Forwards Insp Rept 99900886/87-01 on 870706-10 & Notices of Nonconformance & Violation.Allegation of Production Manager Removing Hold Tags from Nuclear Valves Not Substantiated. Response Containing Listed Items Requested in 30 Days
ML20238C810
Person / Time
Issue date: 09/09/1987
From: Merschoff E
Office of Nuclear Reactor Regulation
To: Arnold P
POSI-SEAL INTERNATIONAL, INC.
Shared Package
ML20238C811 List:
References
REF-QA-99900886 NUDOCS 8709100392
Download: ML20238C810 (5)


Text

/ %j UNITED STATES

. 2 o NUCLEAR REGULA. TORY COMMISSION

!; r j- WASHINGTON, D. C. 20555

\,...../

Docket No. 99900886/87-01 September 9, 1987 .

Posi-Seal International, Incorporated ATTN: Mr. Peter E. Arnold General llanager koute 49 and U.S. 95 North Stonington, Connecticut 06359 Gentlemen:

This letter addresses the inspection of your facility at North Stonington, Connecticut conducted by Mr. James T. Conway and Ms. Claudia Abbate of this office on July 6-10, 1987, and the discussions of their findings with

~

'Mr. Robert D. Barry and other members of your staff at the conclusion of the inspection.

The inspection was conducted as a result of an allegation pertaining to the removal of hold tags from nuclear valves by a production manager. The ailega-tion was not substantiated. Areas examined during the NRC inspection and our findings are discussed in the enclosed report. This inspection consisted of an examination of procedures and representative records, interviews with personnel, end observations by the inspector.

During this inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. Significant items included failur9s to: (1) pass 10 CFR Part 21 requirements on to vendors, (2) have complete qualification records for vendor NDE examiners, (3) review and a] prove vendor NDE procedures, (4) pass QA requirements on to vendors, and (5) lave a procedure /

instruction addressing a quality affecting activity. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

The enclosed Notice of Violation is sent to you pursuant to the provisions of -

Section 206 of the Energy Reorganization Act of 1974. You are required to submit to this office within 30 days from the date of this letter a written statement containing:

(1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; snd

+

C

-D

& 1 8709100392 870909 i PDR GA999 ENVPOSIS 99900086 PDR

- Posi-Scal International, Incorporated September 9, 1987 ..

(5) the dates your corrective actions and preventive measures were or will be completed. We will consider extending the response time if you-can show -

good csuse for us to do so.

You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance. The responses requested by this letter are not subject to the clearance procedures of the Office of lianagement and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

~

to discuss them with you.

Sincerely, 6

Ellis W. Merscho Vendor Inspecti

, Chief Branch i

Division of R ctor Inspection and Safeguards Office of Nuc ear Reactor Regulation

Enclosures:

1. Appendix A-Notice of Violation
2. Appendix B-Notice of Nonconformance
3. Appendix C-Inspection Report No. 99900886/87-01 l

cc: Arizona Public Service Company -

Attn: tir. E. E. Van Brunt, Jr.

Executive President Arizona Nuclear Power Plant P.O. Box S2034 Pheonix, Arizona 85072-2034

+

+

'Posi-Seal International,.

Incorporated' September 9, 1987-(3) the dates your corrective actions and preventive' measures were or will be

. completed. We will consider extending the response time if you can show good cause for us to do so.

You are also requested to submit a similar written statement for each item which appears in the enclosed Hotice of Nonconformance. The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction.Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of-this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.-

Should you have any questions concerning this inspection, we will be pleased to discuss thera with you.

Sincerely, Original Signed by Ellis W. Merschoff Ellis W. Merschoff Chief Vendor Inspection Branch Division of Reactor Inspection and Safeguards-Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A-Hotice of Violation
2. Appendix B-Notice of Nonconformance
3. Appendix C-Inspection Report No. 99900886/87-01 cc: Arizona Public Company DISTRIBUTION:

GH15 VIB Reading Code IE:09 i (

DRIS Reading \

JPartlow BGrimes EMerschoff JStone JConway (2)

LParker JPetrosino (IE-67-A-0005)

RBrady (IE-87-A-0005) P433 ASME UJ If IL V d C3 MLicitra

  • See previous page for concurrences.'b. O.2 0FC. :VIB DRIS :5C/Vlb:DRIS :ASC/VIB:DRIS:  : :  :

NAME.:JConway:tt* :JStone* :EMerschoff* :  : :  :

~

DATE :08/27/87 :08/19/87 :09/02/87  :  : :  :

s i

5 l

i ES 6 V 01 d3S L8bt i 9

S0-08NSO  ;

eg 4

)

I i

9 Posi-Seal International, Incorporated September 9, 1987 (3) the dates your corrective' actions and preventive measures were'or will be completed. We will consider extending the response time if yousan show -

good cause for us to do so.

You are also requested to submit a similar written statement for each item which appears in the enclosed Notice of Nonconformance. The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

~

Should you have any questions concerning this inspection, we will be pleased to discuss thera with you.

Sincerely, Original Signed by Ellis W. Merschoff y- Ellis W. Merschoff, Chief  ;

Vendor Inspection Branch Division of Reactor Inspection and Safeguards j Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A-Notice of Violation
2. Appendix B-Notice of Nonconformance
3. Appendix C-Inspection Report No. 99900886/87-01 cc: Arizona Public Company -

DISTRlbOTION:

RIDS Code IE:09 Vlb Reading DRIS Reading JPartlow BGrimes (

EMerschoff 4 JStone JConway (2)

LParker JPetrosino (IE-67-A-0005)

RBrady (IE-87-A-0005) P433 <

ASME , j HLicitra j

  • See previous page for concurrences.  !

UFC :VID:DRIS :5C/VIb:DRIS :ABC/VIB:DRI5:  :  :  :  ;

.....:...............:.............:............:............:............:............:........ 1

.NAME :JConway:tt* :JStone* :EMerschoff* :  :  :  :

DATE :08/27/87 :08/19/87 :09/02/87  :  :  :  :

- _ _ _ _ _ _ _ _ _ _ - _ _ _ -