Forwards Analysis for FY88 Annual Fee (10CFR171) for Nuclear Power Plants W/Ols Ref in 870828 Fr at 52FR32625 & 52FR32626 to Be Placed in PDR
ML20238B465
Person / Time
Issue date: 09/04/1987
From: Johnson G
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
To: Skoczlas J
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
FRN-52FR32625, FRN-52FR32626, RULE-PR-171 NUDOCS 8709090649
Download: ML20238B465 (11)


Text

- _ _ _ _ _ _ _ -

  1. (

pf)h

/

UNITED STATES f,8 NUCLEAR RE!ULATORY COMMISSION g

WASDHNGTON, D. C. 20005 g

%.....+!

SEP 041987 i

MEMORANDUM FOR: John A. Skoczlas, Acting Chief Document Control Branch Division of Infonnation Support Services, ARM FROM:

Graham D. Johnson, Director Division of Accounting and Finance, ARM

SUBJECT:

PUBLIC'00CUMENT ROOM COPY OF ANALYSIS USED FOR DETERMINING THE PART 171 FY 1988 ANNUAL FEES FOR NUCLEAR POWER PLANTS WITH OPERATING LICENSES Enclosed are two sets of the subject analysis which is referred to in the August 28, 1987 Federal Register on pages 32625 and 32626. Please promptly send one copy by special messenger to the Public Document Room (PDR) at 1717 H Street, N.W., since its availability in the PDR was cited in'the Federal Register of August 28, 1987.

It should be accompanied by a note requesting that the PDR staff make the data immediately available for the general public and in a location they would normally find daily documents. The second copy is being provided to be processed in the normal manner through the DCS.

Thank you for your assistance in this matter.

I l

v _ kb _

Graham D. Johncon, irector Division of Accounting and Finance J

Office of Administration and Resources Management Enclosure Two Copies of Analysis to i

Support FY 1988 10 CFR 171 Annual Fee Amount cc w/ enc 1:

T. Rothschild, OGC R. Smith, OGC L. Hiller, ARM /FMC

]

R. Scroggins, ARM /FMC

]

90 49 870904 171 52Fn:mA25 PDR C # '~lf

-y

.e.

.I' ANALYSIS FOR FY 1988 ANNUAL FEE (10 CFR 171)

FOR NUCLEAR POWER PLANTS WITH OPERATING LICENSES AS REFERRED TO IN THE FEDERAL REGISTER DATED AUGUST 28, 1987, AT 52 FR 32625 AND 32626 I

l Analysis of Part 171 Under current statute the NRC is to collect, for the General Fund of the Treasury, an amount up to 33 percent of the bedget.

In FY 1988 the President's budget for the NRC is $427.8 million.

Thus, the NRC should attempt to collect approximately $141 million for FY 1988.

It is estimated that approximately 4

$38 million will be collected from specific licensees under Part 170, but the remaining' funds, $103 million, will need to be collected under Part 171.

For

~

FY 1988, NRC's budget indicates that it will obligate about $149 million in obligations for generic work on behalf of all plants (and over $166 million for all generic work).

Since the 33 percent limit is still in effect, each of the 110 plants with an operating license and a rated thermal capacity in excess of 50,000,000 watts will be billed approximately $9'o thousand, ir. four quarterly invoices, during FY 1988.

For FY 1988 the budgeted obligations by direct program are:

(1) Salaries and Benefits, $183.4 million; (2) Program Support, $168.76 million; (3) Administra-tive Support, $65.14 million; and (4) Travel, $10.5 million.

In FY 1988, 1,613 FTE's are considered to be in direct support of NRC programs applicable to fees (see Table 1).

Of this amount, about 355 FTE's are identified to efforts defined as being in Part 171 for all plants, with the remainder being utilized in efforts associated with other generic activities, Part 170, or High-Level Waste.

Out of 3,250 FTE's, 1,637 FTE's will be considered in an administrative, overhead, or exempted program function.

Thus, only about 50 percent (the 1,613 direct FTE's) 1 of NRC's staff are being allocated to specific licensee or generic (or multi-licensee) issues.

A system which would allocate NRC costs of "doing business" to the licensee (s), for whom NRC is expending this effort, would establish fees based upon all of NRC's costs to pay for or support these 1,613 FTE's.

I l

Using this approach, and excluding Program Support funds, the remaining $259 million allocated uniformly over the direct FTE's results in a calculation of-

$160 thousand per FTE, as shown in Table II.

TABLE I Direct FTE's By Office Office Number of Direct FTE's*

NRR 943.0 Research 162.8 NMSS 294.2 AEOD 92.0 ASLAP 6.9 ALSBP 19.2 ACRS 25.2 OGC 69.7 1,613.0

  • Regional employees are counted in the office of the program each supports.

TABLE II FY 1988 Budget By Direct Program j

($ In Millions) j t

Direct Program FY 1988

]

Salaries and Benefits

$183.4 Administrative Support 65.14 Travel 10.5 Total

$259.04 i

Non Program Support Costs

$259.04

$.16 Direct FTE 1,613 NRC Costs

$160 Thousand Per Direct FTE l

(or $92 per productive hour) i L___________

.t

, Since Part 171 is designed to collect fees for NRC efforts of a generic or multi-license nature concerning licensees with power reactor operating licenses, the most feasible method to accomplish this is to develop fees based on NRC budgeted obligations for each NRC generic or multi-licensee program concerning plants with operating licenses.

The following analysis presents NRC's budgeted obligations per program element / activity.

.)

i i

t i

Detail Part 171 Analysis

($000)

FY 1988 Program Support $

FTE I.

Part 171 Work for All Plants A.

Part 171 Work by Research (Program Element / Activity) 1.

Reactor Vessel and Piping Integrity

$ 12,350

5. 0 2.

Aging of Reactor Components 10,350 12.0 3.

Reactor Equipment Qualifications 1,300 1.5 4.

Seismic and Fire Protection Research (less Earth Sciences $3,990/3.0 FTE) 5,960 4.5 5.

Plant Performance a.

Basic Studies 1,600 1.8 b.

Development and Assessment of Codes (less GE plants only ($750) 3,980 3.6 6.

Human Performance 2,630 3.6 7.

Reliability of Reactor Systems 3,920 4.9 8.

Radionuclides Source Terms 1,904 2.0 9.

Reactor Containment Safety (less GE only -

($1,150/.8 FTE) 16,423 9.7 10.

Reactor Accident Risk Analysis (less Reviews of PRA's $1,100/3.0 FTE's) 7,518 10.0 11.

Severe Accident Program Implementation 1,450 7.2 12.

Radiation Protection and Health Effects 1,625 6.5 13.

Generic and Unresolved Safety Issues (less Reactor Systems Issues - GE only - $250) 5,215 33.7 14.

Developing and Improving Regulations 2,975 12.0 Total Part 171 Work by Research

$ 79,200 118.0

e

..t a.

Part'171 Analysis

($000)

FY 1988 Program Support $

FTE I.

Part 171 Work for All' Plants

.B..

Part'171 Work by NRR (Program Element / Activity)

1. -Reactor Performance Evaluation
a. - Generic Communications 300
7. 8 -

b.

Engineering / Safety. Assessments 875 6.' 7

c., Reactor Maintenance and Surveillance 100
2. 7 '

2.

Licensee Performance Evaluation Quality. Assurance Program-50 8.1

'3' License:and Examine. Reactor Operations

a. ' Generic Activities 0

3.0 b.

Program. Development and Assessment /

Regional' Oversight 180

-8.0 4.

Region-Based Inspections.

a. 1 Lab and-Technical Support 105 10.6 b.'

LRegional: Assessment 0-

1. 6 s n
5. :< Specialized Inspections Vendor Inspections.

1,160 17.5 6.

Project Management a.,

Project Engineers 0

20.2-b.

Licensing Assistants 0

15.1

7. ' Regulatory Improvements a.. Technical Specifications 100 11.5

'b.

Safety Goal: Implementation 0

.4

c. -Inspection / Licensing Integration and

'i Research and: Standards Coordination 0

21.7 j

1 8.

Licensee Reactor Accident Management Evaluation a.

Concept of Operations and Implementing Tech.. Proc.

0 1.0 4

b.

Regional Assistance Committees 0

2.0 9.

Safeguards. Licensing and Inspection

. Regulatory Effectiveness Reviews 490 7.0 Total Part 171 Work by NRR

$ 3,360 144.9 l

1 I

L-_

a a

e s a

?

}

f%- -

.l

.1 w

~

l Part 171 Analysis

($000)

-4 y

~ ',.

'FYlb88-i If;

  • Program Support $:

FTE

' I.

Part-.171 Work for'A11 Plants a

C.

Part 171 Work'by AE00 (Program Elements) 228 4.0 l.

Performance Indicators 2.

Diagnostic Evaluations ~

0

6.5-1 3..

Incident; Investigation 50-

.- 2. 5 -

4.-

NRC. Incident Response

'2,480 27.0

5. ' Technical Training Center 2,102

'21.0 4 s 6.-

0perationa1 Data Analysis 2,355

=25.0

'7.:

Operational Data Collection and' Dissemination 2,435 6.0 3

-Total Part 171 Work by AE0D

$ 9,650 92.0 D.../ Total NRC for All Plants

.: 1.l Cost'forlAEOD~ Staff 92 x.160 =

$.14,720

=

Program = Support AEOD 9,650

Total AE00 Cost

$ 24,370

$ 23,184 2.

Cost for NRR Staff = 144.9 x 160

=

Program' Support NRR 3,360 Total NRR Cost

$ 26,544 3.

Cost.for Research Staff '

118.0.x 160

$ 18,880

=

=

Program Support Research

. _79,200 Total Research Cost

$ 98,080 4.

Total (All Plants) Cost to NRC

$148,994 l,'

r l

L c

M c

Nuclear Power Reactor tinits with An Operating License As of August 31, 1987*'

l i

l Plant Name Plant Name Plant Name l

l 1.

Arkansas 1 37.

Grand Gulf l~

73.

Point Beach 2 2.

Arkansas 2 38.

Haddam Neck 74.

Prairie Island 1 3.

Beaver Valley 1 39.

Harris 1 75.

Prairie Island 2 4.

Beaver Valley 2 40.

Hatch 1 76.

Quad Cities l' 5.

Big Rock Point 41.

Hatch 2 77.

Quad Cities 2 6.

Braidwood 1 42.

Hope Creek 1 78.

Rancho Seco 7.

Browns Ferry 1 43.

Inriian Point 2 79.

River Bend 1 1

8.

Browns Ferry 2 44.

Indian Point 3 80.

Robinson 2-l 9.

Browns Ferry 3 45.

Kewaunee 81.

Salem 1

10. Brunswick 1 46.

La Salle 1 82.

Salem 2

11. Brunswick 2 47.

La Salle 2 83.

San Onofre 1

12. Byron 1 48 -,

Limerick 1 84.

San Onofre 2

13. Byron 2 49.

Maine Yankee 85.

San Onofre 3

14. Callaway 1 50.

McGuire 1 86.

Seabrook 1 1

15. Calvert Cliffs 1 51.

McGuire 2 87.

Sequoyah 1

16. Calvert Cliffs 2 52.

Millstone 1 88.

Sequoyah 2

17. Catawba 1 53.

Millstone 2 89.

Shoreham

18. Catawba 2 54.

Millstone 3 90.

St. Lucie 1

19. Clinton 1 55.

Monticello 91.

St. Lucie 2 20.

Cook 1 56.

Nine Mile Pt. 1 92.

Summer 1

21. Cook 2-57.

Nine Mile Pt. 2 93.

Surry 1

22. Cooper 58.

North Anna 1 94.

Surry 2 23.

Crystal River 59.

North Anna 2 95.

Susquehanna 1

24. Davis Besse 1 60.

Ocoree 1 96.

Susquehanna 2 25.

Diablo Canyon 1 61.

Oconee 2 97.

TMI-1

26. Diablo Canyon 2 62.

Oconee 3 98.

TMI-2

~2 7. Dresden 2 63.

Dyster Creek 1 99.

Trojan

28. Dresden 3 64.

Paiisades 100.

Turkey Pt. 3 29.

Duane Arnold 65.

Palo Verde 1 101.

Turkey Pt. 4

30. Farley 1
66.. Palo Verde 2 102.

Vermont Yankee

31. Farley 2 67.

Palo Verde 3 103.

Vogtle 1

32. Fermi 2 68.

Peach Bottom 2 104.

Waterford 3

33. FitzPatrick 69.'

Peach Bottom 3 105.

WNP-2

34. Fort Calhoun 70.

Perry 1 106.

Wolf Creek 1 35.

Fort St. Vrain 71.

Pilgrim 1 1;.7.

Yankee Rowe

36. Ginna

'72.

Point Beach 1 108.

21on l' 109.

Zion 2 110.

South Texas 1 i

  • 0n August 21, 1987, the South Texas Unit No.1 license was issued for 5%

operation. No additional new licenses are scheduled to be issued for the balance of August 1987 or even to the end of FY 1987 (September 30,1987),

j j

<=mww:

r,..

w.x, Y0' Annual Fee For Licensed Operating ' Reactors g.

.'The annual fee for each' nuclear' power reactor licensed to operate sr 9is $936,000.

The annual fee.is calculated as follows:

$427,800,000 NRC'FY 1988 President's Budget

'(NUREG-1100 Vol. 3)-

i-lj

.x33%

Percent of budget recovery required (P.L.

f 99-272)'-

- $141 million L Amount of FY 1988 recovery rounded down to nearest million i

Less' 38 million' Estimated FY 1988 collections (10 CFR 170)

$103 niillion Estiniated FY 1988 collections (10 CFR.171)

L Divided by 110 licensed reactc?:

Equals

-$936,000

. Annual fee' per: licensed reactor (rounded.down to yp nearest thousand)'

i 1

s e'

lh '

?

e I

- a

T FY 1988 Estimated Collections / Billings Part 170 6/20/84 Revised Schedule Estinate as of 7/31/87

($ In Millions)

Facilities Program Power Reactors - Licensed Plants FY88 Estimate Amendments

$ 5.0 3

Part 55 Exams 4.0 22.0 Inspection Subtotal Licensed Plants 5 31.0 Applications (0L's Under Review) 2.0 Special Projects (Topicals) 1.0 Total facilities Program $ 34.0 3'

Materials Program 2.0 Licensing 2.0 Inspection Total Materials Program 5 4.0 Total fY 1988 Estimate

$ 38.0 l

YE l

_ _ _ _