Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARML20210Q4191999-08-10010 August 1999
[Table view]Notice of Violation from Insp on 990619-0723.Violation Noted:Within 2 Hours of Removing Div 1 Diesel Generator 11 from Svc Licensee Failed to Verify That Components Depending on Div 2 Diesel Were Operable ML20210J2201999-07-23023 July 1999 Notice of Violation from Insp on 990524.Violation Noted: on 980920 Kf Enoch Engaged in Deliberate Misconduct That Caused Licensee to Be in Violation of Condition of License ML20207J1531999-03-0808 March 1999 Notice of Violation from Insp on 990111-29.Violation Noted: as of Jan 1999,calculation DC-0367, Design Calculations for RHR Sys, Rev 6,incorrectly Concluded That Stated Item Would Occur ML20154D1361998-09-30030 September 1998 Notice of Violation from Insp on 980304-0702.Violation Noted:On 980213,individual Failed to Contact Radiation Protection Dept for Appropriate Radiological Briefing ML20236R1251998-07-15015 July 1998 Notice of Violation from Insp Completed on 970922.Violation Noted:Licensee Made Revs to Procedures as Described in Safety Analysis Rept W/O Receiving Prior Commission Approval ML20236Q9241998-07-14014 July 1998 Notice of Violation from Insp on 980504-0618.Violation Noted:Operators Were Making Changes to Facility by Defeating Various Control Room Annunciators W/O Performing Written Safety Analysis Rept ML20247D4371998-05-0606 May 1998 Notice of Violation from Insp on 980406-09.Violation Noted: on 980120,two Mechanical Maint Staff Entered North Reactor Water Cleanup Room,Locked High Radiation Area,W/O Stay Time Tracking & Deviation Not Authorized by Radiation Protection ML20217K2531998-03-31031 March 1998 Notice of Violation from Insp on 971113-980226.Violation Noted:Inspector Identified That on 971115,licensee Removed Multiple Fuel Rods from Irradiated Fuel Bundle YJ7119,up to Four at One Time,During Failed Fuel Insp Activities ML20216B5451998-03-0404 March 1998 Notice of Violation from Insp on 970804-1010.Violation Noted:Analysis Did Not Consider All Scenarios in Providing Bases for Determination That USQ Did Not Exist ML20202H8531998-01-0303 January 1998 Notice of Violation from Insp on 970923-1107.Violation Noted:On 971027 W/Edg 14 Inoperable,Licensee Identified That Operators Failed to Perform Verification Checks in SR 4.8.1.1.1 at Least Once Per Eight Hours ML20216J4531998-01-0202 January 1998 Notice of Violation from Insp on 970923-1107.Violation Noted:On 971027,w/EDG 14 Inoperable,Licensee Identified That Operators Failed to Perform Verification Checks in SR 4.8.1.1.1,at Least Once Per 8 Hours ML20217A9611997-12-0808 December 1997 Notice of Violation from Insp Completed on 970421.Violation Noted:On 960903,M Redlin & Employee of Numanco,Contractor at Plant,Unit 2 Answered No to Question on Ltr of Certification About Past Drug Use ML20198N3261997-10-29029 October 1997 Notice of Violation from Insp on 970804-1010.Violations Noted:Info in TSs & UFSAR Was Not Complete & Accurate in All Matl Respects ML20212F4311997-10-27027 October 1997 Notice of Violation from Insp on 970811-0922.Violation Noted:Inspectors Identified That on 960727,licensee Failed to Initiate DER Following Calibration of Div 2 Oxygen Monitor,During Which 2 Nonconservative Shifts Identified ML20211C3581997-09-23023 September 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Motor Control Ctr Fuse Disconnect Switch Installed in Safety Sys Failed to Remain Closed,Significant Condition Adverse to Quality ML20210R6581997-08-26026 August 1997 Notice of Violation from Insp on 970508-0630.Violation Noted:On 970624,licensee Identified That B RHRSW Cooling Tower Fan Rendered Inoperable for Planned Maintenance W/O Demonstrating Operability of Remaining AC Sources ML20149K8651997-07-0101 July 1997 Notice of Violation from Insp on 970320-0509.Violation Noted:On 970410,inspectors Identified That Work Request OOOZ974252 Specified Selected Steps from Procedure 44.060.001 as Post Maint Testing for Corrective Maint ML20148N1391997-06-19019 June 1997 Notice of Violation from Insp on 970512-30.Violation Noted:Licensee Failed to Perform PMT to Ensure That New Deficiency Was Not Created Due to Maint ML20140D3321997-06-0202 June 1997 Notice of Violation from Insp on 970201-0319.Violation Noted:Inspectors Identified That Licensee Did Not Have Prepared Instructions for Energizing & Startup of Bus 302 in Offsite Electrical Sys ML20148B8931997-05-0707 May 1997 Correction to NOV from Insp on 930916-24 & 1018-1104. Violation Noted:Personnel Signing Off as Lead Test Person for Tests Conducted 1991 on Div 1 & 2 Standby Gas Treatment Filters Were Not Certified to ANSI N45.2.6 ML20135B6771997-02-24024 February 1997 Notice of Violation from Insp on 961202-970207.Violation Noted:Review of Eight Contractor Security Officer Background Investigation Files Showed That Employment Verification Status of Five Applicants ML20134P5051997-02-0606 February 1997 Notice of Violation from Insp on 961026-1216.Violation Noted:Licensee Failed to Take Actions to Correct Deficiency of Loose Muffler ML20134B8551997-01-23023 January 1997 Notice of Violation from Insp on 960914-1025.Violation Noted:Test Personnel Failed to Stop Test & Promptly Restore Shutdown Cooling IAW Sequence of Events Test 96-07 Re Infrequently Preformed Test or Evolution 96-05 ML20129E9261996-09-26026 September 1996 Notice of Violation from Insp on 960629-0802.Violation Noted:Adequate Corrective Actions to Preclude Repetition of Significant Condition Adverse to Quality Previously Identified on 960331,were Not Taken ML20059B2761993-12-28028 December 1993 Notice of Violation from Insp on 931115-23.Violation Noted: on Four Occasions Personnel Have Been W/Unescorted Access Authorization to Protected Area ML20058E1871993-11-23023 November 1993 Notice of Violation from Insp on 930916-24 & 931018-1104. Violation Noted:Failed to Provide Training to Three Lead Test Personnel ML20059M5581993-11-10010 November 1993 Notice of Violation from Insp on 930909-1105.Violation Noted:Operators Failed to Implement ARP 4D40 When Low Gland Steam Pressure Annunciator Alarm Was Received Subsequent to Reactor Trip ML20056E1551993-08-13013 August 1993 Notice of Violation from Insp on 930524-0608.Violation Noted:Two Channels of Wide Range Drywell Pressure Post Accident Monitoring Instrumentation Sys Inoperable from 921104 Until 930107 ML20126B7271992-12-16016 December 1992 Notice of Violation from Insp Under NPF-43.Violation Noted:Employee of Facility Engaged in Action Compromising Integrity of Application or Exam Required by 10CFR55 ML20126B3951992-12-11011 December 1992 Notice of Violation from Insp on 921014-1208.Violation Noted:Failure to Comply W/Ts Overtime Requirements Previously Identified by Licensee in Apr-May 1991 Not Corrected & Failures Occurred Again in Sept 1992 ML20127D7241992-09-0909 September 1992 Notice of Violation from Insp on 920701-0824.Violation Noted:Access to Welding Matls Storage Area Not Properly Controlled in That Door Locking Mechanism Removed & Storage Area Left Unattended ML20217D0741991-07-11011 July 1991 Notice of Violation from Insp on 910429-0510,23,31 & 0603. Violation Noted:Surveillance Procedures for RPS Electrical Protection Assembly Calibr/Functional Tests Did Not Include Appropriate Quantitative or Qualitative Acceptance Criteria ML20055D8481990-06-27027 June 1990 Notice of Violation from Insp on 900331-0525.Violations Noted:Failure to Prescribe Adequate Instructions for Bypass Valve Rebuilding Effort & to Establish Adequate Measures for Reviewing Documents Associated W/Rebuilding Bypass Valves ML20246K4571989-07-11011 July 1989 Notice of Violation from Insp on 890411-0605.Violations Noted:Testing of 16 air-operated Containment Isolation Valves Was Not Adequate to Properly Demonstrate Operability ML20247Q1211989-06-0101 June 1989 Notice of Violation from Insp on 890218-0410 & 0517-19. Violation Noted:Operators Did Not Maintain Drywell to Torus Differential Pressure at Any Time While Plant Operating Since Jul 1985 ML20247N2961989-05-31031 May 1989 Notice of Violation from Insp on 890515-19.Violation Noted:Licensee Supervisor Failed to Either Sign & Process Several DERs Prepared by Subordinates or Provide Written Explanations Re Conditions Adverse to Quality ML20247J2591989-05-23023 May 1989 Notice of Violation from Insp on 890105-06,13-14 & 25. Violations Noted:Licensee Notified of Conditions Adverse to Quality & Failed to Correct Conditions in Timely Manner ML20245H7451989-04-21021 April 1989 Notice of Violation from Insp on 890118-0323.Violation Noted:Nuclear Engineering Did Not Initiate Deviation Rept as Required When Design Calculation 4572 & Procedure 44.020.204 Found W/Incorrect Head Correction Factor ML20244A7181989-04-0404 April 1989 Notice of Violation from Insp on 881212-890323.Violation Noted:During Later Half of 1988,licensee Administratively Closed 86 Deviation Event Repts & Nonconformance Repts W/O All Corrective Actions Completed ML20235Z6291989-03-0606 March 1989 Notice of Violation from Insp on 890101-0217.Violation Noted:Numerous Gaskets,Filters,Bolts,Nuts & Relief Valves for Emergency Diesel Generators Stored in Trailer W/O Access Controls ML20206L5591988-11-23023 November 1988 Notice of Violation from Insp on 880308-0920.Violation Noted:Engineering Evaluations Used to Select Diodes,Valves & Gears That Were Not safety-related for Applications Did Not Ensure Critical Characteristics Satisfied Requirements ML20206C6711988-11-0404 November 1988 Notice of Violation from Insp on 871018-880826.Violations Noted:Div 1 Portion of Procedure 24.413.01 Not Accomplished within 92 Day Time Interval & Failure to Perform Channel Check on Reactor Protection Sys ML20154P8831988-09-27027 September 1988 Notice of Violation from Insp on 880815-0909.Violation Noted:Procedures Established to Control Vendor Equipment Technical Info Not Adequate to Ensure That Only Reviewed, Approved & Current Vendor Technical Info Used at Work ML20207B7381988-07-25025 July 1988 Notice of Violation from Insp on 880401-0527.Violation Noted:Drywell High Pressure Channel C Instrument Inoperable in That Instrument Rack Valve Partially Closed,Generating Actuation Setpoint of Approx 2.38 Psig ML20196D3501988-06-28028 June 1988 Notice of Violation from Insp on 880516-20 & 0606-10. Violation Noted:Prior to 880610,controlled Copies of Maint Instructions Prescribing Activities Affecting Quality Exceeded 2-yr Review Cycle ML20155J9971988-06-16016 June 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $200,000.Violations Noted:On 871017,containment Isolation Configuration for Primary Containment Radiation Monitoring Sys Violated Requirements of GDC 56 ML20197F2401988-05-27027 May 1988 Notice of Violation from Insp on 880206-0331.Violation Noted:Failed to Show Organization for Unit Mgt & Technical Support on Figure 6.2.1-1 & Unit Organization on Figure 6.2.2-1 ML20154E2611988-05-12012 May 1988 Notice of Violation from Insp on 870413-1019.Violation Noted:Written Safety Evaluation Not Conducted for Condition Outside Analyzed Licensing Basis of Facility & License Amend Not Sought for Unreviewed Safety Question/Tech Spec Change ML20151X8251988-04-22022 April 1988 Notice of Violation from Insp on 880307-25.Violations Noted: No Acceptance Criteria or Machining Dimensions & Tolerances Provided in MSIV Procedure or Work Request & Component Replacements Made on Control Panel Not Classified ML20149M7841988-02-23023 February 1988 Notice of Violation from Insp on 880202-05.Violation Noted:Fillet Weld Size for Column to Base Plate Attachment (12 Column Connections) Incorrectly Specified as 3/16 Inch. No Calculations Found to Ensure Adequacy of Design 1999-08-10 Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS MONTHYEARIR 05000341/19990171999-10-21021 October 1999
[Table view]Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted. Major Areas Inspected:Incident Involving Loaded Firearm in Protected Area Identified on 990922 & Being Considered as Noncited Violation IR 05000341/19990111999-10-0707 October 1999 Insp Rept 50-341/99-11 on 990724-0908.Two NCVs Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19990101999-08-10010 August 1999 Insp Rept 50-341/99-10 on 990619-0723.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20210Q4191999-08-10010 August 1999 Notice of Violation from Insp on 990619-0723.Violation Noted:Within 2 Hours of Removing Div 1 Diesel Generator 11 from Svc Licensee Failed to Verify That Components Depending on Div 2 Diesel Were Operable IR 05000341/19990061999-08-0606 August 1999 Insp Rept 50-341/99-06 on 990712-0716.No Violations Noted. Major Areas Inspected:Review of Various Aspects of Licensee Chemistry & Radiation Protection Programs,Specifically in Listed Areas ML20210J2201999-07-23023 July 1999 Notice of Violation from Insp on 990524.Violation Noted: on 980920 Kf Enoch Engaged in Deliberate Misconduct That Caused Licensee to Be in Violation of Condition of License IR 05000341/19990091999-07-12012 July 1999 Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Operations IR 05000016/19990011999-06-30030 June 1999 Insp Rept 50-016/99-01 on 990614-17.No Violations Noted. Major Areas Inspected:Mgt & Control,Decommissioning Support Activities,Industry Safety & Radiological Safety IR 05000341/19990071999-06-0101 June 1999 Insp Rept 50-341/99-07 on 990402-0515.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support IR 05000341/19990041999-05-26026 May 1999 Insp Rept 50-341/99-04 on 990503-07.No Violations Noted. Major Areas Inspected:Radiological Emergency Response Preparedness Program,Aspect of Plant Support IR 05000341/19990081999-04-29029 April 1999 Partially Withheld (Ref 10CFR73.21) Insp Rept 50-341/99-08 on 990405-09.No Violations Noted.Major Areas Inspected: Physical Protection Program,Aspect of Plant Support IR 05000341/19990031999-04-23023 April 1999 Insp Rept 50-341/99-03 on 990218-0401.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Engineering,Maint & Plant Support ML20205P1751999-04-14014 April 1999 Insp Rept 50-341/99-06 on 990315-19.No Violations Noted. Major Areas Inspected:Licensee Plant Support Performance Re Gaseous & Liquid Effluents,Liquid Waste Processing,Esf Filtration & CR Heating Ventilation & Air Conditioning IR 05000341/19990051999-03-19019 March 1999 Insp Rept 50-341/99-05 on 990308-11.No Violations Noted. Major Areas Inspected:Reviewed Fire Protection Program,An Aspect of Plant Support IR 05000341/19990021999-03-0808 March 1999 Insp Rept 50-341/99-02 on 990111-29.Violations Noted.Major Areas Inspected:Review of Engineering & Technical Support & Corrective Actions ML20207J1531999-03-0808 March 1999 Notice of Violation from Insp on 990111-29.Violation Noted: as of Jan 1999,calculation DC-0367, Design Calculations for RHR Sys, Rev 6,incorrectly Concluded That Stated Item Would Occur IR 05000341/19980151999-02-22022 February 1999 Errata to Insp Rept 50-341/98-15.Rept Incorrectly Documented That Loose Internal Sleeving on Turbine Control Valve Caused Power Oscillations Greater than 10% During Plant Operation IR 05000341/19980191999-01-21021 January 1999 Insp Rept 50-341/98-19 on 981110-990104.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20198D5671998-12-0707 December 1998 Insp Rept 50-341/98-15 on 980922-1109.Noncited Violations Were Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000341/19980171998-11-16016 November 1998 Insp Rept 50-341/98-17 on 980909-1021.No Violations Noted. Major Areas Inspected:Review of Implementation of Inservice Insp Program for Plant Refueling Outage 6 PNO-III-98-055, on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions1998-11-13013 November 1998 PNO-III-98-055:on 981113,licensee Shut Unit Down to Repair Steam Leak from Reactor Feedwater Check Valve.Valve Is SR & Would Provide Containment Isolation Function Under Accident Conditions IR 05000341/19980181998-10-30030 October 1998 Insp Rept 50-341/98-18 on 981006-08.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maintenance at Nuclear Power Plants PNO-III-98-048, on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room1998-10-21021 October 1998 PNO-III-98-048:on 981008,Detroit Edison Declared Alert Based on Operator Rept of Smoke & Fire Alarm Coming from EDG 12 Control Panel in Switchgear Room.Operator Tripped EDG 12, Opened Output Breaker & Left Switchgear Room IR 05000341/19980131998-10-20020 October 1998 Insp Rept 50-341/98-13 on 980730-0921.No Violations Noted. Major Areas Inspected:Aspects Oflicensee Operations, Engineering,Maint & Plant Support IR 05000341/19980161998-10-0606 October 1998 Insp Rept 50-341/98-16 on 981014-18.No Violations Noted. Major Areas Inspected:Alara Planning & Controls for Sixth Refueling Outage,Internal Exposure Monitoring,Radiological Surveys & Posting & Radiation Worker Performance IR 05000016/19980071998-09-30030 September 1998 Insp Rept 50-016/98-07 on 980909-11.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Industrial Safety & Radiological Safety ML20154D1361998-09-30030 September 1998 Notice of Violation from Insp on 980304-0702.Violation Noted:On 980213,individual Failed to Contact Radiation Protection Dept for Appropriate Radiological Briefing IR 05000341/19980121998-09-0101 September 1998 Insp Rept 50-341/98-12 on 980619-0803.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20236R1251998-07-15015 July 1998 Notice of Violation from Insp Completed on 970922.Violation Noted:Licensee Made Revs to Procedures as Described in Safety Analysis Rept W/O Receiving Prior Commission Approval IR 05000341/19980081998-07-14014 July 1998 Insp Rept 50-341/98-08 on 980504-0618.Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering, Maint & Plant Support ML20236Q9241998-07-14014 July 1998 Notice of Violation from Insp on 980504-0618.Violation Noted:Operators Were Making Changes to Facility by Defeating Various Control Room Annunciators W/O Performing Written Safety Analysis Rept IR 05000341/19980101998-06-29029 June 1998 Insp Rept 50-341/98-10 on 980608-12.No Violations Noted. Major Areas Inspected:Plant Support & Evaluation of Licensee Performance During Station Biennial Exercise of Emergency Plan IR 05000341/19983011998-06-29029 June 1998 NRC Operator Licensing Exam Rept 50-341/98-301OL(including Completed & Graded Tests) for Tests Administered on 980406- 0520.Six Applicants Were Administered Exam,Two Failed Written Exam,Two Failed Operating Exam & One Failed Both IR 05000341/19980111998-06-25025 June 1998 Insp Rept 50-341/98-11 on 980608-12.No Violations Noted. Major Areas Inspected:Radiological Controls for Spent Fuel Pool Clean Out Project IR 05000341/19980091998-06-0404 June 1998 Insp Rept 50-341/98-09 on 980511-15.No Violations Noted. Major Areas Inspected:Aspects of Licensee Performance Re Physical Security for Facility IR 05000341/19980061998-06-0303 June 1998 Insp Rept 50-341/98-06 on 980317-0427.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000341/19980031998-05-11011 May 1998 Insp Rept 50-341/98-03 on 971221-980316.Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20247D4371998-05-0606 May 1998 Notice of Violation from Insp on 980406-09.Violation Noted: on 980120,two Mechanical Maint Staff Entered North Reactor Water Cleanup Room,Locked High Radiation Area,W/O Stay Time Tracking & Deviation Not Authorized by Radiation Protection ML20247D4511998-05-0606 May 1998 Insp Rept 50-341/98-07 on 980406-09.Violations Noted.Major Areas Inspected:Plant Support IR 05000016/19980061998-04-21021 April 1998 Insp Rept 50-016/98-06 on 980324-26.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities & Radiological Safety ML20216E7901998-04-10010 April 1998 Insp Rept 50-341/98-05 on 980320-0406.Violations Noted: Failure to Demonstrate Reactor Protection Sys Trip Function Units & Isolation Actuation Trip Units within Response Time Limit of at Least Once Per 18 Months ML20217K2821998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20217K2681998-03-31031 March 1998 Notice of Deviation from Insp on 971113-980226.Deviation Noted:Licensee Stored Irradiated Fuel in West Fuel Preparation Machine in Sf Pool Oversight on 971114-15 & 971115-17,resulting in Only 20.5 Feet Water Above Top of Sf ML20217K2531998-03-31031 March 1998 Notice of Violation from Insp on 971113-980226.Violation Noted:Inspector Identified That on 971115,licensee Removed Multiple Fuel Rods from Irradiated Fuel Bundle YJ7119,up to Four at One Time,During Failed Fuel Insp Activities IR 05000341/19980041998-03-31031 March 1998 Insp Rept 50-341/98-04 on 971113-980226.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20216B5451998-03-0404 March 1998 Notice of Violation from Insp on 970804-1010.Violation Noted:Analysis Did Not Consider All Scenarios in Providing Bases for Determination That USQ Did Not Exist IR 05000341/19970161998-02-0505 February 1998 Insp Rept 50-341/97-16 on 981108-0105.Noncited Violation Identified.Major Areas Inspected:License Operations,Maint, Engineering & Plant Support PNO-III-98-015, on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing1998-02-0404 February 1998 PNO-III-98-015:on 980201,reactor Scrammed from 96% Power Following Trip of Main Turbine.Main Turbine Trip Resulted from Main Generator Load Rejection Protective Signal. Investigation Continuing IR 05000341/19970171998-01-21021 January 1998 Insp Rept 50-341/97-17 on 971201-05.No Violations Noted. Major Areas Inspected:Conduct of Operations,Operator Training & Qualification & Miscellaneous Operations Issues ML20202H8531998-01-0303 January 1998 Notice of Violation from Insp on 970923-1107.Violation Noted:On 971027 W/Edg 14 Inoperable,Licensee Identified That Operators Failed to Perform Verification Checks in SR 4.8.1.1.1 at Least Once Per Eight Hours 1999-08-06 |
Text
.
3 o ,
l NOTICE OF VIOLATION !
Detroit Edison Company Docket No. 50-341 i c1 d
As a result of the inspection conducted on July 1-10, 1987, and in accordance I with 10 CFR Part 2, Appendix C - General Statement of Policy and Procedure {
for NRC Enforcement Actions (1985), the following violations were identified: l 10 CFR 50, Appendix B, Criterion V requires that activities affecting quality j be described in procedures appropriate to the circumstances, j 2
A. Contrary to the above, Detroit Edison Procedures P0M 22.000.10, " Shutdown !
from Rated Power to Cold Shutdown," POM 22.000.12, " Reactor Heatup, l Ccoldown, and Temperature vs. Pressure Monitoring," POM 23.205, " Residual '
Heat Removal System," were not appropriate to the circumstances in that l they contained no information as to how or at what temperature to ,
maintain reactor coolant when the unit is in cold shutdown. ]
- 8. _ Contrary to the above, Detroit Edison Procedure 21.00.02, " Conduct of l Shift Operators," was not appropriate as it stood mute on the point of '
the status of a trainee on shift and did not provide reasonable guidance as to the trainee's activities.
f i
This is a Severity Level IV violation (Supplement I).
{
u Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this 1 office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) corrective action ,
taken and the results achieved; (2) corrective action to be taken to avoid l further violations; and (3) the date when full compliance will be achieved. l Consideration may be given to extending your response time for good cause shown. )
l W h*'
Dated Hubert J. Miller, Director Division of Reactor Safety l