ML20238A679

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/87-25 & 50-457/87-24 on 870713-0806 & Notice of Violation
ML20238A679
Person / Time
Site: Braidwood  
Issue date: 08/25/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20238A682 List:
References
NUDOCS 8708310169
Download: ML20238A679 (2)


See also: IR 05000456/1987025

Text

h

'

j.

'

@#85 f

L

r-

,

-

4

AUG 2.5.1ni

1

Docket No. 50-456

i

Docket No. 50-457

,

Commonwealth Edison Company

l

-ATTN:

Mr. Cordell Reed

Senior Vice Pres'ident-

Post Office Box 767

l

Chicago, IL .60690'

Gentlemen:

This refers to .the routine safety inspection conducted by Mr. C. A. VanDenburgh

j

of this office on July 13 through August 6,1987, of activities at Braidwooo

1

Station Units 1 and 2, authorized by NRC Operating License No.,NPF-59 and

'

Construction Permit No.- CPPR-133 and to the. discussion of our findings with

Mr.-E. E. Fitzpatrick and others,of your staff at the conclusion of.the-

,

inspection.

1

The enclosed copy of our inspection report identifies areas examined during.

the inspection.

Within these areas, the inspection: consisted of a selective

i

examination of procedures and representative records, observations, and-

interviews with personnel.

I

During this inspection, certain of your activities appeared to be in violation

)

of NRC requirements, as described in the enclosed Notice.

A written response

is required.

j

'

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of.the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

,

We will gladly discuss any questions you have concerning this inspection.

g 83 g g gos2kS6

C. W. Heh ,' Chief

i

0oo

G

.PDR

Operations Branch

.

Enclosures:

1.

Notice of Violation

2.

Inspcction Reports

,

No.-50-456/87025(DRS);

'

No. 50-457/87024(DRS).

See Attached Distribution

l

\\W

$I .3

RIII g

RIII

.RIIIh

dQI

()J

i

Va

gT/abl

'W 1 ht

'

L-

tll

C

u{ e

1.

reon ;

. _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

_______

_

T.

A

.

Commonwealth Edison Company

2

A(JG 2 51987

Distribution

'

I

cc w/ enclosures:

D. Butterfield, Nuclear

Licensing Manager

M. Wallace, Manager of Projects

D. Shamblin, Project Manager

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr. , Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC

G. Berry, OGC

J. Stevens, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edies, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

- - _ _ - _ _ _ _ _ _ _