DOCKET NO.: 050-0325 UNIT: Brunswick 1  !

DATE: May 1987 COMPLETED BY: Frances Harrison OPERATIONS SUtiMARY BRUNSWICK UNIT 1 The unit was removed from service on February 14, 1987, for refueling /mainte-nance outage.

There are 1016 BWR and 160 PWR spent fuel bund 1'3 in the Brunswick Unit 1 fuel pool.

1 4

l i

1 f

l 8708190244 870430 PDR ADOCK 05000324 R PDR I

' CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 05/05/87 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 06:38:48 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 APRIL 1987 DAY AVO. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 -4 17 -5 2 -5 18 -4

! 3 -5 19 -4 4 -5 20 -5 5 -5 21 -5 6 -5 22 -5 7 -5 23 -5 0 -4 24 -5 9 -4 25 -5 10 -4 26 -5 11 -4 27 -6 12 -4 28 -6 13 -4 29 -6 14 -4 30 -5 15 -4 16 -5 1.16 - 8

l

  • CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i RUN DATE 05/05/87 OPERATING DATA REPORT RPD36-000

,RUN TIME 06:38:50 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON I OPERATING STATUS TELEPHONE (919)457e/521

1. UNIT NAME: BRUNSWICK UNIT 1 1 NOTES I
2. REPORTING PERIOD: APRIL 87 I l
3. LICENSED THERMAL POWER (HWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 1 I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 1 I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 l i
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

I

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

i THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 719.00 2879.00 88703.00
12. NUMBER OF HOURS REACTOR CRITICAL .00 1063.50 56218.72 i
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10 i
14. HOURS GENERATOR ON LINE .00 1058.95 53274.27 j
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 j
16. GROSS THERMAL ENERGY GEN. (MWH) .00 2092181.01 111134205.90 l
17. GROSS ELEC. ENERGY GEN. (MWH) .00 668550.00 36586402.00 35135535.00 ]
18. NET ELEC. ENERGY GENERATED (MWH) -3386.00 637195.00 ,
19. UNIT SERVICE FACTOR .00 36.78 60.06
20. UNIT AVAILABILITY FACTOR .00 36.78 60.06
21. UNIT CAP FACTOR (USING HDC NET) .60 28.02 50.14
22. UNIT CAP. FACTOR (USING DER NET) .57 26.96 48.25
23. UNIT FORCED UUTAGE RATE .00 .00 18.02
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 06/20/87
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1.16 - 9

- _ _ _ _ _ - _ - _ _ - _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - - _ - _ _ _ _ _ _ _ _ _ a

l\'jl]ll.fi i1 .: , l ,i

., n G o E s . R i

r 1 U I r 2 N a 5 e

(

k H 9 e le 5' c 7 - s si e 2 i 8 s 7 nt anF c 3

0 w 9 s 1 e

c 5

4 oae) c r

u

- n y n u a 9

- iDiR tc L E S o

r a r e e u f B MF 9 1

v' n c

e r

ts nf(

orL o e

' e g no m a

O.EEYE N MTBN

' or

' t u

r t

u a I it tsr o

- raeep t

S A A T NDEH DO C" on ec O ~ Gah pSR' e 1 E e t t K T I TP E E &ti

" An ctR c n

ie br yt i Pr n1

) b i

i CN L L PE 5

e v

a n

h r x o tnv1 e6 h x

O DU T .' e e EfEE0 E M I P r t n

O i s

C M a 4

/

g n

i l

e u

f a

R s n A S

so -

. ni " -

N O X X

m .e ct a

r e

I T n.YG mc aS ad t u' C l .

ue U ~cE&E$ e u St r

cic nR _

D 7 f a i r E 8 l l duuaamtd e 9

R 1 o nah R l ,$ G onnt oot haau CLO E i ,

C eMMA t

W r p E5N r R

M1 23 456 O A P

D l i

3 N T A N S O e e N M et s t nr n eop -

W T A O R uv iEe

/

N n D O L R i o

T P t E a U

f R n i

S im a

T - x I ~ . :M5 :{C E N ' .

)

_ U uE55 1 n e s

)

T ,5. 5' ia n in

_ lp e a x ic lp E nL o x E

ic&

(t s t

< F j, x C ee r ig

(

r luT r tsin o) r s iao f

ene r n s F e RivEi ai a tnn gr yT a anxlp e c r t l 05_ : r r g ea or -

s oE t

5 }5 o mnnt oi i(

n i p -

pt el i

el ai at ant r ninu r e o uifur ge meh s qa e e pd pt

_ aEMRROAOO .

_ .[

S e - - - - - - - l RABCDEFGI 2-

- 4 1

_ 9' 2 d 0 e

. 7 l g 8 du ed f ce rh o c .

5 0

F S ) _

., 0 7 .

N - F5 7

- 6 /

_ 8 I 91 h

1

( -

DOCKET NO.: 050-0324 UNIT: Brunswick 2 DATE: May 1987 COMPLETED BY: Frances Harrison i

l l OPERATIONS

SUMMARY

BRUNSWICK UNIT 2 Brunswick Unit 2 operated at a 82.24 percent capacity factor and an 86.78 percent availability factor. There was one off-line outage and one power reduction.

Details are in the Unit Shutdowns and Power Reductions sheet.

There are 756 BWR and 144 PWR spent fuel bundles in the Brunswick Unit 2 fuel pool.

i I

t l

    • CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 05/05/87 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 06:38:48 BRUNSWlCK UNIT 2 DOCKET NO. 050-0324 I

COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 l l

APRIL 1987 DAY AVO. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL

.(HWE-NET.) ( HWE,4ET )

1 769 17 763 2 769 18 764 3 770 19 767 4 7S8 20 767 5 771 21 766 6 624 22 764 7 A0 23 763 0 -9 24 751 9 -11 25 732 10 7 26 776 l 11 563 27 776 12 709 28 776 13 763 29 776 i 14 765 30 775  !

13 769 16 770 l

1.16 - 8

i CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 2 l

RUN DATE 05/05/87 OPERATING DATA REPORT RPD36-000 RUN TIME 06:38:50 DRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON 1 OPERATING STATUS TELEPHONE (919)457-9521

1. UNIT NAME: BRUNSWICK UNIT 2 1 NOTES I
2. REPORTING PERIOD: APRIL 87 I l
3. LICENSED THERNAL POWER (NWT): 2436 I i
4. NAMEPLATE RATING (OROSS MWE): 867.0 t i
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 1 I
6. HAX DEPENDABLE CAPACITY (GROSS NWE): 815.0 I I
7. HAX DEPENDABLE CAPACITY (NET MWE): 790.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): q
10. REASONS FOR RESTRICTION IF ANY: *

]

THIS YR TO CUHUL l

. MONTH DATE ATIVE l e

11. HOURS IN REPORTING PERIOD 719.00 2879.00 100727.00 l 12. NUMBER OF HOURS REACTOR CRITICAL 646.08 2498.57 61243.50 l l 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 l 14. HOURS GENERATOR ON LINE 623.95 2355.57 57395.88 l 13. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 l 16. GROSS THERMAL ENERGY GEN. (NWH) 1482956.90 5512763.48 116471419.56 l
17. GROSS ELEC. ENERGY GEN. (HWH) 481645.00 1794250.00 37632576.00
18. NET ELEC. ENERGY GENERATED (MWH) 467136.00 1739556.00 36038039.00
19. UNIT SERVICE FACTOR 86.78 81.82 56.98
20. UNIT AVAILABILITY FACTOR 86.78 81.82 56.98
21. UNIT CAP. FACTOR (USING HDC NET) 82.24 76.48 45.29
22. UNIT CAP. FACTOR (USING DER NET) 79.14 73.60 43.58
23. UNIT FORCED OUTAGE RATE 13.22 15.22 14.93
24. SHUTDOWNS SCHED, OVER NEXT 4 HONTHS (TYPE, DATE, AND DURATION OF EACH):

i

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1.16 - 9

_ _______._____m._______

- c n -9 itc Di

n. yar1a e e uforLE

_ y B. M F 9 v c r i

ec - er n

t s

n o nfo O.EEYE e I is

_ MTBN t

N A A r

toru -

ta r e e DO ron c e Gah T

E N D EH Co e iR g

a

~

t i e pSR

_ K T CN O

I T P E E L E L

&t c eA s

u tne v

k a

e ibP r ry h

xr t o D U l

P a e n EfEE0 M T O

C C

P i i l

l e

4 w

y d

h r

g i

H

_ S

_ N . -

O .

I T ". O m a

C .

r U E$ ci D 7 St 8 l E 9  : la

_ R 1 duu o nnt R ha a u

_ E i l

r  %-EO t eMMA

_ W p

[gvi M1 23

_ O P

_ D N

A 1

1 T

N 3

S N

O M

T 5

C C

" tn r

t r .

W C e o

' v p A

_ O R e /

D O P

l'E R N T

_ U E I

I R

S

_ T I

N

~;Ey , ej6 )

U s_

- 5g2 - n 1

Thgy ia lp x

E (t

e53. %

- A e es r

luT if a o F e 5 c s$. O .

0 tnn ea

=33O 5 9 mn

pt ele

,j3 ninu o uif g s qa e aEMR e

ed F RABC - -

,' 6

, 0 y

e' 4 0 d 7 e 8 d lu ed rce o h c 4 F S 4

0  : :

% 7 FS 8 I V

7

0 u va 5 r ar 9 e v

m iDiR tc f L 0_B MF 1

9 e v

e c

l a o r

urnfo or

_ i n vt ts tc e a O.EEYE e r e r Ino i ts N AMTBN r ioru r n e .

t ar ee T

A DO on ce i n t e Gah

_ E ND EH T P C oiR

&t c uG o

t i e b r yt pSR K T E E eA tne rl e i P r I

h r CN L L s u - ve

, s x o t O P E D U t e a ni EfEE0 MT C P r

eD -

O m C e3 4

_ v #

o rC p2 m

i 2 .

1 t d s o T- e R P t S

N .

_ O -

m I

_ T O C

U Ef.3g aS r

ci D

E R

7 8

9 1

la la donnt uu St R l t,yO ht a a u E i r

- eMMA W j3m - - -

_ O P

A p M1 23

_ D 3 l

i N T

_ A N S O e r

- N M e s

n n tr .

_ W T e v e op A R /

O c e iE N

_ D O L R T P U E f

i R

S T

I N

-.E25 g6 -

U $jg )

n

_dij

. 5 ia lp x

E

( t s

h4$

B e r e luT f F

ia o e

c

?g~ 0 tnn ea 0

[3j .

pt el ninu mn el o uif s qa e

,i" aEMR e - -

- 5 RABCD .

e 4 ta 2 D 4 0 d 7

8 le d u ed l

rce h 8

o c 4 F S 0  : :

W 7 FS 8 '

I

i CD&L Carolina Power & Light Company muermanma:macammamm Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 May 4, 1987 FILE: B09-135100 SERIAL: BSEP/87-0381 Mr. R. M. Scroggins, Director Office of Resource Management 3 U.S. Nuclear Regulatory Commission

! Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MON'IELY OPERATING REPORT

Dear Mr. Scroggins:

In accordance with Technical Specification 6.9.1.6 for the Brunswick Steam Electric Plant, Units 1 and 2, Carolina Power & Light Company herewith submits j the report of operating statistics and shutdown experience for the month of ,

April 1987. l Very truly yours, s'

3 C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/cb MSC/85-0014 Enclosures cc: Mr. M. R. Beebe Dr. J. N. Grace Mr. M. D. Hill Mr. P. W. Howe Mr. C. F. Lassiter Mr. R. G. Oehl Mr. W. H. Ruland Ms. H. M. Shaver Ms. D. J. Vicks INPO 7

h 9 s'

,