Text
_
CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2'
RUN DATE 04/07/87 OPERATING DATA REPORT RPD36-COO RUN TIME 14:57:01 DRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRIS 0N' OPERATING STATUS TELEPHONE (919)457-9521
____________.q_.________________-
1.
UNIT NAME: BRUNSWICK UNIT 2 i NOTES l
2.
REPORTING PERIOD: JANUARY 87 1
1 3.
LICENFED THERMAL POWER (MWT): 2436 I
i 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
I 3.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 1
I 6.
MAX DEPENDADLE CAPACITY (GROSS MWE): 815.0 1 1
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 744.00 98592.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 567.26 567.26 59312.19
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 493.12 493.12 55533.43
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENER0Y GEN. (MWH) 1106781.98 1106781.98 112065430.06
- 17. GROSS ELEC. ENERGY GEN. (MWH) 359130.00 359130.00 36197456.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 346787.00 346787.00 34645270.00
- 19. UNIT SERVICE FACTOR 66.28 66.28 56.33
- 20. UNIT AVAILABILITY FACTOR 66.28 66.28 56.33
- 22. UNIT CAP. FACTOR (USING DER NET) 56.77 56.77 42.80
- 23. UNIT FORCED OUTAGE RATE 33.72 33.72 15.13
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMTiFCIAL OPERATION): FORECAST ACHIEVED INITI AL CRITICA' ITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8708190299 G70331
[][p'.
N4, PDR ADDCK 05000324 R
\\ \\,.
L PP&L'C0 PLANT PERFORMANCE DATA SYSTEM PAGE 2
l..RUN DATE. 04/07/87 OPERATING DATA REPORT RPD36-000i RUN TIME. 14:58:24 DRUNSWICK UNIT 2 1
DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON-OPERATING STATUS TELEPHONE (919)457-9521 1.
UNIT NAME: BRUNSWICK UNIT 2 i NOTES I
2.
REPORTING PERIOD: FEBRUARY 87 I
i 3.
LICENSED THERMAL POWER (MWT): 2436 I
i 4.
NAMEPLATE RATING (GROSS MWE): 867.0 I
i 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 1
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO (4'ICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RES1RICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 672.00 1416.00 99264.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 592.25 1159.51 59904.44
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 557.70 1050.82 56091.13
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (HWH) 1306272.84 2413054.82 113371710.90
- 17. GROSS ELEC. ENERGY GEN. (MWH) 426380.00 785510.00 36623836.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 413312.00 760099.00 35058582.00
- 19. UNIT SERVICE FACTOR 82.99 74.21 56.51
- 20. UNIT AVAILABILITY FACTOR 82.99 74.21 56.51
- 22. UNIT CAP. FACTOR (USING DER NET) 74.91 65.38 43.02
- 23. UNIT FORCED OUTAGE RATE 2.41 20.12 15.02
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
DOCKET NO.:
050-0325 UNIT:
Brunswick 1 DATE: April 1987 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 1 The unit was removed from service on February 14, 1987, for refueling /mainte-nonce outage.
There are*1400 BWR and 160 PWR spent fuel bundles in the Brunswick Unit 1 fuel pool.
- 560 bundles in the core during refueling.
l
nin i DiR t
c 0 u ra 9 c
L 5 r or1 f
i c
g r o r 0 BAF 9 e
e e
u v
o n
a t
nf(
s tc e
t O EEYE e or u
Inoi ts r
MTBN run c r
s t
e AA D O t
u O
N ar e Gah E H Co e e,
T N D pSR iR c
ib r y n
t e
E K T T P
&t E
c C N L L eA t
a i Pr n1 E
n n
h tn I
s e
e x
r O U P E u
v t
o T
a e
n EfEE0 D
M C
P r
i O
a C
M 4
/gn i
l
~
eu fe R
SN O
X X
I 0-m E%?.
T n
e
_ aS l
C D
hu r
U u
ci F
St 7
E 8
- l l a a R
9 I
duu 1
onnt R
t,Y0 h a a u h
teMMA E
c C
W r
juN R
M1 23 a
O M
r P
D H
3 N
T A
N O
S r
e N
M et tr s
n W
T n e o e v p O
R c
A iE e
/
D O
L R
N T
P I
E IH R
S IT
.E 55 =!6 N
5'Ed
)
1 in U
7, a
di 27 lp x
E (t
h2N e e s
C rluT i fa o s
F s
e e
c E9@
r tnn g
ea
!-i[
o mn n
r el i p
. pt el a ninu u o uif s qa e aEMR e - -
- ,r O S
RABCD 4
te 1
a 2
D 0
d 7
e 8
l d u ed c e r h o
c 5
F S 0
0 W
F5 6
8 I
7,_____-
PLANT PERFORMANCE DATA SYSTEM PAGE~
1 CP&L CO
' APPENDIX B - AVERAGE DAILY POWER LEVEL ~
RPD39-000 R U N - D'A T E. ' 04/07/87 q
RUN TIME 14:58:27 BRUNSWICK UNIT 11 9
. DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521
' MARCH 1987 1
DAYE AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET)-
l 1
-5 17
-4 i
2
-5 18
-5 3
-5 19
-4 4
-5 20
-5 5
-5 21
-4 6
-5 22
-4 7
~4 23
-4 8
-- 5 24
-4 9
-4 25
-4
-10
-4 26
-4 11-
-4 27
-4 12
-5 28
-4 13
-5 29 14
-5 30
-4
.15
-4 31
-4 16
-4 l.
1.16 - 8
CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1
RUN DATE 04/07/87 OPERATING DATA REPORT
~RPD36-0C0
' RUN TIME 15:16:17 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (919)457-9521 1.
UNIT NAME: BRUNSWICK UNIT 1 i NOTES 1.
2 REPORTING PERIOD: MARCH 87 I
l-3.
LICENSED THERMAL POWER (MWT): 2436 I
I 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
I 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 l
I 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l l
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 2160.00 86833.00
- 12. NUMBER OF HOURS REACTOR CRITICAL
.00 1063.50 56218.72
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 1647.10
- 14. HOURS GENERATOR ON LINE
.00 1058.95 53274.27
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (HWH)
.00 2092181.01 111134205.90
- 17. GROSS ELEC. ENERGY GEN. (MWH)
.00 668550.00 36586402.00
- 18. NET ELEC. ENERGY GENERATED (MWH)
-3306.00 640581.00 35154587.00
- 19. UNIT SERVICE FACTOR
.00 49.03 61.35
- 20. UNIT AVAILABILITY FACTOR
.00 49.03 61.35
.56 37.54 51.25 3
- 22. UNIT CAP. FACTOR (USING DER NET)
.54 36.12 49.31
- 23. UNIT FORCED OUTAGE RATE
.00
.00 18.02
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 06/20/07 26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED
\\
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
r-j l
DOCKET NO.:
050-0324 UNIT:
Brunswick 2 DATE: April 1987 COMPLETED BY: Frances Harrison OPERATIONS
SUMMARY
BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 87.16 percent capacity factor and a 91.51 percent availability factor. There was one off-line outage and one power reduction.
Details are in the Unit Shutdowns and Power Reductions sheet.
There are 756 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.
i
CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2;
l RUN DATE 04/07/87 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000' l
' RUN TIME 15:16:15 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 MARCH 1907 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 781 17 780 2
775 10 780 3
775 19 778 4
774 20 776 5
775 21 761 6
776 22 775 7
773 23 774 8
777 24 773 9
776 25 773 10 775 26 773 11 91 27 764 12
-12 28 570 13 37 29 721 14 601 30 768 l
15 754 31 767 16 777 1.16 - 0
.s
(
\\
CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2i
,RUN DATE 04/07/87' OPERATING DATA REPORT RPD36-000, RUN TIME' 15:16:17 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 L
COMPLETED BY FRANCES HARRIS 1
i OPERATING STATUS TELEPHONE (919)457-9521 q
1.
UNIT NAME: BRUNSWICK UNIT 2 I NOTES I i 2.
REPORTING PERIOD: MARCH 87 I
I 3.
LICENSED THERMAL POWER (MWT): 2436 I
I J 4.
NAMEPLATE RATING (GROSS MWE): 867.0 l
I l 5.
DESIGN ELECTRICAL RATING (NET MWE): 821.0 1
1 6.
MAX DEPENDADLE CAPACITY (GROSS MWE): 815.0 l I
7.
MAX DEPENDABLE CAPACITY (NET MWE): 790.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERTOD 744.00 2160.00 101159.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 692.98 1852.49 60597.42
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00
- 14. HOURS GENERATOR ON LINE 680.80 1731.62 56771.93
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1616751.76 4029806.58 114988462.66
- 17. GROSS ELEC. ENERGY GEN. (MWH) 527095.00 1312605.00 37150931.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 512321.00 1272420.00 35555237.00
- 19. UNIT SERVICE FACTOR 91.51 80.17 56.12
- 20. UNIT AVAILABILITY FACTOR 91.51 80.17 56.12 1
- 22. UNIT CAP. FACTOR (USING DER NET) 83.87 71.75 42.81
- 23. UNIT FORCED OUTAGE RATE 8.49 15.92 14.94
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 I
0 s l c) me iDiR c
- ni n9 et tc L
0 u r a1 vl uf 4
5 r p r9 e
e oi or v
c rf r
0 B A F(
i n
p s nf(o tc e
m s no t
'. EEYE e or i i I i t
O r
s MTBN t
u r
- ta e r
N r
r e A A D O un c d b Gah E H Co e o e T
pSR-N D iR rd ib r y E
t K T T P e
&t rd i Pr E
c t
E C N L L eA n o n h
tn I
s e
f a x
r O U P E u
v o
D M
C r
r g EfEE0 T
a e
e n P
O wi C
ot 4
p se d t ec e u v d l e a R v SN O
I T
L u
m U
E$
ou aS C
rci D
St 7
E 8
- l l a a R
9 duu 1
onnt R
ha a u 5'MUi M1 23 h
t eMMA t
E c
v W
ra O
M P
D H
3 N
T A
N O
C e
S N
M
" tn t
5 r
W T
" e o
' v p A
O R
'iE e
/
D O
l R
N T
P U
E H
R S
T
.._2 3eg5 c NI
-. gm
)
- 5 5
in U
rhE3 la p
x E
(t
.{0x e e s
B rluT r
iao F
ec 1:
tnn ea
=53c 0
mn el 0
- pt el a ninu o uif g s qa e aEMR 1c e - -
5 RABCD 7
c 2
i, 3
)
0 7
d 8
le d u ed rc e h
1 o
c 6
F S 3
0 FS 7
8 t
oa e 3 s l c) yp iDiR c
- nin9 r u tcfL 0 u ra 1 a r 5 r pr9 e
e t r u
v c
n e r or 0 B AF (
i n
et ts n f
O.EEYE tc e
mn no MT8N r torr oi I i ts e
ta e mn r
u N
A u
r e A
D 0 on c o
Gah T N D e
Co t e f
Ef iR t
p S E
h ie K IT T P
&t E
ct et b r yt E
eA n u
i Pr n L
h t
C N L
s e
d f r
O U P E u
v o
x o T
a e
m EfEE0 D :
M C
P r o r
a n O
ci C
st 4
p r u.
o r y t rl c e p a t p e n u R i s SN O
.?0 m
C a
r o@u c
U D
S E
8
- l l 7
a R
9 d uu 1
onnt R
h a au
?G h
h teMM E
c 3#
W r
O M
t M1 2 a
P l
3 D
i N
T A
N O
S e
r N
M e
tn t
4 s
r W
T n
e o 0
e v p 0
O R
ic E e D
O L
R 7
T P
8 U
E
-2 R
i lS T
=
5 :!6 N
I
)
U E j, 3
ia n
j 3e lp x
r E
o tt O E uT s
,r h{$
H e e p r r
l f i o a
F e
?E@
2 tnn 0
i e s ij mn 3
[
6
- pt e ninu o uif s qa e aEM e - -
F RABC t
1 ia 1
3 D
0 d
7 e
8 lu d
ed c e 1
r h
o c
F S 0
3 0
FS 7
8 l
i
U W
i Cp&L Carolina Power & Light Company Brunswic'c Steam Electric Plant
'P. O. Box 10429 Southport, NC 28461-0429 April 7, 1987
' FILE: B09-135100-SERIAL:
BSEP/87-0381 Mr. R.'M.
Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2-DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR -71 AND DPR MONTHLY OPERATING REPORT
Dear Mr. Scroggins:
In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of March 1987.
A correction was made to the number of reactor critical hours credited to Unit 2 in January. This change is seen as an additional 51.14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> in line No. 12--year to date and cumulative.
Very truly yours, 0.&
C..R. Dietz, General Manager Brunswick Steam Electric Plant FH/cb MSC/85-0014 Enclosures cc: