Text
......
September 1,1987 Docket No.:
50-245 Mr. Edward J. Mroczka Senior Vice President
' Nuclear Engineering and Operations Northeast Nuclear Engineering Company Post Office Box 270
> Hartford, Connecticut 06141 0270
Dear Mr. Mroczka:
I
SUBJECT:
MAINTENANCE RESPONSIBILITY FOR SWITCHYARD BATTERIES - TECHNICAL SPECIFICATION CHANGE (TAC 64476)
Re: Millstone Nuclear Power Station, Unit No. 1 The Commission has issued the enclosed Amendment No. 10 to Facility Operating License No. DPR-21 for the Millstone Nuclear Power Station, Unit No. 1.
This amendment is in response to your application dated January 21, 1987. This amendment removes reference to switchyard batteries from technical specification (TS) sections 3.9.A.5, 4.9.B.2, and 4.9.D.
The staff concurs that the maintenance responsibility for the switchyard batteries belongs with the New London Substation Maintenance Department.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely,
/C/
Cecil 0. Thomas, Director
/ CL[(
Integrated Safety Assessment j
Project Directorate Division of Reactor Projects - III, IV, V and Special Projec
Enclosures:
DISTRIBUTION 1.
Amendment No. 10 to DocketnfilepF ISAPD RF DHagan License No. DPR-21 NRC & Local PDR -
JPartlow TBarnhart(4) 2.
Safety Evaluation DCrutchfield Wanda Jones EButcher FSchroeder DEubicki ACRS (10) cc w/ enclosures:
CThomas GPA/PA ARM /LFMB See next page MBoyle EJordan TAC #64476 B709090449 070901 MShuttleworth DR ADOCK 05000, S 0 C-Bethesd 0FC:
ISAPD ISAPD OQC D:15APD
~
" "~
"~
'khE [hBoy5 '
kSiS~ttkI N............................_.... b.
DATE:08/f/87 08// 9/87 0
(/87 BJP// /87 0FF CIAL RECORD COPY h g o g w c [.b
[ht Nf' _wgi 05?
M r%ym Cf y;f,,Q,g,g/,cn,ga & y g
m yyr gg r
sax
- 3. / 5 r 4 n - A b u
en asoog
[/,
fg UNITED STATES
',) -
g NUCLEAR REGULATORY COMMISSION y{J
'Ij W ASHINGTON, D. C. 20555 0, }%%,**..*/g September 1,1987 Docket No.:
50-245 Mr. Edward J. Mroczka, Senior Vice President Nuclear Engineering and Operations Northeast Nuclear Engineering Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Mroczka:
SUBJECT:
MAINTENANCE RESPONSIBILITY FOR SWITCHYARD BATTERIES - TECHNICAL SPECIFICATIONCHANGE(TAC 64476)
Re: Millstone Nuclear Power Station, Unit No.1 The Commission has issued the enclosed Amendment No. 10 to Facility Operating License No. DPR-21 for the Millstone Nuclear. Power Station, Unit No. 1.
This amendment is in response to your application dated January 21, 1987. This amendment removes reference to switchyard batteries from technical specification (TS) sectior.s 3.9 A.5, 4.9.B.2, and 4.9.B.
The staff concurs that the maintenance responsibility for the switchyard batteries belongs with the New London Substation Maintenance Department.
A copy of our related Safety Evaluation is enclosed. The Notice of Issuance will be included in the Commission's next regular biweekly Federal Register notice.
Sincerely,
'c$$0.
AWY Cecil 0. Thomas, Director Integrated Safety Assessment Project Directorate Division of Reactor Projects - III, IV, y and Special Projects
Enclosures:
1.
Amendment No. 10 to License No. DPR-21 2.
Safety Evaluation cc w/ enclosures:
See next page
v.
{
=
Mr. Edward J. Mroczka Millstone Nuclear Power Station f
Northeast Nuclear Energy Company
' Unit No. 1 c c..
Gerald Garfield, Esquire Kevin McCarthy, Director LDay, Berry &'Howard Radiation Control Unit Counseines at Law Department of Environmental
~ City: Place-Protection Hartford,. Connecticut. 06103-3499 State Office Building Hartford, Connecticut 06106
. Wayne D. Romberg.
Vice President, Nuclear Operations Richard M. Kacich, Manager Northeast Utilities Service Company Generation Facilities Licensing-Post Office Box 270 Northeast Utilities Service Company Hartford, Connecticut. 06141-0270 Post Office. Box.2701 Hartford, Connecticut 06141-0270.
Bradford S. Chase, Under Secretary Energy l Division Office of Policy and Management J. Stetz, Plant Superintendent-80 Washington Street.
Millstone, Unit 1 l
Hartford, Connecticut 06160:
Northeast Nuclear Energy Company P.O. Box 128 Waterford, Connecticut 06385
[
. Regional Administrator, Region I ll U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania ~ 19406 Northeast Nuclear Energy Company ATTN:
Superintendent Millstone Nuclear Power Station P. O. Box 128-Waterford, Connecticut 06385 i
Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 Niantic, Connecticut.06357 First Selectman of the Town of Waterford Hall-of Records 200 Boston Post Road Waterford, Connecticut 06385-l l
l-I