Forwards Insp Rept 50-482/87-19 on 870727-31.Immediate Attention Required for Unresolved Item Re Training Due to Potential for Becoming Violation
ML20237K984
Person / Time
Site: Wolf Creek 
Issue date: 08/13/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20237K988 List:
References
NUDOCS 8708200035
Download: ML20237K984 (2)


See also: IR 05000482/1987019

Text

_

AUG 131987

.-

,

!

In Reply Refer To:

Docket: 50-482/87-19

Wolf Creek Nuclear Operating Corporation

ATTN:

Bart D. Withers, President

and Chief Executive Officer

P. O. Box 411

Burlington, Kansas 66839

Gentlemen:

)

'

This refers to the inspection conducted by Messrs. P. H. Harrell and

i

B. L. Bartlett of this of fice during the period July 27-31, 1987, of activities

i

authorized by NRC Operating License NPF-42 for the Wolf Creek Generating

Station, and tc the discussion of our findings with Mr. G. D. Boyer and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included licensed operator initial

!

training and requalification programs, and the nonlicensed staff training

!

program. Within these areas, the inspection consisted of selective examination

l

4

of procedures and representative records, interviews with personnel, and

observations by the NRC inspectors.

The inspection findings are documented in

the enclosed inspection report.

During this inspection, it was found that certain of your activities were a

potential violation of NRC requirements.

However, since the potential

violation is related to training, it is not cited herein as a violation but is

considered to be an unresolved item in accordance with the Commission Policy

i

Statement on Training and Qualification of Nuclear Power Plant

'

Personnel (50 FR 11147).

No response is required; however, your attention to

the unresolved item that has the potential of becoming a violation in the

l

future is warranted.

The unresolved item is identified in paragraph 3 of the

1

enclosed inspection report.

In addition, it das aetermined during this inspection that a licensed

individual that failed the annual requalification examination was not removed

l

from licensed duties and placed in your accelerated requalification program in

j

a timely manner.

Although not specifically stated in 10 CFR Part SS, the NRC's

(

position is that an individual must be removed from licensed duties immediately

l

'

after performance evaluations performed in accordance with your NRC-approved

l

requalification program clearly indicate the need.

Your immediate attention to

l

this item is warranted.

h8

RI/

/

RI

PI

JEGagly[$ako

C:RPB

PHH rell/nc

BL

'tle t RPt ullikin

ORHunter

8/)\\/87

8/){/87

8/ll/87

8/tl/87

8/$/j8

g

/e

v

!

B70e200035 870813

Y

PDR

ADOCK 050

2

G

\\\\

1

,

.

..

I

I

Wolf Creek Nuclear Operating

-2--

,

Corporation

.j

'

l

l

l

Should you have any questions concerning this inspection, we will be pleased to

l

discuss them with you,

i

i

Sincerely,

I

-)

1

Original S1gned By

I

J. E. Grgllardo

i

i

J. E. Gagliardo, Chief

j

Reactor Projects Branch

j

Enclosure:

Appendix - NRC Inspection Report

50-482/87-19

cc w/ enclosure:

Wolf Creek Nuclear Operating Corporation

'

ATTN:

Otto Maynard, Manager

of Licensing

I

P. O. Box 411

t

Burlington, Kansas

66839

Gary Boyer, Plant Manager

-l

l

Wolf Creek Nuclear Operating Corporation

{

P. O. Box 411

-l

.

'

Burlington, Kansas

66839

'

Mr. Robert D. Elliott, Chief Engineer

I

Kansas Corporation Commission

Fourth Floor, Docking State Office Building

Topeka, Kansas

66612-15/1

Kansas Radiation Control Program Director

bcc to DMB (IE01)

bec distrib. by RIV:

  • RPB

Myron Karman, ELD, MNBB (1)

  • RRI

R. D. Martin, RA

  • Section Chief (RP8/B)

ORSP

RPS8

W. L. Forney, RIII

  • RIV File

Resident Inspector, RIII

  • MIS System
  • RSB

i

  • RSTS Operator
  • Project Inspector, RPB
  • 0. Weiss, RM/ALF
  • R. Hall
  • P. O'Connor, NRR Project Manager
  • w/766

,.

I

_-_m._..m______

- - - - - . - - - - - - - - - - - ' - -