonconformance defines deficient documentation ar a nonconforming condition. Contrary to this, STA-405 also allows items which are nonconforming during receipt inspection to be placed in a "QC Hold" area without preparing an NCR. Resnonse The practice described by this finding is accurate.
- However, procedure WHS-001, " Receiving and Inspection of Materials., Parts and Components",
requires that the Receiving Inspection Report be-checked UNSAT. and the discrepancy be described in the " Remarks" section of the RIR. A Receiving Hold tag is then attached to the item j and the item placed in a designa~ted hold area. At this point an attempt is made to retrieve the missing documentation. If the missing documentation is r-trieved then a reinspection is performed and, if acceptable, the RIR is checked SAT and the item accepted.for placement _into the warehouse. However, if the documentation is not received then an NCR is written, i 11
COMPARISON OF NONCONFORMANCE CONTROL PROGRAM TO CRITERION XY_ 10CFR 50 Appendix B, Criterion XV, " Nonconforming Materials, Parts or Components" states: " Measures shall be established to control materials, parts or components which do not conform to requirements in ord6r to prevent their inadvertent use or installation." This portion of Criteria XV is addressed in that STA-405 paragraph 4.1.1 requires that "All station personnel are responsible for reporting nonconforming conditions discovered." There are two methods outlined in STA-405: (1) the Work Request / work OMand,2) the Nonconformance Report (NCR). l 12
i .r 1 10CFR 50 Appendix B, Criterion XV, " Nonconforming Materials, Parts or Components" states: "These measures shall include, as appropriate, procedures for identification, documentation, segregation, disposition and notification to effected organientions.* These requirements of Criterion XV are met in the following manner: A. Identification - STA-405 requires that all personnel 1 report nonconforming conditions. In addition, various inspection, engineering and maintenance procedures also require reporting of nonconforming conditions in accordance with STA-405. B. Docuinentation - After items are released from the warehouse STA 405 requires that a_ nonconforming condition be identified either by a (Vork Request / Work ..'DrDr an NCR. In the casc of receiving, the item held pending receipt of documentalign without writing an NCR are documented as and LUNSAT on the Receiving ~ MMti6n~RIe@ The RIR cannot be closed without the RIR item checked SAT or an NCR written. 1 C Segregation - Items received into the TU Warehouse are procedurally required to be segregated or otherwise identified as not being receipt inspected. Once inspection is performed 'and the item is determined to be nonconforming, it is further identified as nonconforming and placed in a Nonconforming Hold Area. Items which are found nonconforming after release from the TU Warehouse generally cannot be segregated. However, items fcund nonconforming are identified by a Work Request Tag (when practical) which is placed on the nonconforming item. If an NCR is written, Hold Tags are i used (when practical) to identify the nonconforming conditions. Both the Hold Tag and the Work Request Tag are not attached under the foliewing conditions: 13
py (. a i ug L 3 x
- a.'
hanging the tag would be detrimental to the individual's safety; b. the individual's exposure to radiation will be unnecessarily increased; g-L c. the item is-on the main control ~ board in the-control room; and-d. the tag would interface with component operation. i D. Disposition - All nonconforming items are dispositioned as rework, repair, scrap or use as-is. Items which require engineering approval- (repair and use as i::) are documented on the NCR. Rework and scrap (replace) I dispositions restore the item to an existing engineered condition. M%dA l y E.- ND.tification - In the case of installed items found nonconforming while operating the plant, the shift supervisor is notified immediately so the plant can be placed in a safe operating condition should the condition warrant such an action. This requirement applies to the Work Request and the NonconformanceL Report. In cases where and NCR or. Work Request is' generated. on non installed items, the' person responsible for correcting the condition is notified. l i I l 14
L i ' 10CFR-50 Appendix B, Criterion XV, " Nonconforming. Materials,LParts - or: Comtsnents" states: " Nonconforming items shall be reviewed and accepted, rejected, repaired or reworked in accordance -with documented procedures." ~ These. requirements of Criterion XV are met in the following manner: The nonconformance control program requires that; a nonconforming. condition must be repaired, reworked, rejected (scrapped)' or . accepted (use.as is). The nonconformance control. program clearly: defines these dispositions and provides measures 'to' assure 'that engineering ' review is performed when necessary. .All dispositions must be-implemented in accordance with ? written procedures and/or - instructions. 15
O-i:- P 9 F CONCLUSIQN L 'TU Electric finds that -the nonconformance reporting program meets the provisions.of 10 CFR 50 Appendix B Criterion XV. However, the l TU Electric review of the program conducted as a result of the NRC . finding revealed that: improvements can be made in the program. A summary of these program enhancements which will be made follows: - Revise the OAC/QAP to more clearly define the specific use of the Work Request / Work Order as a nonconformance report. Revise procedures to to clearly. define the use of the term. " invalidate." Revise. WHS-001 to more clearly define placing items on a hold without writing and NCR. -Revise procedures to clearly describe the use of the Equipment History Program in identifying repetitive, ' vendor ' deficiencies, i-o. Revise procedures to clearly. describe Operations role and responsibility in timely review of Work Requests / Work Orders for 10CFR21 and 50.55(e) reportable conditions, i i 16
~~ (fWJUN O(M soi.) CONSTRUCTION DEFICIENCY REPORT h j 80 Page / of OR MIbrw?g WIT ! STRUCTURE /SYSTD1 IIDt/COMPONDfI TAC /ID mn Ss ~Se l!f n o<< 5W Al /wS.i/c [f2-fAsymj j;,G,,G; fjj, g 0AcA c2EA l/,7Ex.1 w-r/Suiess.a. ^ 9 /ppf & Myys o/ fo//op,k Sw)/ 4p DETIC15CT DESCK1PT10H Tje, 0 e y /Nb bo'"' hyh/5/cs &te swY /CtfewdNtsl4H / A WSskf AA' b e 4 s k s.w a' r/e scJ,i/e' w~//. '74 p*roJ4n de/ Wad We l =,,, -J.,h s ee w.das n' W. W h # /* u d f,te J.~ee k s /L ri sk pppptdfaslln50 c2 [A/ dud. Les/7 62 CAa7 $ u d. /s & V f, $a S, /V /f i s fynds k + d h w A CA $$ $ h l b'YSS h{, I nrnact n0CunI CS-/DD uv a-rm & z. / DAZE: REPORID SThYesph b $Ypd /"S~~ $ 7 // 12 ) / / f ' DA2E RYIEW/ APPROVAL /' / S~/D g CONSDOCTION NANACDUT ddM)/*$'h0'JALITY CONTROLO actwErKINc 7 Act?ON ADDRESSE DISPOSITION: EWDM
- SCkAP, i
E h A DAII: ACTION ADDRESSEE EVIEW/ APPROVAL: / Al /A i l ~' DATE: QE REVIEW / APPROVAL: A / / DISP 051X10H VERITICAT10F 6 CLOSURE: / DATI: C h// fonk+n as lw/$r /4 A fYf$~ Sh $ ll$"ID l CE?IMDfIS: j A lS l J J
v wn/ SYe[ & '1 l RECEIVED rn;ou 7. } A )R 1 0 19 N COMANCHE PEAK STEAM ELECTRIC STATION 3MB7 . I ic : DE9G! CHANGE CONTROL DESIGN CHANGE AUTilORIZATION c,a.c,,, so l d tocatio.,ro,w.tes stos/s cewet teva rie w ea t uu r a 4 r evienterit ourancar arrtettet a,et.tante gc ets O =o; r ves, tocarma cp/crt Et.cfo' 4 893' g ets O o. r ets. io =e.' N.'.# i ).let ast.m (Maast es e* Bedt D/Pe0FCsti stianst 10P f ematt Ces'* f /5wU. I G.9 K V S a'icH G U R LsuG UPS lEAi, tE A2,2 eat N 2Eh2 REQUWE RE!WWAL fRtH Exostoaq \\ l Q FLoog, McDtFY %E FLCOR, CARRY our NEcESSARY REPAnRs ou THE Swsrcuc,Ehg cu8sctEs AuO h REtN ST AL L. 6ACK oM THE SAME LocATr0H. VEubcR MAndAL cP 0425-00t sectroN 1 t%cs.bES f G.veDELIMES (b4 s%tsTCH GEAR REINS - M.L ATeoNS. l Tms Den PRoysDEs ADbarscn Au quonetones reg swerc8GE+e GrousrAtthTooMs. Reason M ONL'.#PEvowl l ISSvED To P2cVob6 ToLEtCANCE" fcR THE UNE Jcon*MG THE 1 N CEnlTfRS OF THE veP FRONT b BAck To 13E PERPfNDICULAB To THE CURicLE fdCNT. 2 RcAsoM fct RW 2;- REyostoN 2 iSsutb To provide ADDorioNAL GuoDEUNES Fct? W5TALLA TICMS } -op,$uoys PER S YEP $$ CF TH*% bcA REV' O-g Reasou Fot REV 3.- LENGrH OF MouMT6MG MARDWARE Vee SworcHGEAn?,, IMTERMAL Gu?cuEn Prevent cuascLs VEneasiattAroon .~.) ' r TmLee. ); Jgp Ainhem i AmN'Y lttoatt: 4 /~llf7 e*cc.mitafic=- bEC ter 605s Arreova /x eart:/A!f cercmatte se: J.J oerasts or taanst amo tassettems easio y "T'H#5 bcA vo#DS ANb SUPERSEDES Dc A-314 37 REV. R REnuGn An0 REensrALL cuatcLES As FCLLcM:
- 1. Plum 8 Faour AwD BAest oF CvescLES OS#A 6 CENTEe000eN0?rW AMo,3er7M l
Frames REsPEcrweL1 us*MC. NORMAL consry )9 gg l 'ToLGRAucE OF */qc cAn SE ALLOWED BE TWEE o m0 5t YTeoy CsurER t.wEs. AS OF.icN N m / I ( 70R OF CE AO g .,,utt...., g g.tet,, a at,=,*. ;.. g,r,a g, as o y,,,, o O U vts ao - 'B t mcaer w 33 w ~' ~' t a?323-ES 5 PEv.I V arrttf te estowtuf tsl Fst E ttass ice a O aca sart ' z Ct s tC N WODerstateson O vei eer en e eatsace erottss reeut E wo; t res, eu as , c, g ! Jeets ets. t a t taa it statn< et..t t rst 3 Orts %=e; e res. s enterie eta et O rts O-e,. 2 00tS 9ts85# thautt MFtCT a LICthttut f1CUWEuf t 8 uu Orcs M ae: e ns, teertsroaetatt maa eccretatt estuwtats R vts O mes r vt s. me' tart: 'Eo* Ot s5# ("^=ct et svec rat etvie w or a j l Cf.0426-00f. TEcT/t)Al 1 TccEc:W OF 2/ft/f7 BBC OIEMooR) ((c$[,',$, l.E TTEfs DF-732-007 8 009 Teucou of 9/'5;k7 ejes a =c, tattutarum se etv. eteuster O vcs 1E1ac I r vt s, cattutaten me.: etv. l eksamitarica Petrarias etsesu CMaast:bEf-MECT2*(< U etwasas,,g vts Q me; y ygg,,,,tagg LE fentw' TA !uA. t i _ltri eagt, 44'l ,,,_\\ htboe MA M L Fo# METAL CcAD et sren s,ett t.ciut te- { %rcam K APPLICABLE FOR NEV.! fg gf&t, /gg 74u ArspuS opty 4t aica etrecetatar'vt n eviscot Ld res WTo;' rvt sr f ..,,.,a,...- u-U.J ace.t. sist e,eures S its O me; r vt s. moitart: _F/_ 2 -' ca r t; .,c u a r u e t. ~ M N. (,ogg oi.a. ^ rur.~t ~sarre,f f' f' d N east.5 b .n,-~-- 82VAINEE_ ~% ~EC. Acu~st__ m_.__________
inmi COMA!4CHE PEAK STEAK 1 ELEC ikiCSTA'llOld DESIGil CHAl4GE AUTl40RIZATIOl4 Collill4UAT1014 SilEET y/[(",3
- m
,.o L e, so 2.AbsusT rue cuenctE so m',Ar rue Lune so,nona Tue Cenrees Of roe FRoHT & YoP OF BAcN IS PERPEN DiCULAR, TO THE CUSICLE FRenT. 3, WivH _ UTMOST CARE, REINSTALL SvJtTCH6 EAR CU8sCLES AS LOCATE D 6Y EMGtNeeRoMG hRAwouGs LcAvoNG MonsavM.Possn8tc GA P A T THE 8oTToM AND %THouT 8ENDING MNy ME TA L, 4 C U 6 lC L E-PANELS AND MOUNTING HAeDwARE oM THE Cu6*CLE S MA Lo0SENED 08 REMoVEt> As REQUIRED tuerug PEsNsrAtLATroN. AF TER CUBICLES ARE OiNSTALLED, CU81cLE PAN ELS 4 MoONrsN4 HARDINARE $ HALL 8G REINSTALLED. HACDWARE Fog' BASKET NUTS SHALL 8E SNuf TlGHT kND OTHE6 HARDWARE. WiTH LbckwASWERS SHALL 8E TfGHTENED UNTa t LockwASHER 15 Futty cordeessEJ). (EFER 7ME 7 fog ADDIT #oNAL To(QUE VALUES. g, AM/ GAPS. GRGATE& THAN I/f 6 " A T BOLT HotES IN THE FRour, REAR pur> To? OF M*1>DLE COMPARTMEU T, SHALL 6G SHoMMED TO bECREASE THE GAP TO I/16" OR bEM g, $HtMS $ HALL BS OF STEEL GRADE A 36 0R A s70 Anb 2"x c" (+ W, -1") kEth.l.. ~ (h) DE L.E TG $GN TEHCE IN STEP w 2' A030r To THE CUBICLG FRoH T. A00:- AD1usr cuencLE Sucy THAT TOP f' BorroM koetzourA L Pt.A NES ARE wt THid 1 %G" OF GAcy OTHER IN X, ANO y-Arts AS SacwU 8etew I t o TOP k 60TTOM kl0RsZeM TAL PLANES of SWsTCHGEM4 CUSICLE %"q(pgcursoctG(,P) e 6 9 KV (- A xis ~ PLAN 2/f2l27 h LB) NOTE.1-A T TACHEb PAGES 3 kij ("TELecoM 'To B B C DATED A2e Fce ENGINEERING REFE2ENCE OMY.
COMAl4CHE PEAK STEAM ELEClillC STAllul4 DESIGli CHAl4GE AUTHORIZATION!4 COlrilI4UATlori SilEET ."y*/fy"*g
- iu
- n 3 -,, g j
kev. 2 ;- ADD STEP # 7. F AFTER CcMPL E Tf 0N of GTEP # 1 THRu 6 AuD Yue cuescue. FRouT AuDjog Reax boog PANEL GOLTS Wou. No { r EnGPGs woin P> Asker NUTS 4Heu PEnfcRM GTEP w 7. 7. AuGa Tne cursocLE F R o a r A n t,l o g geng 'boog To ALLDW ENGAGE MEN T OF PANEL 30Lis AuD r3Ase:s r nuts, 2F pre vious Ly INsTatter; I $HsMS SM MIDDLE ~TWO HOLES Cf frioNT AND h 0R, REAR SGC To0M 1 Pasvest coog AucNMeNr, Remove Tseu. Renucu toog To { allow EN6A6EMENT OF t3iwet soLTs AND SASKET NUTS. Fot /4NY SEsvCTING GhPs Goeeareg Tuan i,g", I srate suoqs ro t N DEC REASE THE GAP TO l<6 Cet LESS. KEV.3.- Mouur#N4 scetws FoR swiTcHGeng cosicte INreenAL OcMPotVENTs THAT EtTEN) SE90ND THE ouTssbE TvRFACE OF THE Cussete MAy BE cut Flush (TOLERANCE 0" INss0E t hg" outs #bE Tees ) ro FascotuTare ALnGNMENT. CUTTING GCREWS SHALL NOT AFFECT THE ELEC TRKA OPERATION AMO ?ERFoRMANcE oF CcM?oMENTS, i 1 l-1 l 4 L
l bCA-91457 NeQ 3 Py 4 of o j L: TJFees (TUec0) Argegeeng11er J.o.se. 1634s/16344 JIrechtaas Werget I (TV6C0/TNE) { JComebl File No. R b* l Rtteekisy
- aggrave, Subjnt 6 3 kN SWiT*QEAf -
ElWasphF REeesterry* notees I apoltetee. 4 RJhadte _ J9teere* j J0Carty* leteemedy* j SPterry ~ funddes WJPerhes* GUBees 7312F335 DISCUsete d (Check one) CD5erdella* 2 JJtenstee - IsFOMAL 018C988tB 1 Ashes
- tl48ssth
)R8ehels Jaceeste ~ IDC/Chreas L sch P (Cas) gfai W .C"' IDC/Chrees 4W* (ISS) IssTRUCT!058: sameertse yesa disenestes, settag date, time, sad perttetpeake.
- Leested ta Ces fadicate desired diet, Reporter esse Lasert,ributtee et right.
11e number (e) La c uolswided seen. Cornependea u e,ees Coeresseter nutas ortstaat for N0Tro FE618987 % chroes file, amporter's seted steep call date 4.f 16/ S~) Time 7 : 2c An1 reenstas _ outsetas g
- Setnes, 4
(M) I C MilA M M e ($w) 6 (GE) GD Mi & Jew bsTwsta.ccasinacecas e e, Rac. .ns=> Somr. il6M909 WM ceN1AC.TED To dis cc Ss FEW Pte4WI - W 60 t.V SwnTC % EAll. 12. Ewe 44 71E Pou.cwl ^A l i l'TeMS wr1:0.s D\\ Score,GO M /W hGtc. 0 ib
- l I
i. EENDRAcN3 po g v sNtcQ trTe.O *9 5' W tRES M W 1 TTMe5 TM WtRE ccT51bG: 0 6 A5(c^R j INTNWT10A) M MDT D AMhCLGD. I 2' To SAT 1 SH i GE-E ha (LG4 vi0.6.MGWTI Fot St;PPtt TW l l l 6 18 1609601 82 l l
7 vt t
- n '% ! \\ev, ;
W 5 0f.10 i Ps93 eg i NOTES OF TEllPHONE CONVIJtSATIOW/INTORMAL DISCU8810N <w
SUMMARY
(Cont.inued) T4F Wl(WS He242cNTMA.4 AT.$ ts" At \\lESTiMR" bl.Y2Act164 A D'DITid 50PPoETS/TlE tJA4.5 4 ) Wr. To %E iM!;TA(LGD iinIDE CknTC4+6P !L-C.0 4\\C.L6 5
- At 'm E9F W tvd GwST % Abbrtw-Ho\\.e3, Fteu) wttL SE4uM: NT-w Hou?5 To R6
%(J.C--O eit. SePeetT3 To f46 \\r4 TAtuiro, t eMTI*J ANO t<D W\\(A. Ik6 4 9E4 ot(LGO - 3, c.vitic.W-S Wtu. 46 As-IusTAQ,.GD to T4 AT % C<Af WTWtiEf. %) . CoStCASS it MDT Mo M Tm 44 A conzws T. 9e Atuorr-o XJ% wie witoe s r-e.sv to wt. i l 1 e 99 6935-1634503-82 CFF-010T-90
nmm ~ BBC W owm =m m eeC DOCUMENT CONTROL # DF 00732-007 DATE: 4 MARCH 87
SUBJECT:
REWORK OF UNIT 1 AND UNIT 2. SAFETY AND NON-SAFETY 6.9 KV SWITCHOEAR. COMANCHE PEAK. PROBLEM DESCRIPTION: THE PROBLEM WAS IDENTIFIED ON DOCUMENT NUMMER NCE.cE-87-008 , 43 INVESTIGATION OF UNIT 2'S TRAIN B 6.9 KV METAL CLAD SWITCHGEAR REVEALED AND ESTABLISHED THAT THIS LINE UP OF SWITCHCEAR NEEDED 10 BE REMNED FROM THEIR ORIGINAL FLOOR SILLS TO CARRT OUT LEVELING OF THE FLOOR AND OIRER RELATED WORK. DISPOSITION DETAILS: THE PROPOSED NOLUTION AS $!!OWN BELOW/OR ON DOCUMENT HAS BEF.N REVIEWED BY HSC AND CONCURRENCE IS NOTED BY TATT5UTTffE ENOINEER REPRESENTATIVE SELOW. BBC BROWN BOVERI DOES NOT HAVE INSTRUCT,{.0,jl jyfijiqq,Jpq,,IJig'QLQqt.Eq%.'DLE..-- REINSTALLATION OF 6.9 KV METAL CLAD SWITCHCEAR. THE REINSTALLATION OF THIS SWITCHCEAR SHOULD FOLLOW AS CLOSELY AS POSSIBLE THE INSTALLATION PROCEDUT,* OUTLINED IN ITE INSTRUCTION MANUAL I.B.8.2.7-1. SIMILAR PROCEEDURES SIDULD BE FOLLOWED FOR UNIT 2'S TRAIN A AND UNIT l'S TRAIN A le B CLASS 1E SWITCHGEAR LINE UPS. pg 7gggy, . - -..... ~... -.. - - - N"% .I B. 9 2. f - l HKS Estu Soeue.t unoe a 'f0ve. DocurnF T*ce.0 TECHNICA1. JUSTifTDATION (FOR REPAIR AND ACCEPTANCE) / esc nMOWN BOVERI o c .INC. JAMES S. MASTERS 50C FIELD ENGINEER
1 ,,,43l p ' p et ~ BBC 474 l et$C DOCUMENT CONTROL f DF,00732-009 D A TE: SMARCH87 i i l
SUBJECT:
REWORK OF UNIT 1 AND UNIT 2. SAFETY AND NON-SAFETY 6.9 KV SWITCHGEAR. COMANCHE PEAK PROBLEM DESCRIPTION: THE PROBLEM WAS IDF.NTIFIED ON DOCUMENT NUMRER TB 8.2.7-1 , 43 THIS ITE IMPERIAL INSTRUCTION MANUAL DOES NOT HAVE ANY GIVEN TORQUE VALVES FOR* - -. ~... BUS BOLTS AND OTHER CUBICLE BOLTS. f _.-_......l i l i l DISPOSITION DETAILS: THE PROPOSED N000 TION AS SilOWN BELOW/OR ON DOCUMENT HAS BEEN REVIEWED 16Y HBC AND CONCURRENCE IS NOTED BY"TRE BBC Fiff 6 ) ENGINEER REPRESENTATIVE BELOW. i 88.C.RE,C3M[03,S,,TH,E, f,0,L,L,0]I,N,G, lAL[,S mR,,,gS,Qj q_((if MQq,Q,(mig @ 4",3QLU,,, ) l 30,,45,3 LBS_ DRY,,THR,EAD,, 5/8," BOLT,S,,50-J,5, _FT., LBS DRY THREAD.. WITH THIS WIDE ,IUdlCE,0,F,, TORQUE VALVES A UNJF,0,RM,yA_L
- S,,H,0ULD _TR1,3 BE KEPT.
PANEL OR OTHER CUBICLE BOLTS _T0;RAU,E, VQE,,Q,E,(AL_T_0,'(RJ,, FULL _, CAMP,,R11,[QN OF THE,... L.O.C.K W.A.S.H.E.R rtCHNICA1. JUSTIFICATION (FOR REPAIR AND ACCEPTANCE) A x s /L Anw MC tlROWN BOVERJ, INC. JAMES S. MASTEKS BOC FIELD ENGINEER 1
(C.A. 9 SW'fl Ce. F-fc ? of fo LDFsce (TUOcc) Atole3enotaler I J.C.No. 16345/16344 Arechting WCardel ~ ~ (TUGC0/TNE) E 080 raves JCasebrece* File No. SI Rid &ckler ~ t a nsyty tseseberry* Subject 60 d SW"TMJE%E ~ statans L trettetse* aandse Joseere.
- Carty*
~ WWEensady* ~ OFlarry Tnstaddae IJJG WJFathes* GUDeas 7513F50015 DIscusste V (Check one) CDBardella* _ JJLaneres 1 INFcasAI,etscuss!s Lastes* WAsatta ~ Wtschmis JRCeembe RDC/Chrena 1 D \\.each (CA4) l ~ Gl4bmmi , t.,,, IDC/Chrese ggh.y n (E80) INSTRUCT!0BS: funnartse your discussies. P obphawt .l 4 setise date, time, and particip4sks.
- Located is CA8
!adicate desired distributes at right. Reporter sust insert ille number (s) La space provided above. Cerroependeses Ceatret Coordtaater retains original for MM6pm a$m u Chrone File. RepNr'd" 1 Calldata_3IGIBl1 Time 10 W h facentas _ outsetas seeve.. a (Tuoco) sac.)% Eval.EM AN) a R. $9 OMJEtlScEnJ8W) SpetwusT -(Ac.vswtA - (085) e 1 a (cortsacTons ca et ofusas) staesAar: 1 rAttsff To 9,ERomv6p_. rd otsc.un rne pew 3C.W L CE 1MsTAA1)*rT\\crU eF 6 9 kd SwiTcHW. . 2.. f es ti e wr eJ24 ricMi kJSAG D\\SC OSCE 0 A+JD SWE<. SDEC.WLtST Dc. ES tJt(T SEEE' ANN ffle& W 10 C4tE4tN i . crtti THE 9_p r> M Qg. A. cgeevuD nus BML_ %tW DE0MaE:0L PvtTef> M06 M i ft. meuMTin 9 WAeqTcgust AT THE ReTPM wiM Rt 4 l i 6418 1609601-82
{)C/t O ^$\\Il b ^ E*TC 7 C3 f 0 Page et NOTES O!T TELEPHONE CONVERSATION /lNTORMAL DISCUSSION
SUMMARY
(Continued) M EM 0 E-D dMC E6 D $ 4Ft 1 MCTAL To ilG LVMDGD C-NTTBuctton) MAA>uAL bestof1est.toog % PE --INSTA4tNTim! (4'.oc-GDufter. tycA 3)g-) f).go o j DEANES 9ItorE0t(Ita To Ng:-ItcsTAll.c A % T t.V P M (L& t G t F 'I / 4 H. M em 9 4 = ) I i l i \\ i 6935-1634503-32 CPT-010F-00 ___O
edw cT1; BBC oaow= sovo y l BBC DOCUMENT CONTROL # DF 00732-027 DATE: 8 APRIL 87 l'
SUBJECT:
REVORK OF UNIT 1 AND UNIT 2, SAFETY AND NON-SAFETY 6.9 KV SWITCHCEAR - COMANCHE PEAK PROBLEM DESCRIPTION: 1 THE PROBI.EM WAS IDENTIFIED ON DOCUMENT NUMBER DCA 31437 REV. 3 , AS LENGTH OF MOUNTING HARDWARE FOR 6.9 KV SWITCHCEAR INTERNAL COMPONENTS TREVENTS CUBICLE REINSTALLATION. l DISPOSITION DETAILS: THE PROPOSED SOLUTION AS SHOWN BELOW/0R ON DOCUMENT DCA 31437 REV. 3 HAS BEEN REVIEWED BY BBC AND CONCURRENCE IS NOTED BY THE BBC FIELD ENGINEER REPRESENTATIVE BELOW. ) l ) TECHNICAL JU5TIFICATION (FOR REPAIR AND ACCEPTANCE) 1 BBC BROWN BOVERI, INC. ,[ $ds BIttyNBtE -BBC FIELD ENGINEER l l l 1
,9 0 "V W C'(/ W J g = Q '.*( e #y j NONCONFORMANCE REPORT j r. NCR. e r. n - g 4, COMPONEN1 NAME h COMPONENT IO NUMBERh $UBCOMPONENT IO NUMBER h$YSTEM/5US$YSTEM NUMBERhWORK DOCUMENT NUMBER h l-_ QN f b)d./ l'Al-fk>> Af-De2. c9 E A.3 O2Y8 d/Ir DOCUMENT 5/ CODE 5 v'OLATEDh TYPE D DRAWING UNIT NUMSER h LOCATION / ELEVATION / ROOM NUMBER h IR NU h JM- /T /00 # / _T 5 5pec. l l p ~ COPY TO: dNONE h C. CODE Q g ' gep ' ;: 74 5/DETA40 h &y_pgy,,y,/ g fjg p y d &c. O STARTUP MANAGER ,,/, w&v4 n~.s Q MrA e <s,p sh~ twl Wen Ouh.Ms on Yh*l' /f' W.ebCafYt, A+ k _ f uhk/4 /Ak.N ke.rC& k W .sM4%/L :&..uck 46.b!-Km..a4. We.*/b. t1 t'd-pM.. OfAAfuAW hd 3if3)~ Q. $ $ h). //, JZ.)2, Js/, J f /4, / '7 l rssw / ds WsN :r'/$ W '%6 (64 - FM~ WA - ut) 6.~ m<,. ric-- rh /Ars/ **' l'/I/- f ?- /de S & -Ed - f/ A / ' p n s ;. sa LA s A.- /*1]A f > /M. // h b"/ I TAG 5 N '2 DAT OVED / f) ATE NO. 0F TAGS SSTnATOR m s
- er rw /.8~-e 7 C
/ O YES WNO Dr5PO5fT10N DETAES: h O REwoRx 0 SCRAP M O REPAIR O USE.AS.is ?D i AFMCTED DOCUMENT NUMBERS TYPE STATUS LKEN51NG DOCUMENT CHANGE WPE CODES SAME AS A40VE STATUS CODE 5/C WILL DE. N
- WILL NOT DE @h O YE5 O NO DE5 POSITION SUSMfTTED tY DATE h INDEPENDENT ENG. REVIEW DATE @ DISCIPLINE ENG. APPROVAL DATE h i
DWIECTOR OF ENG6NEERING DATE h QA/QC APPROVAL OF OtSPOSITION DATE h ANI REVIEW DATE h. 3 Dr5 POSITION ACTION COMPLETE DATE h QA/OC VERIFKATION DATE h INSPECTION DOCUMENT NUMBER h i sEAMJtK5/ COMMENTS: h l i O POTENTIALLY $lGNIFICANT ITEM / EVENT PER NEO C51 (b jl G O YES O NO 54 neto,e/Do.. M 57REV O h DATE e W Ae hem is under Operations control. 6e instolled. ond work documents are NOT inprocess, SMt Supervisor nottf 6cotion is required. i eso s_se s 84
I w Q: NONCONFORMANCE REPORT
- * (,5 ~ gy -g,
COMPON(NT NAME h COMPONf NT 10 NUM8ER h$UBCOMPON(NT 10 NUM8tR hSYSTEM 5U65YSTEM NUMBERhWORK OOCUMENT NUMBERh C AJ-EN**W-0 / a r,4i f,MP' S&L/ fA2-t/suir/-o 2. Q exa O*2 d8 A) DOCUM(N15 CODE 5 VIOLATEDh TYPE D DRAWING UNIT NUM8(R h LOCATION.(LfVAT80N ROOM NUM8ER hIR NUM8ER h f5-/00 J7-42 I6 5 Spec. l jf C ODE COPY TO: NONE b / O SNiFT Supervisor e COND(TCNS DETAILS: h //,g g py, ,g jj,r O STARTuP MANAG<R g hesb Y t'4k u bt kf Cr P C f MOV lfAf* 4n b *elON 0A de Slsef H bo* f n'C d po d4 ~ Je/ w de.d u - h,~.s-J e a d :Me rhd/ead Mk
- bMC&
/71 4 f) /Y WWs*er/f h ),ogg fg hygg,;g gg s /9 // *'d,/WM e2 FA/ t'O.d'# 6, / 7 A 6AA fu U /, l, 4,' ~G 6, 9, /% M~ & & pftw d A n /d/ D-/06 66 AT DATI APPROVED BY CA/OC h DAT2 NO.OFTAGS NCR TAG 5 APPLIED s-r-Pp _ ll,& e$c/r7 0 res WNO Df 5PO5tT40N D(T AIL 5: h O RrWORx' / O 5 CRAP O RrPAiR O U$i.45.i5 I AFFECTED DOCUMf NT NUMetR5 TYPE STATUS ~ I h itCINSING DOCUMENT CHANGE 51 ATUS COOT 1/C a WILL Bf, N. WILL NOT BE h @ O Yr5 O NO De5POSITCN SU8MITTED BY DATI h IND(Pf ND(NT ENG. Rf VIEW DAff h DtSCIPLINE [NG. APPROVAL Daft '[ DIRECTOR OF ENGINEERING DAff h CA OC APPROVAL OF DI5POSITON DATE h ANI Rf VifW OATE b DISPO5ff40N ACTK)N COMPLETE DAff h CA/OC VERIFICATION DATE h INSPECTION DOCUMINT NUM8tR h REMARKS COMMINTS. b POTINT& ALLY SIGNIFICAN18 TEM f VENT P!R NEO C5-1 O O vt5 0 NO $6 . ore Do.. PO51 R[ VIEW h DATE { e if the esem is under Operonens control, is instofled. ond work documents are NOT inprocess. Shift keervisor notification 6s required. I, wee s as e 84
u NONCONFORMANCE REPORT l
- Q[. gy 4-COMPONENT NAME h COMPONEN.T ID NUM8ERh$U6 COMPONENT 10 NUMBER h$YSTEM $US$YSTEM NUMSEthWORK DOCUMENT NUM8ERh CN NJWist-0/
Q rnt [ 9fb/ Sts)4 / t*/D-NSkJ/'/-p 2 R 2 A.2. OA/$ A)l/? DOCUMENT $ CODE 5 VIOLATEDh TYPE D. DRAWING UNIT NUMSER h LOCATION / ELEVATION / ROOM NUMBER h IR NUMBER h Es- /n J-2 S s. spec. , /, c1 $MR J's.2 COPY TO: M h C. CODE f. /ss to 3 m LJ SHIFT SUPERVISOR e h
- fM'
(/p g g ,r,,y Ag O STARTUP MANAGER CONDITIONS / DETAIL $: G ':/je << A !. b A-r 6,,b~e.e,;,. sG af,w r, Sr.; y
- c.. n o -r u
4-iS r$,n..- ,,;a po We ~ Jehru de rke ,A We n J<d.de w /h r./.s-m AAsseca m n}tj /p/ dy*/j,,7,s ,4,,a,,y g g,g,,,y 4 // M W,4* W o^' c2 P'A/ 4 a/./ 4, / y 4 A M'2 6SW / d,, 4,' s 6, 9, /% /J~ i s Nnv'DYrn/ bon $4W D -/06 6~C APPROVED SY QA/OC h N A $APPUED T DATE DM&. AATEVs/r-r O YEs G H 10 NO.OFTAG5 /-r-pp DISPOSITION DETAILS: h O REwCRx / O scare O REPriR O usE-As.is O .\\ AFFECTED DOCUMENT NUMBER $ TYPE $fATUS t* ~ y, if TYPE CODES. SAME A5 ABOVE 1TATUS CODE 5/C WILL DE. N WILL NOT BE h @ O YEs O NO DtSPO$rTION $USMITTED BY DATE h INDEPENDENT ENG. REVIEW DATE h DISCIPLINETNG. APPROVAL r'*.TE h DIRECTOR OF ENGINEERING DATE h QA/QC APPROVAL OF DISPO5fDON DATE [NIREVlfw DATE h { l Of5*O$rnON ACDON COMPLETE DATE h QA/QC VERIFICATION DATE h IN$' ECTION DOCUMENT NUMSER h P REMARK $rCOMMENT$: h POTENTIALLY $4GNIFICANT ffEM/ EVENT PER NEO C51 h O vEs O NO swo,.< Doe. e if ahe item is under Operoeions control, le installed. ond work documents are NOT inprocess. MT R lEw DATE Shift Supervisor need coton is required. . 7" " '
wwu vu vg s-?t h 'RECElVED 3 //
- ()
DCA roRM 1 Pags 1 of d FEB 181987 COMANCHE PEAK STEAM ELECTRIC STATION DESIGN CHANGE AUTHORIZATION DCA NO. '79 ' 2 REV f DOCUMENT CONTROL gpg DM# A//A 1. SAFETY RELATED DOCUMENT: V YES NO DCP kl/A i 2. ORIGINATING CONTRACTOR TON E 8 4AJE85fEO 3. DESCRIPTION: 33 512G8 -E52 Aw. cR22ses - E2- 0716-O f 12 1 33,5f248 E853 Erv. CP,3 232 S-S2-osif
- f A.
APPLICABLEJE507DWC/.DOGUMENT [!!2 ~ M~ MN-REV. f E. DETAILS Tum Envos sart %nbc Arth.Gipf32SEDET bCA ~R22 f.EV 3, Tn Safea ua rd AnHdino 6 2 G t EL. 8 40*- 6" Ghd 262'-6" anchos 7?2 KV GMitchae$1 h emisedded ffoot Cisavnels }u sin a widha o?oM n.72 " holes Incated in eacl, cat >i;wY kase. Att L/er mus+ 6e msed when _@ldiw. Cal,inet b, cha nnel. IAleids si,a N mot he dYouni NOTE?- F~os' hteital hole inration e ajnd Cobim7 l loca 6em c hu vu mbof docionaHons See ITE s v raNivac 3 3-512c t-E182 anol N (CON T/A/UED ON E9&f 2 Ofk ) \\ A ( 1 JUSTIFI ION 8ee Rt9e 2 O[ d O / 4.' UP ENTATION: h h,\\CY/ I:l; S1: 2^ L' '~' N h /(fc.W/ NCR # CE-87-8 2GV* i ARE INSPECTION REQUIRED: / / l k REVISED INSPBCTION CRITERIA: / res no correspondence w { APPROVAL SIGNAIURES:Gl [ d I 772/e zk/n A. ORIcINAToR: E 4
- 8. Dr. SIGN REVIEWYOR TYI$U Nd/N E
N 7"> C. DESIGN REPRESENTATIVE: DATE 7-17-PY 'p.GA pn' Completions (1) Damage Study (1) Westinghouse (1) T/0 Pkg. Grp. (1) Des 7. STANDARD DISTR '$ lee (1)S/U n Review (1) ww .--..n.... Gilbert Mcpheeters James Morris FORM: ECE DC 21.1 Jan. IV5/ p. a... ~ ~-
DCA -79 82 Kev-4 AGE 2 OP b. 'B. "D E TA I L S ( E-f53 u m4Ift 9 41 m - L c ccgJg,cg g h y g,q g 64f n,c ' n er o p1<, t,Ie SEV-B-For El. 852'- G" 7 2 kV swi 4chgear cabinet s f fA,y 7 o n f<p 1?ev:se hole size, and 'use f'illet welds 1o hold sal 4ct, gear Cabineis to ernbedded channel, as shown cm ' pay 3 of'{, hdd Shim plates, 40 vettical Sus.(aces of cahive-fs
- whence, Cahine~ts loolt lo3ethe.1,os shown on 'Page, 4 of 4, so bucakers Can he-Pa* Vere 3stabbed inib caGnils,
KEV,3; For
- a. ss2's", 7 2 kv switchgenY, cabini.ls i iku 7 onl :y ex,'s u ng plu.3 welds to he removed by gainds'ng. cemteggngg q
hofeg fos O)elclhy Cahineis to ennbedde) channels is g -lo be on Center 9ines of embedded Ghannels,1%". Rev. 4 :- Rev s of 'th '* Dc ^ appbad ony +o en h*cles 1 14,v 7. 9 avision 4 is bein3 in % LucoA to incha au cabinets 1 % u 17 -{es switchgea2t '2 EA 1 and 2en.2. Exisiag pby welds tb be 'temoveA kJ 3vndiny. Revisa hele size. ) cred fillet Melds to holo ( Switchgeac ca.hiniis ih ernbedds Channek as Shown fhge
- 3of4, on AddlHan of Shln1 plates te ve1 tica.0 Gum face-o 0f Ca,6iveh cum.
'no t W ired. kun %,n by.s,.t '( talena nee-fa Cede,r.Umes of holes G.e. fou' Qas in cabinets welded te e mhadded channels lb he on Cen % Greg of embedded. Ohannels.} }osti(~ic ATioN : - keabyn me<> t d f Cubic /cs,
O scaw Mdd /$gg, pg::wg.y4 TEXA5 LT!LrrII.3 SUVK15 INC COMANCHE PEAA 515 duLr # /9#4 A,,, P ,, e i DALLA 5 PO*'D & UGMT COMPANY cm > TIA45 ELEC" luc 5p%1CE COMPAS7 h* ')--- l TTAAS PO% D & UGHT COMP AS7 j on a w > c a a am = A lL2 a w )3rdw_w est 72 kW 2%mmP u* m u ms,.m M/ Mt / di /%*um m l l ,l M /#' M M.ffha *r, N m
- 7. L 6(V sumsw" up
-l m vv-c,=="- l 1 r P fAWOSNO WA $ - n A t gy*( d
- /dpMk #72'*me mue """2.A d
ou e c.newr or --.. - -% J u -g ..mem, w 1 frzz zzwsr M ? YWOOhn*Sb kM PLA N \\ hard~ AAmy An n w ss,wro or CL s TW \\g
- (
nas>> ras 9 72" W JW an g. l ~ me, woue Iniit ~ t 3' A su o w4 1rr - _. 9: \\_ , 4,1,% m.ciw-rin t,,rd i .. m . u,, up ran Leca nant a r rL s Y $ (JA DU a #' Akass n c ,,r., e J i F c' 11 r +-- m' """ ~ 1 S ) g rp sy= { l \\ ', 9 %,b% ;j' l opis~s o n ' w ~. ww, n naasar n 'Y J N j. i vu amnu. ? A M8tWst" % h Nl
- h l
i , q rm ! ?' PLAN' i l 1 i _h fW Mb I 4,J'G g/Ed 19 ' 50hfA b
- f*MI M eN fJr t
nw mera (n% ana r ir e iz a w n DCA 3 /2.0).
PC2W DHE ! TE.AAS L'TILTTIES SERvtCE5 INC y gg / gy COMANCHE PEAK $ E 5 - D ALLAS PO*'ER GHT COMP AN) cm e. TEAAS ELECTRJC SER4 8CE COMPAN).
- =
- TEAA5 PCSEp & LIGHT COMP AN)
) yy y 2 ft* V 1"We7tN664R n;;;4Bh*d>* S40er. m m u SM }9Fdp 6 /_ w aa fM s / E2 ho KWi&6 &4)r ' CAD /Akt ye M \\" YF < f Je c t }4 ?/ ( A L .I I I i I i n g }- ( noon sua. R&r. 26 b we,. 51 - kin s t -Eff3 -r,i,- /" , i T f "L T y a J i <,#1ff ry.n "M"fi _ i-G ~ \\i lilrA. m,- A / //&// "X/7"7 LZ 7.T7" \\ll /d /-L / / V ///7/ CZTZ XZ7J ) ' lu' /. s of. /N//// TIJ ,ZTZd ) c/r _.o's/do V/// U Zddd/ds e oc,d 'X//// AJ,M/dMa t i o s rr _d ' N'/// 'd/dah/Ms/sL e 4 / 'Yr/ W,/2p,D/ < 9/ ZdEwh/s4A } i '\\/ d4/M/dr/) \\ G Y chaC M /d dadt 'r ' L \\, /d. v/,/ / / / 'J j f dtrJoAu A/4'udr/bG I LAlbh / \\ = i
L. wL.- u vwy ' vy - w p TIM-870143 TEXAS UTILITIES GENERATING COMPANY g7 w - Y e. OFFICE MEMORANDUM l l' T. Distribution cien Rose. Texas February 16. 1987 3,i,j ca Comanche Peak _ Steam Electric Station Testing of 6.9KV Switchgear Both trains' of 6.9KV class 1E Switchgear are in the process' of being. de-energized for rework of cubicle mounting and installation deficiencies. This work will require determination of all 6.9KV power and control cables that are terminated in each switchgear cubicle. All switchgear work and 3 testing vill be controlled by Construction Work Orders per STA-806. l Startup.is responsible for work restoration and retest plans for the 6.9KV switchgear. CWO C87-0669 will document Startup. testing of Train A 4 Switchgear and another CWO under preparation will document Train B Testing. Testing should commence sometime near the end of summer and will be based on the following startup prerequisite testing. t XCP-EE-1 Megger/Hi Pot Testing XCP-EE-5 Switchgear and Motor Control Center Testing XCP-EE-8 Control Circuit Punctional Testing l XCP-EE-9 Initial Motor Rotation & Run-in (rotation check only) XCP-EE-12 Annunciator and Monitor / Status Light Operability Testing XCP-EE-20 Continuity and Termination Verification I It is anticipated that prior to re-energizing the switchgear per EE-5, thet EE-20 and EE-8 testing will be performed on all internal wiring and field cables to verify feeder breaker control circuits, bus undervoltage circuits, and bus synchronizing and breaker control circuits. - Depending on construction work progress, either breaker test linkage will be used for EE-8 control circuit functional testing if the bus is energized or dead bus EE-8 control circuit functional testing will be performed if the bus is de-energized. After the bus is re-energized and functionally tested, final testing will be a motor rotational check per EE-9. Rotational checks per EE-9 will be coordinated with operations systems procedures. In those situations where system configuration precludes pump operation, unceupled motor runs will be performed, Startup functional testing should be adequate to satisfactorily post work test cable terminations as well as 4 ' demonstrate motor and switchgear operability. Surveillance testing to be performed during plant operational testing at a later date will substantiate startup functional testing and serve as a second check. In particular, the following surveillance tests will 'directly demonstrate 6.9KV bus operability as required by Technical Specifications. 1 EGT-766 6.9KV Safeguards Bus Power Supply Transfer and Response Time i Test, Train A EGT-767 6.9KV Safeguards Bu's Power Supply Transfer and Response Time Test, Train B ECT-770 Integrated Safety Injection / Blackout Test Train A ECT-771 Integrated Safety Injection / Blackout Test Train B g g e
- c, 1
not 'y TIM-870143 Fsbruary 16, 1987 .Page 2 As circuit design modification is not being performed, it has been recommended that startup prerequisite testing be used to post work test all 6.9KV switchgear work. PPF-164, "SSW/CCW Low Header Pressure Auto Start" " is the only outstanding design modification involving 6.9KV switchgear. Its implementation was in progress prior to the 6.9KV rework and will be independently tested per EGT-TP-86A-10 when Train A and B SSW and CCW i Systems are operable. From a 6.9KV switchgear rework point of view, l ,Results Engineering performance and test group involvement would be .f minimal. It is anticipated that Results Engineering immediate scope of 3.j - y involvement include: { sm.. .x o p'@ijid. k"dI - review of proposed startup prerequisite tests - special test issue resolution as required - coordination of EE-9 motor rotation checks with operation's integrated testing activities. If you have any questions, please contact Eric Blocher (ext. 5546) or Bill Winters (ext. 5504). L- . J. Nixon th$l ATI e WJN/BDW/EAB/jrh Distribution: R. A. Jones C. E. Scott M. R. Blevins B..B. Taylor S. L. Ellis D. A. London R. J. Scanlan ( Wr* J. R. Gray B. W. Wieland L., G. Barnes J. J. Allen R. D. Bird cc: PIMS
yyuvy vu W ~* k j b l; l I 6.9 Kv SWITCHGEAR RE-INSTALLATION . A. ' SCOPE OF WORK l .Following is the' list of activities, 'which include,. but are not limited to. carry out the re-installation of 6.9 Kv switchgear safety related & non-safety: SWITCHGEAR CUBILES: 1. Provide Alternate Power Source. ' Identify equipment which is critical or requires power for a. construction / operations. b. Identify alternative power source. c. Identify additional cables or equipment required. d. Prepare a list of shutdowns required is any, and coo-dinate for durations. Prepare Schedule for alternate power source. e. f, Prepare and issue travellers for the above work.
- g..
Provide porer per travellers. 2. Prepare drawing for-new installation. Coordinate for siesmic qualification with'other disciplines and obtain vendor review and approval. / 3. . Perform Cable Pull Calculations. 4. Remove circuit breakers and store in a dry area. 5. Remove Cables and Wiring. Prepare and issue travellers for removal of cables and wiring. s.- b. Disconnect all power cables following all safety precautions. Store cables properly. Check and test for any control power on external control wiring. c. Identify and disconnect other ends for such wires. d. Disconnect, tag, bundle, pull back and store all external control wiring properly. Disconnect, tag, bundle, pull back and' store properly all the e. control wiring'inbetween cubicles. 6. Secure Relays and other movable items on the Cubicles. 7. Free Cubicles of.all Attachments. a. Remove all conduits from cubicles. b. Remove all nuts, clamps holding cubicles down. 3. Provide covering and protection for internals before grinding, c. d. Grind, cut all weldings between cubicles and sills, e. F.emove all bolts between cubicles. l f. Remove, tag and store all bus bar connecting pieces. g. Stor all parts properly. HK-009/SV2/mcv. mm__-.-.. _ _ -., _ _ - - -
r-l' ,fyv' l I r. p 8. Install eyebolts and lif ting equipment to remove cubicles. 9. Prepare cubicle storage area. 10. Remove Cubicles one by one. (
- 11. Level Embedded Chcnnels.
a. Remove existing shims. b. Remove any other existing attachments on top of the channels. i c. Clean channels for any existing rust and debris. d. Provide new continuous plate, level all sills per vendor i recommendations. ] '12. Greut Floor. Grout floor level between the continuous plates added per 9cl a. to a minimum possible tolerances, but not more than +o, -1/16". { Refer to vendor recommendations. b. Check after grouting for correct level of the floor. 13. Repair cubicles a. Check cubicles for plumb. b. Repair cubicles and bring within tolerances. c. Check and correct any welding cracks in the cubicles, d. Paint any revelded area. Check, repair and paint any other surfaces requiring paint. e. 14. Install Cubicles. Install cubicles back on the new levelled base, check for plumb a. and other tolerances. b. Check for floor clearances, c. Bolt all cubicles with each other, d. Provide taxk welds. e. Recheck allignment. f. Put circuit breakers and check for any racking in problems. 15. Veld all enbieles as per approved drawing. 16. Install all Conduits.
- 17. Re-pull all cables.
- 18. Test and reconnect all internal and external wiring.
1
- 19. Test and connect all bus bars, i
20. Test & Connect all Power Cables. i HK-009/SW2/mcw
t + 1 c,/. .4 /.' CIRCUIT BREATERS: Work on circuit breakers een be carried out and coordinated simultaneously with' cubicles re-installation. 21. Replace Jackshafts with New Jackshafts on all Circuit Breakers as per Vendor Installation Procedure. 22. Check. Pawl Pin & Correct if necessary. 23. Check for close-latch anti-shock spring. Check if springs are already installed.Ser operating manual these are installed in the circuit breakers supplied. 'l l i I l l 4 J RK-009/SW2/ mew j 4 _ _ _ _ _ _ _ _ _ _ _ _ _ _._._._._}}