Text
_
___
-
.
-
g
<
.
AUG S1IGN
i
1
\\
{
Alabama Power Company
JTTN: Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291-0400
Gentlemen:
SUBJECT:
REPORT NOS. 50-348/86-25 AND 50-364/86-25
We have completed'our review of your response of February 26, 1987, to our
' Notice of Violation (NOV) issued on January 26, 1987.
In your response you
confirm the actions -identified in the NOV but deny that these actions violate
the requirements of 10 CFR 50, Appendix J.
The NRC position in this matter has
not changed: specifically, 10 CFR 50 Appendix J requires that, for any repairs
or adjustments performed on the containment boundary prior to the Type A test
which have a potential to change the leak rate across that boundary, local
leak rate measurements must be made and any change in the leak rate used to
i
adjust the Type A test result to obtain the "as found" leakage condition.
We conclude that the v1olation is correct as issued.
Accordingly, please provide an additional response to the Notice of Violatio.n
pursuant to the provisions of 10 CFR 2.201 to this Office within 30 days of
i
the date of this letter.
Should you have any questions concerning this letter, please contact Frank Jape.
Sincerely,
'
i
OPJG!NA!. SIGNED BYi
J. NELSON GRACE
l
J. Nelson Grace
Regional Administrator
Wr O. Whitt, Executive Vice President
cc:
g& D. Woodard, General Manager -
l
Nuclear Plant
K G. Hairston, III, General Manager -
Nuclear Support
0:' W. McGowan, Manager-Safety Audit
1
and Engineering Review
]
J.' K. Osterholtz, Supervisor-Safety
Audit and Engineering Review
bec:
(See page 2)
8709090118 870031
ADOCK 0500'1348
G
0
- /
E-________________
_ _ - -
_ _ _ - .
AUG 311967
f
!
I
Alabama Power Compeny
2
bec:
NRC Resident Inspector
,5( Reeves, Project Manager, NRR
Document Control Desk
3
State of Alabama
1
1
l
J
!
4
-
t
bh
'
0
W
RII
/)t)
RII 9/-/
l
-
RMs /
-
lhitener:er
FJap6 '
- erdt
AGib on
Eg/87
08/ u 87
/4 /87
08/L(/87
A
RII
RI
hl'
,
7)
DVerrelli
Jenk hs
ML[rnt
08/q87
08/yg/87
68/ /7
1
l
l
l
l
'
w.
..
,
.
!
l
\\
Ln
in
CO?T
e
ce to
%
8
en
ca.
D
W,
cn
n
E.
.
- - -
. _ _ - . _ _ _ _ _ . . _ . _ . _ _ _ _ _ _ _ _ _ _ _
--