ML20238D029

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-213/87-20 on 870720-24.No Violations Noted.Preparations for Outage Found to Be Well Planned & Radiation Protection Program Sound
ML20238D029
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/02/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20238D031 List:
References
NUDOCS 8709100522
Download: ML20238D029 (3)


See also: IR 05000213/1987020

Text

_ -- _ _ _ - -_ ___ - _

_ _ _ . _ _ _ _ _ - _ _ - - _ _ _ _ _ _ _ _ _ . - _ _ _ - - _ _

.'.

'4

SEP 0 2 1987

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101:

Gentlemen:

Subject: Inspection No. 50-213/87-20

A routine inspection of the radiation protection program at the Haddam Neck  ;

Station was conducted by Dr. S. Sherbini on July 20-24, 1987.. The inspection

focused on preparations for the current outage and radiological controls for

ongoing outage related work. Part of the inspection was also devoted to a

review of your program for the control of " hot particles", as well as a review

of'a personnel contamination incident that occurred on July 10, 1987.

Inspection findings were discussed with Mr. D. Miller.

Within the scope of this inspection, no violations were identified and no re-

sponse to this letter is. required. The preparations for the outage were found

to'have been well planned. The radiation protection program in place for the

outage was found to be sound. Our review found that additional action is-

needed to fully establish and implement a program for control of hot

particles. Specific items are discussed in the enclosed inspection report.

Your cooperation with us is appreciated.

Sincerely.

Or sinal Sig d By *

\ h '

Offt V

ThdmasT. Martin, Director

Division of Radiation Safet /

and Safeguards

Enclosure:

NRC Region I Inspection Report No. 50-213/87-20

0FFICIAL RECORD COPY

\

s7o9:00522 s70902 I

PDR ADOCK 05000213-

G- .PDR L

_ _ _ _ - _ - _ _ _ -

,___-. - _ _ - - . _ _ _ _ _ _ _ _ - -. . _ _ _ _ _ _ _ _ _ - _ - _ . _ _ - _ __

_ _ _ _ _ _ _ - _ _ _ - _ _ _ _ - - _ _ _ _ _ _ - _ _ -

.

Connecticut Yankee Atomic Power 2

Power.

cc w/ encl:-

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generating Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut

l

(

1

l

l

1

f

0FFICIAL RECORD COPY

___ _ _ - __ - -

_ _ _ _ _ _ - _ _ _ _ _ - _ _-

.

W 0 2 19g7

Connecticut Yankee Atomic Power

.

3

,

Company

bec w/ encl:

.

Region I Docket Room (with concurrences)

l ManagementAssistant,DRMA(w/oencl)

i

L DRP Section Chief

i T. Shedlosky, SRI, Millstone 1 & 2 1

'

j; T. Rebelowski, SRI, Millstone 3

1

J. Akstulewicz, LPM, NRR '

R. Bores, DRSS

l

l

l

l

l

.

t.1L 6

RI:DRSSANh d R:':DRSS

. RI: .SS

Sherbini/ejr RI:DRSSp& Bellamy

Shanaaky Mar 'n

ih;B'

98/I/87 S/.487' 8/ /87 q/i/87 ir ct. yank

0FFICIAL RECORD COPY