SEP02Igy
Docket.Nos. 50-321, 50-366
l
Georgia Power Company
J1'TN: Mr. James P. 0'Reilly
Senicr Vice President-
Nuclear Operations
i=
P.L0. Box 4545
Atlanta, GA 30302
Gentlemen:-
-SUBJECT: NOTICE OF VIOLATION-
(NRCINSPECTIONREPORTNOS. 50-321/87-18 AND 50-366/87-18)
This refers .to the Nuclear Regulatory Commission (NRC) inspection conducted by
A. Gooden on July 20-24,'1987.
The inspection included a review of activities
authorized for your Plant Hatch facility.
At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
>
these' areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
NRC requirements.
The violations, references to pertinent requirements, and
elements to be included in your response are described in the enclosed Notice
of Violation.
In 'accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
f
090$hkk
eDR
,(
o
ste n
_ _ _ - - - - _ _ _ _ _ .
_ _ - _ - _ .
- . . . . $/-
,1
..
,
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
J. Philip Stohr, Director
'
Division of Radiation Safety
and Safeguards
Enclosures:
1.
2.
Inspection Report
'cc w/encls:
LK T. Beckham, Vice' President. Plant Hatch
dh' C. ~ Nix, Site Operations General
Manager
LA. Fraser, Acting Site QA Supervisor
tk Gucwa, Manager, Nuclear Safety
and Licensing
bcc w/encls:
tJ4RC Resident Inspector
4tugh S. Jordan, Executive Secretary-
Document Control Desk
State of Georgia-
LK Heard, FEMA
E Matthews, NRR/EPRB
RI
RII
R
RII
AGooden
TDeher
DCollins MSinkule
8/ t/1/87
8/p/87
8/3//87
8/9/87
i