Forwards Insp Rept 50-245/87-12 on 870623-0810.No Violations Noted.Initial Action in Response to IE Bulletin 84-03 conservative,well-engineered & Timely.Responses to Violations Responsive to NRC Concerns
ML20238B145
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/24/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20238B149 List:
References
IEB-84-03, IEB-84-3, NUDOCS 8709010092
Download: ML20238B145 (22)


See also: IR 05000245/1987012

Text

_

__

.

AUG 241987

!

9

,

t

( i

Docket No. 50-245

,

Northeast Nuclear Energy Company

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

l

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut

06141-0270

l

I

Gentlemen:

!

Subject:

Routine Inspection 50-245/87-12 (6/23/87 to 8/10/87)

This transmits the report of the above subject inspection of Millstone Unit 1 by

Mr. G. Grant of this office. The inspection findings have been discussed with

Mr. S. Scace of your staff. No violations were identified,

As Detail 4.4 of the enclosed report notes, we found your initial acti?ns in

response to IE Bulletin 84-03 to be conservative, well-engineered, and timely.

It appears, however, that you have not identified to the NRC the additional

follow-up action to which you committed.

Incident to that, it also appears

1

that you have not provided formal instructions to the operators on the actions

to be taken if fuel is being moved and the refueling cavity water levn1

decreases significantly. Although we recognize that failure of the ' metal

bellows seal at Millstone 1 is far less likely than failure of a pneumatic

3

seal, we are concerned about the apparent lack of follow-up on commitments you

.

made in 1984 on this matter.

Therefore, please reply in writing to this letter

l

within 30 days of its receipt, stating the reasons for not identifying 'your

'

corrective actions, your present plans to complete them, and your plans'to

assure that such commitments are carried out in the future.

We have received your June 25, 1987 reply to two Violations for untimely sub-

mittals of amendment requests. These submittals addressed primary containment

isolation valves (TS Table 3.7.1) and hydraulic and mechanical snubber lists (TS

Tables 3.6.1.a and 3.6.1.b).

This inspection report reviews these issues in Sec-

tions 4 and 7.

In addition, we note your assessment of the generic timeliness

problem and your proposed corrective actions. We found your actions responsive

to our concerns, and we will further evaluate the long term trend of this issue

during routine inspections.

l

We also received your July 17, 1987 letter on corrective actions on reactor trips

l

attributed to the reactor pressure control system.

The improvements in operating

'

procedure guidance, operator requalification training, MPR/EPR practice transfers,

MPR/EPR modification investigation, MPR overhaul, and human factors redesign of

various MPR/EPR control board indications are responsive to our concerns.

8709010092 870024

PDR

ADOCK 05000245

G

PDR

OFFICIAL RECORD COPY

DL50-245/87-12 - 0001.0.0 j

08/21/87

-- -

1

'

e

__

- - -

y

I

i

e

1

Northeast Nuclear Energy Company

2

l

AUG 241987

-

.Thank you for your cooperation.

l

Sincerely,

1

OriS nal616"80BY'

i

Edward C. Wenzinger, Chief

'

Projects Branch No. 3

'

l

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-245/87-12

l

cc w/ encl:

W. Romberg, Vice President, Nuclear Operations

S, Scace, Station Superintendent

D. Nordquist, Managdr of Quality Assurance

R. Kacich, Manager,. Generation Facilities Licensing

i

Gerald Garfield, Esquire

j

Public Document Room (POR)

,

Local Public Docum' cot Room (LPDR)

Nuclear Safety,Information Center (NSIC)

NPC Resident Inspector

State of Connecticut

t

l

bcc w/ encl:

i

Region I Docket Room (with concurrences)

l

Management Assistant, DRMA (w/o encl)

!

Eaction Chief, DRP

l

l

C. Anderson, DRS

l

R. Keimig, DRSS

I

M. Shanbaky, DRSS

l

J. Shediosky, SRI, Haddam Neck

l

W. Raymond, SRI, Millstone 3

i

l

M. Boyle, LPM, NRR

l

t

R. Bores, DRSS

D. Holody, RI

J. Strosnider, DRS

j

\\

RI:DRP .

RI:DRP

RI:DRP

RI:DRP

b'

@A

6A

Gra@n t./meoCon,ner

McCabe

Wenzi er

8/10/87

We

rho

ght

]

0FFICIAL RECORD COPY

1

1

,

m