Text
_ - _ - _ _ - - _ - _ _ _ _ _
'/
o,,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION n
5 E
WASHINGTON, D. C. 20555
/
September 8, 1987 Docket No. 99901094/87-01 Satin American Corporation ATTN: Mr. Joseph Satin President Post Office Box 619 40 Oliver Terrace Shelton, Connecticut 06484 Gentlemen:
This letter addresses the inspection of your facility at Shelton, Connecticut conducted by Mr. J. Jacobson and Mr. R. McIntyre of this office on July 6-8, 1987, and the discussions of their findings with you and other members of your staff at the conclusion of the inspection.
The inspection was conducted to review records pertaining to your supply of safety-related equipment to various nuclear power plants and to review your quality assurance program. Areas examined during the NRC inspection and our findings are discussed in the enclosed report. This inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection, it was found that the implementation of your QA program failed to meet certain NRC requirements. Specifically, findings in the areas of control of special processes and in control of purchased material were identified.
The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within 30 days from the date of this letter a written statement containing:
N (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the dates your corrective actions and preventive measures were or will be completed. We will consider extending the response time if you can show good cause for us to do so.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this -
letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
JEo7
/[/
8709100206 B PDR GA999 E 99901094 P
'.J..
l Satin'American Corporation September 8, 1987 i
Should you have any questions concerning this inspection, we will be pleased to discuss this with you.
Sincerely, Ellis W. Hersch
, Chief Vendor Inspect n Branch Division of. Reactor Inspection and Safeguards Office of Nuclear Reactor Regulation
Enclosures:
1.
Appendix A-Notice of Nonconformance 2..
Appendix B-Inspection Report No.
99901094/87-01 cc: Alabama Power Company Attn: Mr. R. P. Mcdonald Senior Vice President Post Office Box 2641 Birmingham, Alabama 35291 Consolidated Edison Company of New York, Inc.
Attn: lir. John D. O'Toole Vice President, Nuclear Engineering and Quality Assurance 4 Irving Place New York, New York 10003 Maine Yankee Atomic Power Company Attn: Mr. John B. Rondazza Executive Vice President 83 Edison Drive Augusta, Maine 04336
3 __
<i
- 1* '
Satin American Corporation-september 8, 1987 E
i'
-DISTRUBTION:
RIUS Code IE:09 VIB Reading
)
'DRIS Reading
.JPartlow 1
BGrimes EMerschoff UPotapovs JJacobson RMcIntyre-LParker-SRI Farley, Bradford
' SRI' Maine Yankee, Holden SRI Indian Point 2, Koltay I-RI Farley, Miller RI Maine Yankee, Fruedenberger RI Indian. Point 2, Kelley PM Farley, Reeves Pil Haine Yankee, Sears PM Indian Point, Slosson 0FC :VIB:DRIS
- 5C/VIb:hRIS :ABC/V
- DRIS:
i
:--------------:---- g(------:-- - hoff NAME :JJacobson:tt :UPota s avs
,-----:--------------:9/(/87
- 4 / 4/87 DATE : f// / /87
_.-N.--__--.-.
Satin American Corporation September 8, 1987 DI}TRUBTION:
vRIDSCodeIE:09\\\\
l VIB Reading DRIS Reading JPartlow BGrimes EMerschoff UPotapovs JJacobson RMcIntyre LParker SRI Farley, Bradford SRI Maine Yankee, Holden SRI Indian Point 2, Koltay RI Farley, Miller RI Maine Yankee, Fruedenberger RI Indian Point 2, Kelley PM Farley, Reeves PM Maine Yankee, Sears PM Indian Point, Slosson DFC :VIB:DRIS
- 5C/Vlb:hRIS :ABC/V :DR15:
:--------------:----(( f------:--
hoff :
NAME :JJacobson:tt
:------------. "!JPotasivs 2.----.
DATE : 4/ / /87 1 1 / (/87
- 4 / C/87
_