4 D DA/RYLAND hh/M COOPERATIVE. e O box 8i7 2eis EAST AVE SO LA CROSSE. WISCONSIN 54602-0817 (608) 788-4000 JAMES W. TAYLOR Gensral Manager August 3, 1987 In reply, please refer to LAC-12319 DOCKET NO. 50-409 Mr. A. Bert Davis, Regional Administrator Directorate of Regulatory Operations U. S. Nuclear Regrlatory Commission Region III 799' Roosevelt Road Glen Ellyn, IL 60137
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)
PROVISIONAL OPERATING LICENSE NO. JPR=?iH~'S RESPONSE TO IE INSPECTION rep 0RT/B0 400/88018 ODRS1 N
References:
1.
NRC Letter J. J. Harrison to J. W. Taylor dated January 22, 1987.
2.
DPC Letter J. W. Taylor to J. G. Keppler, LAC-12110, j
dated February 17, 1987.
Dear Mr. Davis:
This letter concerns Dairyland Power Cooperative's response to the Notice of Violation issued in conjunction with Inspection Report No.
i 50-409/87018 (DRS).
The Notice of Violation was transmitted with the Reference 1 letter, DPC's response (Reference 2) outlined our action plan for resolving the discrepancies discovered in the as-built configuration of I
the Righ Pressure Core Spray (IrPCS) piping system.
J l
LACBWR was permanently shut down on April 30, 1987, and the reactor was subsequently defueled.
Even though the HPCS system should not be required in the future, corrective actions in progress at the time of the shutdown were I
continued to completion.
A complete walkdown of the RPCS system piping has j
been performed.
Existing design drawings have been revised and several new drawings generated to reflect the as-built configuration of the system.
Finally, design calculations for the pipe supports have been revised based on j
as-built dimensions.
j
~
l Some of the discrepancies discovered in the RPCS system are related only j
to the piping configuration, not the piping supports.
Although DPC judges these discrepancies to be insignificant our original response (Reference 2) l 87082004.17 870B03 PDR ADOCK 05000409 G
PDR 1
1 PCl-33 g ggg7 g
1 I
7
o Mr. A. Bert Davis LAC-12310 August 3, 1987 Page 2 a
included plans to revise the computer analyses of the piping in order to resolve these piping discrepancies.
The additional revisions, however, had not been initiated prior to the shutdown of LACBWR.
Because of the operational status of LACBWR, these revisions are no longer considered necessary and will not be performed.
Doctunentation of our walkdown, new and revised drawings, and the revised design calculations for piping supports are on file at LACBWR.
These documents are available for inspection.
The other Open Item (409/86018-02) from the NRC's Inspection Report concerns several piping system upgrades which were planned by DPC in response to the Systematic Evaluation Program.
These upgrades are no longer considered necessary because of LACBWR's shutdown.
If you have any questions ttbout this response, please contact us.
Sincerely, J
DAIRYLAND POWER COOPERATIVE i
James W. Taylor General Manager 1
JWT:DPT:sks cc:
Document Control Desk NRC Resident Inspector j
P. Erickson, LACBWR Project Manager PCl-33 l..L t
-