ML20237K475
| ML20237K475 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 08/21/1987 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20237K478 | List: |
| References | |
| NUDOCS 8708270190 | |
| Download: ML20237K475 (2) | |
See also: IR 05000271/1987012
Text
..
l
'
h
.
!
'
AUG 211987
!
I
l
!
Docket No. 50-271
l
Vermont Yankee Nuclear Power Corporation
ATTN:
Mr. Warren P. Murphy
Vice President and Manager of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection Report No. 50-271/87-12
This refers to the routine resident safety inspection conducted by Mr.
D. R. Haverkamp of this office on June 2 - July 30,1987, at the Vermont Yankee
Nuclear Power Station, Vernon, Vermont.
The inspection consisted of observation
of activities, interviews with perscnnel and document reviews.
The results of the
inspection are described in the NRC Region I Inspection Report enclosed with this
letter and were discussed with Mr. R. Wanczyk of your staff at the conclusion of
the inspection.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC retirements, as set forth in the
1
Notice of Violation enclosed herewith as Appendix A.
The violation concerns the
]
failure to meet Technical Specification 3.2.J requirements for the chlorine gas
'
trip setpoints in the toxic gas monitoring system.
This violation has been cate-
]
gorized by severity level in accordance with the " General Statement of Policy and
Procedure for NRC Enforcement Actions", 10 CFR Part 2, Appendix C (Enforcement
1
Policy 1986).
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
The responses directed by this letter and the enclosed Notice are not subject to
the clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this
letter and the enclosures will be placed in the NRC Public Document Rocm.
Your cooperation with us is appreciated.
Sincerely,
l
Origijal slCned . y;
[4
B~08270190 870821
6
d/' add.'wenzinger, Chief
ADOCK 050
1
0
fj Projects Branch No. 3
Division of Reactor Projects
0FFICIAL
CORD COPY
DL50-271/87-12 - 0001.0.0
08/21/87
[\\
AN
_
- _ _ _ - _ _ _ - _
.
'
Vermont Yankee Nuclear Power Corp.
2
g
s
Enclosures:
1. Appendix A, Notice of Violation
2. NRC Region I Inspection Report 50-271/87-12
cc w/encls:
Mr. R. W. Capstick, Licensing Engineer
Mr. J. Gary Weigand, President and Chief Executive Officer
Mr. J. P. Pelletier, Plant Manager
Mr. Donald Hunter, Vice President
Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.
Mr. Gerald Tarrant, Department of Public Service
Public Document Room (PDR)
,
!
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
l
State of New Hampshire
l
State of Vermont
'
NRC Resident Inspector
bcc w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
DRP Branch Chief
M. McBride, SRI, Pilgrim
H. Eichenholz, SRI, Yankee
V. Rooney, LPM, NRR
Robert J. Bores, DRSS
l
'
/
'
RI:D P
RI:DRP
.
aver emp/meo/mjd
Elsasser
Wenzinger
8/r1/87
8/ly/87
8/'It/87
0FFICIAL RECORD COPY