Monthly Operating Rept for Mar 1987
ML20237K462
Person / Time
Site: Oyster Creek
Issue date: 03/31/1987
From: Baran R, Fiedler P, Notigan D
GENERAL PUBLIC UTILITIES CORP.
To:
NRC
References
1584G, NUDOCS 8708190267
Download: ML20237K462 (6)


Text

,_ _

4 MONDILY OPERATING REI' ORT - MARCH 1987 At the Mginning of the report period, Oyster Creek was shutdown for repairs to Source Range Monitor (SRM) and Intermediate Range Monitor (IRM) drive units and replacement of ten (10) SRM/IRM detectors.

Following completion of repairs, reactor startup commenced on March 9.

Criticality was achieved and plant heatup continued to normal operating pressure.

The reactor mode switch was placed in the "RUN" position on Mrch 10 and the generator was placed on-line.

Reactor power was slowly increased to a maximum generator load of 664 MWe, which was reached on March 14.

Fu)1 power was maintained for the balance of the report period except for three (3) brjef powet reductions of less than 70 MWe to support turbine g"

valve testing, facilitate repairs to a main condenser circulating water disc h rge valve and ininimum generation order issued by GPU System Operations.

1584E ILO B708190267 870331 PDR ADOCK 05000219 g

PDR

Oyster Creek Station #1 Docket No. 50-219 REFUELING :NFORMATION - MARCH,1987 l

1 Name of Facility: Oyster Creek Station 11 Scheduled date for next refugling shutdown:

N/A k

Scheduled date for restart following refueling:

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No

. Scheduled date(s) for submitting proposed licensing action and supporting information:

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

1. General Electric Fuel Assemblies - fuel design and performance analysis methods have been approved by the NRC.

New operating procedures, if necessary, will be submitted at a later date.

2. Exxon Fuel Assemblies - no major changes have been made nor are there any anticipated.

The number of fuel assemblies (a) in the core 560

=

(b) in the spent fuel storage pool = 1392 (c) in dry storage 20

=

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present licensed capacity:

2600 The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Reracking of the fuel pool is in progress. Six (6) out of ten (10) 3 racks have been installed to date. When reracking is completed dischargecapacitytothespentfuelpoolwillbeavailableuntIl1990 refueling outage.

q 1

16198

AVERAGE DAILY POWER LEVEL NET MWe DOCKET #........

50-219 UNIT.

. OYSTER CREEK #1 REPORT DATE.

.... APRIL 2, 1987 COMPILED BY.

.... dot 1ALD V. NOTIGAN TELEPHONE #......

609-971-4695 mot 1TH MARCH,1987 DAY MW DAY KN 1.

0 16.

641 2.

0 17.

637 3.

0 18.

640 4.

0 19.

639 5.

0 20.

639 6.

0 21.

640 7.

0 22.

641 8.

0 23.

639 9.

0 24, 637 10.

0 25.

639 11.

400 26.

635 12.

552 27.

638 13.

633 28.

635

  • 4 14.

630 29.

635 15.

637 30.

630 31.

633 19688 l

1

/

OPICRATItiG DATA REFORT

' OPERATING STATUS

,+

,3 1.

LOCKET:

50-219 2.

REPORTING PERIOD:

MARCH, 1987 i

3.

UTILITY COUTACT:

DONALD V. NOTIGAtt 609-971-4695 i

4.

LICENSED THERMAL POWER (Kdt):

1930 5.

NAMEPLATE RATING (GROSS Nde):

687.5 X 0.8 = 550 6.

DESIGN ELECTRICAL RATING (NET Kde):

650 I

7.

MAXIMUM DEPENDABLE CAPACITY (GROSS Mde):

650 1

8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

620 9.

IF CHANGES OCCUR ABOVE SINCE LkST REPORT, GIVE REASOtiS:

NOME

10.. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET Kde):

N/A

.I

11. REASON FOR RESTRICTION, IF ANY:

NONE l

5 s

MOtiTH YEAR CUMUL?.TIVE 1,

/

12.

REPORT PERIOD HRS

' 744.0 2160.0 151393.0

, 641.5 1403.1 96239.6 1

13.

HOURS RX CRITICAL s

8,

)

14.

RX RESERVE SHTDWN HRS 0.0 0.0 918.2

(

i l

15.

HRS GENERATOR ON-LINE 505.<5 1309.7 93679.7 16.

UT RESERVE SHTDWN HRS 0.0 0.0 1208.6

17. GROSS THERM ENER (MWH) 954300 2187604 155143989
18. GROSS ELEC ENER (MWH) 325070 742600 52410845 19.

NET ELEC ENER (MWH) 311,734 708383 50318460 20.

UT SERVICE FACTOR 67.9 r60.6 61.9 j

21.

UT AVAIL FAC'IOR 67.9 60.6 62.7 t

L 22.

UT CAP FACTOR (MDC NET) 67.6 52.9 53.6 23.

UT CAP FAC'IOR (DER NET) 64'.5 50.5 51.1 l

24.

UT FORCED OUTAGE RATE 32.1 39.4 10.9

25. ' FORCED OUTAGE HRS 238.5 850.3 11502.1 4

26.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION):

N/A 27.

IF CURRENTLY SHUTDC',1N ESTIMATED STARTUP TIME:

1965B t

U

M8 pr m n

h i ot eo t

7 rt pri tc it d

arwa e

9 r' eee c

d e

1 l

nrt ei n

s e

_ 2mi asi i

asf e

nt nF

- sr bhwoi t

oae) i D i.

c 0 yp r gd o r x

tc 5OA uiel e e

u f I e

e or v

c the v

r o

n f a s

c e

ay e

m t

i nf(

r i

ao

.EEYE s

O e or boor e

r l i t MTBN u

o wti l

- ta:

r t

N AA D O on c r

r :

tdt w

b Gahe T ND Ei iR e

e o

Cu e l

pS t

EK T T P

&ut esrua r

se y

C N L L eAn uued p

ipr n1 l r E E I

s e

dat g

h t

r x

n E

u v

cftn M.

EfEE0 O U P

o e

D M l a

s ap or I g m

aui e

I C

P O

ril nu

/a C

creud Mt 4

stvr Ru e

g So rel on on

.ti ti r t

cbetr E

art no I

euaeh O

RTwws N

S NO H

' goo

/

8o m

C 7

A a

U 8

rc 9

N S

D 1

E l l

a a d uu R

h onnt R

c h aaut E

r tgO A

eMt4 t

/

W a

E gu N

M l-n O

M P

3 I

D H

NA NO e

SN M

e 1

t t

s n

s 1

W T

n e o 0

e v p O

R c

iE e 7

D O

L R

i P

8 u

ER l

iS T

L

& cga IN

)

Ysj U

3 ina 3 y 5.e lpx E

(t "g;; E s

e e A

rT u

lif ao F

e Eg 5

t c nn 5.3Q 3

e a 8

mm 5

pt o ui nin u s qa e e

4 t

aE

- gE F

RA8C 2

I 7

e 8

ta

/

D 4

d 1/

d leu 2

ed c e s h o

c F S FS o

2 N

5 I

jj lll

g' e

1

/

(

a GPU Nuclear Corporation

. Nuclear

en:r388 Forked Rrver, New Jersey 08731-0388 609 971-4000 l

Writer's Direct Dial Number:

April 16, 1987 Director Office Of Management Information U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

1

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station. Due to problems with our Word Processing System, the summary of LERs submitted during the month of March will be included in the April report.

If you have any questions, please contact Mr. Joseph Kowalski, OC Licensing Manager at (609)971-4643.

Very truly yours, Pfterli.Fiedler Vice President & Director Oyster Creek PBF:KB:dmd Enclosures cc: Director (10)

Office of Inspection and Enforcement USNRC Washington, DC 20555 i

Dr. Thomas E. Murley, Administrator Region I USNRC 631 Park Avenue King of Prussia, PA 19406 h )\\

NRC Resident Inspectors OCNGS 1

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

- - _ _ _ _ - _ _ _ _ _ _ _ _ _ _