MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
e 9
W GEORGIA POWER COMPANY MONTH LY OPERATING DATA REPORTS PLANT HATCH UNITS 1 AND 2 0
4 e
a b
N~'- gg :
~
2n i n o tuiti v tillll III \
l
' \
s T ""I -
1 \
l ,,,,
c1 /
puna m%c
s
. Y' y ,
Georgia Powerkn 1
c 4
ENCLOSURE 1 l
TABLE OF CONTENTS i PLANT HATCH - UNIT 1 s NRC DOCKET DPR-57 i l
MONTHLY OPERATING REPORT ll)NE 1981 NARRATIVE REPORT s- Nge El-1 1
OPERATING DATA REPORT Page El-2 ]
1 AVERAGE DAILY POWER LEVEL , Page El-3 I UNIT SHUTDOHNS AND PONER REDUCTIONS Page El-4 l
(
3
a 1
. I b
i NARRATIVE REICRI DOCKET No. 50-321 ,
WIT 1 DATE: JULY 7, 1987 CM PLETED BY: J.H. RICHARDSON ,
TEEPH3NE: (912) 367-7781 x2878 i
. June 1 0000 Refueling outage continues.
June 1 1600 Core reload began.
June 8 0305 Core reload ocenpleted.
June 23 0218 ' Began pulling rods for startup. '
{
Reactor critical.
1 June 23 .0338 June 26 0412 Main gonarator tied to line.
June 26 0807 Generator taken off line to perform turbine overspeed testing.
June 26 , 0851: Generator tied to line. Pt:7er ascension in progress.
June 27 2103 Reducing pcwer to shutdown for -
investigation of Drywell Cooler problems. i June 27 2148 Initiated manual scram.
June 28 1608 Began pulling rods for startup. Inlet .
flow control valve for Plant Service Water to "A" Drywell Cooler was found to be manually jacked closed.
June 28 1837 Reactor critical.
June 29 0515 Generator tied to'line. Power ascension in progress.
June 30 1624 Began load reduction to approximately 360 MWe to isolate 5B Feedwater Heater to repair leaking manway on feedwater side of heater.
June 30 2400 Operating at reduced load of 450 NNe for repair of 5B Feedwater Heater, El-1
. , (
I OPERATDG DATA m.w xr DOCKET 10. 50-321 DATE: JULY 7, 1987 CDiPIZIED BY: J. H. RIGARDSON TEI.EEHONE: (912) 367-7781 x2878 OPERATDIG STATUS
- 1. UNIT NAME: E. I. HATCH UNIT 3
- 2. REFORP PERIOD: JUNE-87
- 3. LICENSED THERMAL POWER (!&t): 2436
- 4. NAMEPI. ATE RATDG (GROSS MWe): 850
- 5. DESIGN ELECIRICAL RATDG (NET NNe): 776.3
- 6. MAXD0M DEFENDABIE CAPACITY (GROSS MNe): 783
- 7. MAXIMUM DEFENDABIE CAPACITY (NET !@e): 750
- 8. IF CHANGES OCCUR IN CAPACITY RATHIGS (ITDiS 3 THROUGH 7) SINCE IAST REFORD, GIVE REASONS: 10 GANGES
- 9. BDWER IEVEL 70 WHIG REs1MCTED, IF ANY (NET IMe): 10 RESTRICTIONS l
- 10. REASONS FOR RF.s1MCTION, IF ANY: N/A THIS MONIH YR. TO DATE CUFUIATIVE l
- 11. HOURS IN mwfulNG PERIOD: 720 4343 100774
- 12. NUMBER OF HOURS REACIOR NAS CRITICAL: 167.6 2813.8 70461.3
- 13. REACIOR RESERVE SHUTIn@l HOURS: 0.0 0.0 0.0
.14. HOURS GENERATOR ON-LINE: 83.7 2687.4 66412.8
- 15. UNIT RES G VE SHUIDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH): 103214 6079315 142551226
- 17. GROSS EI.EC. ENERGY GENERATED (!EH): 22300 1966330 46033680
- 18. NET EI.EC. ENERGY GENERATED (MWH): 14508 1869694 43712604
- 19. UNIT SERVICE FACIOR: 11.6% 61.9% 65.9%
- 20. UNIT AVAII. ABILITY FACIOR: 11.6% 61.9% 65.9%
- 21. UNIT CAPACITY FACIOR (USDIG MDC NET): 2.7% 57.4% 57.8%
- 22. UNIT CAPACITY FACIOR (USDG DER NET): 2.6% 55.5% 55.5%
- 23. UNIT FORCED OUIAGE RATE: 27.3% 3.5% 16.0%
- 24. SHUTIU4NS SCHEDUIED OVER THE NEXT 6 IONIHS (TYPE, DATE, AND IUPATION OF EAG): N/A
- 25. IF SHUIDOWN AT END OF wmxr PERIOD, ESTIMATED DATE OF STARIUP: N/A
- 26. UNITS IN TEST STATUS ( PRIOR TO CCitIERCIAL OPERATION): N/A El-2
9 UNIT 1 AVEPNE DAILY DOCKET 10. 50-321 ICWER IEVEL DATE: JULY 7, 1987 O'HPLETED BY: J. H. RICHARDSON TETEPHONE: (912) 367-7781 x2878 DAY Net M1 l 1 ..'....... 0 l 2 ......... 0 3 ......... 0 4 ......... 0 5 ......... 0 6 ......... 0 7 ......... 0 8 ......... 0 9 ......... 0 10 ......... 0 11 ......... 0 12 ......... 0 13 ......... 0 14 ......... 0 15 ......... 0 16 ......... 0 17 ......... 0 18 ......... 0 19 ......... O 20 ......... 0 21 ......... 0 22 ......... 0 23 ......... 0 24 ......... 0 25 ......... 0 26 ......... 87 27 ......... 198 28 ......... 0 29 ......... 145 30 ......... 416 El-3
1
)
UNIT SHUPDCRE AND ECWER REEUCTIONS DOCKET NO. 50-321 DATE: JULY 7, 1987 UNIT NAME: E.I. HAIG 1 02GIEIED BY: J.H. RICHARIEON TEIEPHONE: (912) 367-7781 x2878 Rt.wxr FDNIH JUlE 1987 l l l 1 lRlMl lS j l l l 1 I l lElEl lY l l l l l lTl l A l T l LICENSEE l 3 C l l l 1
l l lYl l S l H I EVENT lTOl l CAUSE & CORRECITVE l l l l P lIXJRATIONl 0 l 0 l REEORT l E D I00MR2ENrl ACTION TO I l NO. I DATE l E l(HOURS) l N I D l NUMBER l M E l CDDE l PREVENT RECURRENCE l l l l 1 i l l I I I I I87-010 l870601l S l 604.2 l C l 4 l N/A l RC l FUELXX lRefuelity outage continues. l l l l l 1 I I I I I I l87-011 l870626l S l 0.7 l B l 1 l N/A l HA l 'IURBIN l Generator taken off line to l l l l l l l l 1 I Iperform turbine overspeed l I I I I i I I i i Itesting. I I I I I I I I I I I I l87-012 {870627l F l 31.5 l H l 2 l- N/A l SB l HIEXCH l Shutdown for investigation ofl l l l l 1 I I I I lDrywell Cooler problems. I l l l l l l l l l l Inlet flow control valve for l l l l l l l l l l l Plant Service Water to "A" l l l { l l l l l l lDrywell Cooler was found to l l l l l l l l l l lbe manually jacked closed. l l l l l l l l l l l l l l l l l l 1 l l l l l l l l I I I I I I I I I I I I I I I I I I I l l l \ l l I I l l l l l l l l l l l 1 1 I I I I I I I l I I I I I I I I I I I I I I I I I I I I I I I I I
.I I I I I I I I I I I I I I l l I I I I I I I I I I I I I I I I I I I I I I I I I I I I F: FORCED REASON: MEIHOD: EVDTIS ut.wxim INVOLVE S: SCHEEULED A-EQUIEMENT FAIIURE (EXPIAIN) 1 - MANUAL A GREATER THAN 20%
B-MADfrENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUIO. SCRAM DAILY POWER LEVEL FOR D-RD3UIFIORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDDiG 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - ICAD REDUCTION F-AININISTRATIVE 9 - OIHER (EXPIADI)
G-OPERATIOtE ERROR (EXPIADI)
H-CIHER (EXPIAIN)
El-4
f l- e 1
Geoigia Powerkn i
l ENCLOSURE 2 TABLE OF CONTENTS PLANT HATCH - UNIT 2 NRC DOCKET NPF-5 MONTHLY OPERATING REPORT JUNE 1987 NARRATIVE REPORT Page E2-1 OPERATING DATA REPORT Page E2-2 AVERAGE DAILY POWER LEVEL Page E2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page E2-4 0166C 100715
l t
M
- NARRATIVE REPTT DOCKET No. 50-366 UNIT 2. DATE:- JULY 7, 1987 '
COMPLETED BY: J. H. RICHARDSON l TELEPHONE: (912) 367-7781 x2878 June 1 0000 Unit Operating at 90% power to limit offgas activity. ,
June 12 2207 Reducing load to 620 We for weekly turbine valve / auxiliaries testing.
June 13 0025 Returning unit to 90% power.
Reducing load to approximately 670 We for weekly June 20 2310 turbine valve / auxiliaries testing.
June 20 2352 Returning unit to 90% power.
June 28 0020 Reducing load to approximately 650 We for weekly turbine salve / auxiliaries testing. 1 June 28 0110 Returning unit to 90% power.
June 30 2400 Unit operating at 90% power to limit offgas activity.
l
.}
l 1
i E2-1 f
)
e OPERATHIG DATA REM RT DOGET 10. 50-366 DATE: JULY 7, 1987 CmPIETED BY: J. H. RIGARDSON ,,
TEIZ1 HONE: (912) 367-7781 x2878 OPERATHG STAIUS:
- 1. UNIT IGNE: E. I. HAI m UNIT 2
- 2. m2ucitiG PERIOD: .
JUNE-87
- 3. IICENSED THERMAL POWER (Wt): 2436
- 4. IDWEPIATE RATDG (GROSS We): 850
- 5. DESIGN ELECIRICAL RATHIG (NET We): 784
- 6. MAXIMUM DEFENDABIE CAPACITY (GROSS We): 794
- 7. MAXIMUM DEFENDABIE CAPACITY (NET We): 761
- 8. IF GANGES OCCUR IN CAPACITY RATDGS (ITDiS 3 'IHROUGH 7) SDiCE IAST REFORT, GIVE REASONS: 10 GANGES
- 9. POWER IEVEL 'IO NHICH hic 1CIED, IF ANY (NET We): 90% (700 We)
- 10. REASONS FOR RESTRICTION, IF ANY: ADMINISTRATIVE 'IO IlMIT OFICAS ACTIVITY.
'IHIS !ONIH YR /IO-DATE CUMUIATIVE
- 11. HOURS Di REwinu.tiG PERIOD: 720 4343 68400
- 12. NUMBER OF HOURS REACIOR WAS CRITICAL: 720.0 4306.0 48329.3
- 13. REACIOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 14. HOURS GENERATOR ON LINE: 720.0 4272.2 46312.0
- 15. UNIT RESERVE SHUIDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GDIERATED (MWH): 1580256 9978330 100078265
- 17. GROSS ELEC. ENERGY GENERATED (MWH): 518150 3306480 32901690
- 18. NET ELEC. ENERGY GDIERATED (MWH): 495974 3167603 31317482
- 19. UNIT SERVICE FACIOR: 100.0% 98.4% 67.7%
- 20. UNIT AVAILABILITY FACIOR: 100.0% 98.4% 67.7%
- 21. UNIT CAPACITY FACIOR (USDiG MDC NET): 90.5% 95.8% 5949%
- 22. UNIT CAPACITY FACIOR (USDiG DER NET): 87.9% 93.0% 58.4%
- 23. UNIT FORCED CUIAGE RATE: 0.0% 1.6% 8.8%
- 24. SHUIDOWNS SGEDUIED OVER IHE NEXT SIX !ONIES (TYPE, DATE, AND DURATION OF EAG): N/A
- 25. IF SHUIDOWN AT DID OF m2uc PERIOD, ESTIMATED DATE OF STARIUP: N/A
- 26. UNITS IN TEST SIAIUS (PRIOR TO CmMERCIAL OPERATION): N/A E2-2
e UNIT 2 AVERAGE DAILY DOCKET NO. 50-366 FCWER IEVEL DATE: JULY 7, 1987 CrHPIEIED BY: J. H. RICHARDSON TEIEPHONE: (912) 3.67-7781 x2878 DAY Net 151
'l ......... 687 2 ......... 689
-3 ......... 690 4 ......... 690 5 ......... 693 6 ......... 693 7 ......... 694 8 ......... 696 9 ......... 696 10 ......... 693 11 ......... 693 12 ......... 684 13 ......... 684 14 ......... 688 15 ......... 689 16 ......... 688 17 ......... 690 18 ......... 687 19 ......... 690 20 ......... 687 21 ......... 687 22 ......... 687 23 ......... 687 24 ......... 683 25 ......... 684 26 ......... 684 27 ......... 686 28 ......... 691 29 ......... 691 30 ......... 685 E2-3
e 1
UNIT SHLTfDOWNS AND KMER REDUCTIONS DOCKETT NO. 50-366 DATE: JULY 7, 1987 UNIT NAME: E.I. HAIG 2 C m PIEIED BY: J.H. RIGARNON TEIEPHONE: (912) 367-7781 x2878 REM RT FONIH JUNE 1987 1 I I I l RIM l lS I I I l l l I lEIEl lY I I l l l lTl l A l T ILICENSEEl S C i l I l I lYl l S I H I EVENT ITOl l CAUSE & CDRRECTIVE l
\ l l l P l DURATION l 0 I O l 1e.kuu I E D lCIMOND7rl ACTION 70 l l 10. I DATE I E l(HCXJRS) l N I D l NUMBER I M E I CDDE I PREVDTI RECURRDIG l 1 I I I I I I I I I I l87-007 I870601l S I OlFI5l N/A l RC l EUELXX l Administrative decision to [
l l l l l l l l l Imaintain 90% power to l l l l l l l l l l l limit offgas activity. l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l l I l 1 l l I I l l l 1 I I l l l l l l 1 1 I I I I I I I I I I I I I I I I I I I I I I I I I I l l l l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l l \ l l I I I I I I I I I I I I I I I I I I I I I I I I I I I I i l i I I I I I I I I I I I I I I I I i l l I I I I I I I I I I I J l l I F: IDRCED REASON: ME?IHOD: EVDTIS le.wintu INVOLVE S: SGEDULED A-EQUIPMENT FAIIURE (EXPIAIN) 1 - MANUAL A GREATER THAN 20%
B-MADTIENANG OR TEST 2 - MANUAL SGAM REDUCTION IN AVERAGE C-REFUELING 3 - AUIO. SCRAM DAILY FOWER LEVEL FOR D-REGUIAIORY RESTRICTION 4 - CONTINUATIONS 'IHE PRECEEDDIG 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - ICAD REEUCTION F-ADMINISTRATIVE 9 - OIHER (EXPIAIN)
G-OPERATIONAL ERROR (EXPIAIN)
H-CIEER (EXPIAIN) e E2-4
a.' Georg a Power Cornpany .
, 333 Piedmont Avenue
- w. J Atlanta, Georgia 30306 Telephone 404 526 6526 p Mailing Address:
Fbst Off!ce Box 4545 Alianta, Georgia 30302 Georgia Power L. T. Gucwe .
the southem eicctne systom Manager Nuc;aat Safety -
and ucen3ing SL-2843 0166C X7GJI7-H510 y
. July 13,.'1987 L
Director, Office of Management and Program Analysis U. S. Nuclear Regulatory Commission i Washington, D. C. 20555
-PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50--321, 50-366 OPERATING LICENSES OPR-57, NPF-5 o MONTHLY OPERATING REPORTS Gentlemen: .a Enclosed are the Monthly Operating Reports- for Plant Hatch Unit 1, Docket Number 50-321, and for Plant Hatch Unit 2, Docket Number 50-366.*
These reports are submitted pursuant to the requirements of Technical Specifications Section 6.9.1~.10. 1 Sincerely, f Gu L. T. Gucwa '
LG8/lc :
Enclosures:
- 1. Monthly Operating Report for Hatch-1
- 2. Monthly Operating. Report for Hatch-2 c: (see next page) k 50 I i
Georgia Powerkn c< Director, Office of Management and Program Analysis July 13, 1987 Page Two c: Georaia Power ComDany
}~ Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations ,
Mr. J. T. Beckham, Jr. , Vice President - Plant Hatch !
- GO-NORMS U. E. Nuclear Regulatory Commission. Washinaton. D. C.
Mr. L. P. Crocker, Hatch Licensing Project Manager 3
U. S. Nuclear Regulatory Commission. Region II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch 0166C
""5