| Site: | Vogtle |
| Issue date: | 12/23/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20238D134 | List: |
| References | |
| NUDOCS 8801040116 | |
| Download: ML20238D133 (2) | |
See also: IR 05000424/1987066
Text
- -
7
. . _ _ _ _ .
-
-.- - . - - . - - - _ _ _ _ . - - - - - - - - -
_ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,
.
.
-
.,
.
,
DEC 2 31987
t
Docket Nos. 50-424, 50-425
License Nos. NPF-68, CPPR-109
Georgia Power Company
ATTN:
Mr. James P. O'Reilly
Senior Vice President-
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-424/87-66 AND 50-425/87-47
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. A. Hallstrom on November 16-20, 1987. The inspection included a review of
~
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
I
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
DRIGINAL SIGNED By
Al.AN R. HERDT
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/ encl:
(See page 2)
}
I
8801040116 071223
ADOCK 05000424
0
IEc/
4
_
_ _ - _ _ _ .
_ _ _ _
._ _ _
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _
DEC g 0
-
1987
,
..
Georgia Power Company
2
.
cc w/ enc 1:
P. D. Rice, Vice President, Project
Director
y
C. W. Hayes, Vogtle Quality
Assurance Manager
,* G. Bockhold, Jr. , General Manager,
Nuclear Operations
' L. Gucwa, Manager, Nuclear Safety
and Licensing
J. A. Bailey, Project Licensing
i
Manager
'
'B. W. Churchill, Esq. , Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
l
D. Feig, Georgians Against
Nuclear Energy
bcc w/ encl:
I
E. Reis, OGC
,
M. Miller, NRR
'
M. Sinkule, RII
NDRS Technical Assistant.
NRC Resident Inspector
Document Control Desk
,
State of Georgia
e/
t
DI
R
kI
II
R I~
%'
L
\\
'
AdA allstrom:1b
, i}1 e
,fgMSi
ule
VL r *nlee
LRe
e
/1/2/lE/87
,/12/19/87
12 M /87
1/ /