ML20238B145
| ML20238B145 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/24/1987 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20238B149 | List: |
| References | |
| IEB-84-03, IEB-84-3, NUDOCS 8709010092 | |
| Download: ML20238B145 (22) | |
See also: IR 05000245/1987012
Text
_
__
.
AUG 241987
!
9
,
t
( i
Docket No. 50-245
,
Northeast Nuclear Energy Company
ATTN: Mr. Edward J. Mroczka
Senior Vice President - Nuclear
l
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut
06141-0270
l
I
Gentlemen:
!
Subject:
Routine Inspection 50-245/87-12 (6/23/87 to 8/10/87)
This transmits the report of the above subject inspection of Millstone Unit 1 by
Mr. G. Grant of this office. The inspection findings have been discussed with
Mr. S. Scace of your staff. No violations were identified,
As Detail 4.4 of the enclosed report notes, we found your initial acti?ns in
response to IE Bulletin 84-03 to be conservative, well-engineered, and timely.
It appears, however, that you have not identified to the NRC the additional
follow-up action to which you committed.
Incident to that, it also appears
1
that you have not provided formal instructions to the operators on the actions
to be taken if fuel is being moved and the refueling cavity water levn1
decreases significantly. Although we recognize that failure of the ' metal
bellows seal at Millstone 1 is far less likely than failure of a pneumatic
3
seal, we are concerned about the apparent lack of follow-up on commitments you
.
made in 1984 on this matter.
Therefore, please reply in writing to this letter
l
within 30 days of its receipt, stating the reasons for not identifying 'your
'
corrective actions, your present plans to complete them, and your plans'to
assure that such commitments are carried out in the future.
We have received your June 25, 1987 reply to two Violations for untimely sub-
mittals of amendment requests. These submittals addressed primary containment
isolation valves (TS Table 3.7.1) and hydraulic and mechanical snubber lists (TS
Tables 3.6.1.a and 3.6.1.b).
This inspection report reviews these issues in Sec-
tions 4 and 7.
In addition, we note your assessment of the generic timeliness
problem and your proposed corrective actions. We found your actions responsive
to our concerns, and we will further evaluate the long term trend of this issue
during routine inspections.
l
We also received your July 17, 1987 letter on corrective actions on reactor trips
l
attributed to the reactor pressure control system.
The improvements in operating
'
procedure guidance, operator requalification training, MPR/EPR practice transfers,
MPR/EPR modification investigation, MPR overhaul, and human factors redesign of
various MPR/EPR control board indications are responsive to our concerns.
8709010092 870024
ADOCK 05000245
G
OFFICIAL RECORD COPY
DL50-245/87-12 - 0001.0.0 j
08/21/87
-- -
1
'
e
__
- - -
y
I
i
e
1
Northeast Nuclear Energy Company
2
l
AUG 241987
-
.Thank you for your cooperation.
l
Sincerely,
1
OriS nal616"80BY'
i
Edward C. Wenzinger, Chief
'
Projects Branch No. 3
'
l
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report No. 50-245/87-12
l
cc w/ encl:
W. Romberg, Vice President, Nuclear Operations
S, Scace, Station Superintendent
D. Nordquist, Managdr of Quality Assurance
R. Kacich, Manager,. Generation Facilities Licensing
i
Gerald Garfield, Esquire
j
Public Document Room (POR)
,
Local Public Docum' cot Room (LPDR)
Nuclear Safety,Information Center (NSIC)
NPC Resident Inspector
State of Connecticut
t
l
bcc w/ encl:
i
Region I Docket Room (with concurrences)
l
Management Assistant, DRMA (w/o encl)
!
Eaction Chief, DRP
l
l
C. Anderson, DRS
l
R. Keimig, DRSS
I
M. Shanbaky, DRSS
l
J. Shediosky, SRI, Haddam Neck
l
W. Raymond, SRI, Millstone 3
i
l
M. Boyle, LPM, NRR
l
t
R. Bores, DRSS
D. Holody, RI
J. Strosnider, DRS
j
\\
RI:DRP .
RI:DRP
RI:DRP
RI:DRP
b'
@A
6A
Gra@n t./meoCon,ner
McCabe
Wenzi er
8/10/87
We
rho
ght
]
0FFICIAL RECORD COPY
1
1
,
m