ML20238B459
| ML20238B459 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 08/28/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML20238B462 | List: |
| References | |
| EA-87-167, NUDOCS 8709010231 | |
| Download: ML20238B459 (3) | |
See also: IR 05000267/1987017
Text
. _ _ .
,
e
AUG S 81987
'
I
i
In Reply Refer To:
i
Docket:
50-267/87-17
EA 87-167
l
J
Public Service Company of Colorsdo
{
ATTN:
Robert 0. Williams, Jr.
(
Vice President, Nuclear
j
Operations
P. O. Box 840
Denver, Colorado
80201
i
Gentlemen:
This refers to the inspection conducted by Messrs. R. E. Farrell, P. W. Michaud,
E. A. Plettner, and M. E. Skow of this office during the period July 1-31, 1987,
of activities authorized by NRC Operating License DPR-34 for Fort St. Vrain
Nuclear Generating Station, and to the discussion of our findings with you and
other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included followup of licensee action on
i
previously identified inspection findings, operational safety verification, ESF
system walkdown, monthly surveillance observation, monthly maintenance observa-
'
tion, security, radiological protection and design control.
Within these areas,
the inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors. The
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities appeared to
be in violation of NRC requirements. As discussed in our telephone conversation
of August 18, 1987, with your staff, we have scheduled an enforcement conference
f
in our office at 1 p.m. on September 10, 1987, to discuss your understanding of
'
these violations, the reasons for occurrence, and your corrective actions. We
will also discuss the NRC Enforcement Policy, if appropriate. An agenda for
j
this meeting is enclosed.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraphs 2 and 3 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8709010231 870028
Original Signed Cy
ADOCK 0500
7
J. E. Gad!ardo
0
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next page)
RIV: SRIf8
RI W/
PIf/g/
C:hB/A
E0 DI
C:RPB,
4 REFarrell/tw pPWMichaud
MESkow
JPJaudon
DAPowers
JEGagt a do
k
0
tr/W/87
tr/ay /87
r/u/87
g M/87
y/jg/87
3/y)/ 7
t\\\\
,
_
.
. . .
. .
.
..
.
.
..
.
___________ _ ___ ,
.k
j
.
Public Service Company of Colorado
-2-
i
Enclosures:
1.
Appendix A - NRC Inspection Report
50-267/87-17
2.
Appendix B - Meeting Agenda
cc w/ enclosures:
Manager, Nuclear
,
Production Division
l
Fort St. Vrain Nuclear Generating Station
i
16805 WCR 19 1/2
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
(Same Address)
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bec to DMB (IE01)
bcc distrib. by RIV:
- RPB
R. D. Martin, RA
i
- RRI
DRSP
- Section Chief (RPB/A)
- RIV File
!
- Section Chief (RSB/ES)
- R&SPB
- RSTS OPERATOR
- MIS System
- RSB
- Project Inspector
- D. Weiss, RM/ALF
- R. Hall
,
I
- Enforcement Officer
l
l
- w/766
1
i
k]] Eb -i V U 3d
.
.,7
e-
.