ML20238D761
| ML20238D761 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 09/02/1987 |
| From: | Warnick R NRC OFFICE OF SPECIAL PROJECTS |
| To: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20238D763 | List: |
| References | |
| NUDOCS 8709110379 | |
| Download: ML20238D761 (5) | |
See also: IR 05000445/1987011
Text
r.
t
"
, ,
'
,
SEP - 21987
In Reply Refer To:
Dockets:
50-445/87-11
50-446/87-09
,
i
TU Electric
I
ATTN:
Mr. W.
G. Counsil
!
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
)
1
Gentlemen:
This refers to the inspection conducted by Mr. I. Barnes and other
i
inspectors in the Comanche Peak Project Division during the period
June 5 through July 7, 1987, of~ activities authorized by NRC
Construction Permits CPPR-126 and CPPR-127=for the Comanche. Peak
l
Steam Electric Station, Units 1 and 2, and to the discussion of our
findings with you and other members of your staff at the conclusion
d
of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the
inspectors.
During this inspection, it was found that certain of your
activities were in violation of NRC requirements, as specified in
the enclosed Notice of Violation.
A written response to this
violation is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter, the enclosures, and your response to this
letter will be placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice
are not subject to the clearance procedures.of the. Office of
Management and Budget as required by the Paperwork Reduction Act of
1980, PL 96-511,
1
0709110379 870902
ADOCK 05000445.
j
Q
l
.
i
l
_ _ _ _ .
. _ _ _ _ _ _ _ _ _ _ _ _
___.._ _ _
.
.
,
TU Electric
2
'
SEP -21987
Should you have any questions concerning this inspection, we will
l
be pleased to discuss them with you.
l
Sincerely,
ORIGINAL SIGNED BY R. F. W7,P. NICK
R. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Special Projects
Enclosures:
Appendix A - Notice of Violation
Appendix B - Inspection Report 50-445/87-11; 50-446/87-09
cc w/ enclosures:
(See next page)
,
IP
IP ff;? '
IP h
IP: 4
AD:IP
OSP:
l
!P
.
CHals[
LEllershaw
WSmith
PWagner
IBarnes
RWarnick
9/p /87
9/p_/87
9/ 7-/87
9/2,/87
9/2 /87
9/
/87
_ _ _ _ _ - _ _ _ _ _ _ _
-___-_- - -
.
[.
'o
UNITED STATES
E'
'g
NUCLEAR REGULATORY COMMISSION
n
$
WASHitedTON, D. C. 20555
'% , . . #
SEP -21987
In Reply Refer To:
Dockets:
50-445/87-11
50-446/87-09
I
l
TU Electric
ATTN:
Mr. W.
G.
Counsil
Executive Vice President
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
(
Gentlemen:
This refers to the inspection conducted by Mr.
I. Barnes and other
inspectors in the Comanche Peak Project Division during the period
June 5 through July 7, 1987, of activities authorized by NRC
Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak
Steam Electric Station, Units 1 and 2, and to the discussion of our
findings with you and other members of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the
inspectors.
During this inspection, it was found that certain of your
activities were in violation of NRC requirements, as specified in
the enclosed Notice of Violation.
A written response to this
violation is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a
copy of this letter, the enclosures, and your response to this
letter will be placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice
are not subject to the clearance procedures of the Office of
Management and Budget as required by the Paperwork Reduction Act of
1980, PL 96-511.
1
l
'
,
'TU Electric
2
'
dEP - 2 IS07
-
l
l
l
Should you have any questions concerning this inspection, we will
be pleased to discuss them with you.
Sincerely,
[2 F U)O
R. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Special Projects
Enclosures:
Appendix A - Notice of Violation
Appendix B - Inspection Report 50-445/87-11; 50-446/87-09
j
cc w/ enclosures:
)
(See next page)
.
I
a.
- _ - _ -
.
~
' ' TU Electric
3
cc w/ enclosure:
TU Electric
Bureau of Radiation Control
ATTN:
G. S. Keeley, Manager
State of Texas-
Nuclear Licensing
1100 West 49th Street'
Skyway Tower
400 North Olive Street, L.B.81
Dallas, Texas
75201
Nancy H. Williams
CYGNA' Energy Services
Juanita Ellis
suite 390
President - CASE
2121 N. California Blvd
1426 South Polk Street
Walnut. Creek, CA
94596
Dallas, Texas
75224
Renea Hicks, Esq.
Assistant Attorney General
Environmental Protection Division
P.O. Box 12548, capitol Station
78711-2548
4
Administrative Judge Peter Bloch
U.S. Nuclear Regulatory Commission
Washington, D.C.
20555
Elizabeth B. Johnson
Administrative Judge
Oak Ridge National Laboratory
Post Office Box X, Building 3500
Oak Ridge, Tennessee
37830
Dr. Kenneth A. McCollom
1107 West Knapp
Stillwater, Oklahoma
74075
Dr. Walter H. Jordan
Administrative Judge
881 West Outer Drive
Oak Ridge, Tennessee
37830
Anthony Z. Roisman, Esq.
Suite 600
1401 New York Avenue, N.W.
Washington, D.C.
20005
Ms. Billie Pirner Garde, Esq.
Government Accountability Project
Midwest Office
104 East Wisconsin Avenue
Appleton, Wisconsin
54911
!:
i
l