Forwards Special Insp Team Insp Repts 50-321/87-17 & 50-366/87-17 on 870727-31.No Items of Concern Identified. Strengths & Weaknesses Noted
ML20238A028
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/02/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20238A030 List:
References
NUDOCS 8709090102
Download: ML20238A028 (2)


See also: IR 05000321/1987017

Text

-__ -_

1"y

q.7

      • ' '

SEP 021987 .fM-

L

.4

Docket Nos.'50-321, 50-366

'

License Nos.,DPR-57, NPF-5-

,

c

-Georgia' Power Company

STN: Mr. James P. O'Reilly

Senior Vice President-

Nuclear Operations

P. 0. Box 4545

. Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC SPECIAL INSPECTION TEAM REPORTS NOS. 50-321/87-17 AND

50-366/87-17

This refers to the Nuclear Regulatory Commission (NRC) special inspection

conducted by .F. Jape on July.27-31 1987. The inspection was in accordance

with temporary instruction 2515/83, Balance of Plant Trial Inspection Program

(Feedwater System) at your Hatch' facility. At the conclusion of the inspec-

tion, the findings were discussed with those members of your staff identified

in the enclosed. inspection report.

Areas examined during the inspection are identified in the report. Within

.these areas,:the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within-the scope of the inspection, no items of concern were identified.

However, the team members did identify strengths and weaknesses. These are

summarized within the report for your consideration.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will' be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely.

Alan R. Herdt, Chief

Engineering Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

bec w/ enc 1: (See page 2)

8709090102 B70902

DR ADOCK0500g1

Ji

, )\\

trot

_

- _ _ _ _ _ _ _ - _ - _ _ _ _

-

' '

'

'

- .;ci  ::0 2 1987

4

-

>

-q

-s  :. o '

' Georgia '_ Power' Co .

cc w/ encl:-

Lt. T. Beckham, Vice President, Plant Hatch a

'IC C. Nix, Plant Manager

& Fraser, Acting Site- QA Supervisor

y ALT Gucwa, Manager, Nuclear Safety

and Licensing

bec w/ encl:' '

F. Jape, Region II _

'R..H. Bernhard, Region II.

.

dfDanielson, Region III  ;

f A.'Isom, NRR '1'

gT.Lefave,'NRR

LVT.Eccle'ston,NRR

S. E. Sparks ~, Region II J

R. P.-Starkey, Region II 3

A. J. Szczepaniec, Region II

.

I

$iRC Resident.' Inspector

tksgh S. Jordan, Executive' Secretary

Document Control Desk-

. State of Georgia

q

RII RII RII

l- ASzcze aniec:1b

08/27/87

FJ

08p//87

F trell

/87

Q  % V_ R (

l.

3}

- - _ - _ - _