AUG 141987
In R ply Refer To:
Docket: 50-458/87-14
Gulf States Utilities
ATTN: Mr. James C. Deddens
Senior Vice President, (RBNG)
Nuclear Licensing
P. O. Box 220
St. Francisville, Louisiana
70775
Gentlemen:
Thank you for your letter of July 28, 1987, in response to our letter and
Notice of Violation dated June 29, 1987. We have reviewed your reply and find
it responsive to the concerns raised in our Notice of Violation. We will
review the implementation of your corrective actions during a future inspection
to determine that full compliance has been achieved and will be maintained.
Sincerely,
Odginal M nod riv
J. E. Gagliardo'
J. E. Gagliardo, Chief
Reactor Projects Branch
cc:
Gulf States Utilities
ATTN:
J. E. Booker, Manager-
River Bend Oversight
P. O. Box 2951
Beaumont, Texas
77704
Louisiana State University,
Government Documents Department
Louisiana Radiation Control Program Director
0708190243 370014
bec to DMB (IE01)
ADOCK 05000458
O
bec distrib. by RIV:
RPB
DRSP
i
Resident Inspector
R. D. Martin, RA
SectionChief(RPB/A)
D. Weiss, RM/ALF
MIS System
RSB
RSTS Operator
Project Inspector, RPB
0\\
RPSB
R. Hall
RIV File
W. Paulson, NRR Project Manager
9
,
C:RPB/A f//[
C:RPB
pJPJaudon:cs
JEGag
)I
8//) /87
8/ f3/8
,
_ - _ _ - _ _ _ _ _ .
-(
. . - 1 ;,'
i
(
'
.-
GULI' STA TES
UTILITIES
COMPA N Y
,,vra s,e.o s en s.
em omo ec = :n
e e aam ma s ws'e,' vms -----
- : %
-
i
n
AA[ A GDL 604
ti36 ON4
340 OfEl
ii
,
- LA
JUL
i isSI
,
July 28, 1987
L_
C' i
RBG -
26347
l
File Nos. G9.5, G15.4..
U.S. Nuclear Regulatory Commission
l
Document Control Desk
Washington., D.C.
20555
Gentlemen:
!
River Bend Station - Unit 1
Refer to:
Region IV
Docket No. 50-458/ Report 87-14
This letter responds to the Notice of Violation contained in NRC
Inspection Report No. 50-458/87-14. The inspection was performed
by Messrs. Chamberlain, Jones and Bennett during the period
l
May 1-June 15, 1987 of activities authorized by NRC Operating
,
License NPF-47 for River Bend Station.
,
Culf States Utilities Company's
(bSU)
response to Notice of
Violation 8714-01
" Failure
to
Follow
Surveillance
Test
Procedure",
is provided in the enclosed attachment pursuant to
10CFR2.201. This completes GSU's response to this item.
i
Sincerely,
A
km
. C. Deddens
Senior Vice President
River Bend Nuclear Group
.
'
Ji utgic
JCD/ERE/RJK/JWC/ch
U.S
Nuclear Regulatory Commis'sion
cc:
611 Ryan Plaza Drive, Suite 1000
Arlington, TX 76011
f
NRC Resident Inspector
h'7.-
\\'
P.O. Box 1051
St. Francisv111e, LA 70775
l
g. gy{ n ,,
.
p k g.c' f % '
h
-
- - - _ _ _ - -
-
. _ _ .
. . -
s ,: ..
..
UNITED' STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
i
STATE OF LOUISIANA
)
PARISH OF WEST FELICIANA
)
In the Matter of
)
Docket No. 50-458
50-459
GULF. STATES UTILITIES COMPANY
)
(River Bend Station,
Unit 1)
.
J.
C.
Deddens,. being
duly sworn, states that he is a
Senior Vice President of Gulf States Utilities Company; that
he
is
authorized
on
the part of said company to sign and
file with the Nuclear Regulatory
Commission
the
documents
attached
hereto;
and
that all such documents are true and
correct to_ the
best
of
his
knowledge,
information
and
belief.
Yaw
A.
.
,.
J. C. Deddens
Subscribed
and
sworn
to before me, a Notary Public in
Ikdayof
and for the State and Parish above named, this
7)1f V
19 M .
,
/
-
.
l by w-
... , . Ici t u
Q
n
Goan W. Middlebrooks
' Notary Public in and for
-
West Feliciar.a Parish,
My Commission is for Life _.
i
- - - . _ - _ _ _ _ - - _ _ _ - _ _ _ _ _ _ - _
_ -__ __
!
I
&
4 .
g
l
i
ATTACHMENT
{
.
RESPONSE TO NOTICE OF VIOLATION 50-458/8714-01
LEVEL V
REFERENCE:
Notice of Violation - J.B.
Gagliardo letter to
J.C.
Deddens,
dated June 29, 1987.
FAILURE TO TOLLOW SURVEILLANCE TEST PROCEDURE:
Technical Specification, paragraph 6.8.1.d requires that written
,
procedures shall be established, implemented and maintained for
l
surveillance and test activities of safety-related equipment.,
Surveillance
Test
Procedures
STP-Sil-4501,
"RPS/ ISOLATION
i
ACTUATION-MSLI-MAINSTEAM LINE RADIATION-HIGH MONTHLY
CHFUNCT
(D17-K610A),"
and STP-051-4267,
"ECCS DRYWELL PRESSURE-HICH
MONTHLY CHFUNCT;
18 MONTH CHCAL;
18 MONTH LSFT (B21-N098B;
B21-N694B)," each require in the prerequisites, Step 6.1, that
each performer read and familiarize himself with the
test and
then indicate so by signing and initialing the step.
Contrary to the above, STP-511-4501 and STP-051-4267 performed on
l
'
May 16, 1987, and June 4, 1987, respectively, did not have all of
the required prerequisite signatures to Step 6.1 indicating that
,
{
each technician had read and understood the procedure prior to
their performing the procedure.
'
REASON FOR THE VIOLATION:
I
l
Personnel
made a procedural error which resulted in this
violation. During both occurrences, the STPs had becn started by
one technician which had properly read and signed the STP.
However, another technician who later assisted the first did not
sign the appropriate area of the STP.
l
t
j
l
i
CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED *
l
Memorandum APM-M-87-171, dated June 22, 1986, has been issued to
i
l
reiterate the importance of sigding the required steps. A review
of applicable procedures indicates that no procedure revision is
needed.
I
-
.
l
l
_ . _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _
- _ _ _ _ _ _ _ _ _ _ .
!
, ' . .
,
CORRECTIVE STEPS WHICH HAVE BFFN TAKEN TO
AVOID
FURTHER
VIOLATIONS:
,
l
As a result of this violation,
Instrumentation and Control
l
personnel have received training emphasizing the requirement for
'
indicating that the procedure has been read and understood by all
Instrument and Control Technicians working the STP.
The training
directs the
technicians to indicate
that they have read and
understood the procedure regardless of what percentage
of
I
completion of the STP in which they become involved.
l
l
DATE RHEN FULL COMPLIANCE WILL BE ACHIEVED:
River Bend is currently in full compliance.
l
[
$
e
l
.
J
_ _ _ _ _ _ _ _ _ _ _ _
- - - - -
1