ML20237K271

From kanterella
Jump to navigation Jump to search
Requests Addl Info & Revs to Util 861202 Proposed Amend to Physical Security Plan.Response to Encl Comments Requested within 30 Days from Ltr Receipt
ML20237K271
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/12/1987
From: Reeves E
Office of Nuclear Reactor Regulation
To: Mcdonald R
ALABAMA POWER CO.
References
NUDOCS 8708190173
Download: ML20237K271 (3)


Text

_ _ _ _ _ - - _ _ _ .-. - _ - _ _- -_ _ - - _ _ _ _ .

Docket No. 50-348/364 )

Mr. R. P. Mcdonald Senior Vice President Alabama Power Company P.;0. Box 2641 Birmingham, Alabama 35291 AUG 12 M7 "

Dear Mr. Mcdonald:

i This is to acknowledge receipt of the Alabama Power Company letter dated l l Occember 2,1986, which transmitted a proposed amendment to the J. M. Farley :j Nuclear Plant Physical Security Plan in response to the Miscellaneous Amend- I ments and Search Requirements.

The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval. The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.

It is requested that you provide your-response to these comments within 30 days l from receipt of this letter.

The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; ther afore, OMB clearance is not required under P.L.96-511. -

l Should you have any questions concerning the enclosed commerccs', please contcct the reviewer, Barry Manili, at (301) 492-7077.

Sincerely, Edward Reeves, Project Manager Project Directorate II-1 Division of P.eactor Projects I/II ,

Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION W/ ENCLOSURES:

Physical Security Plan Comments RSGB rf Sec rf BManili CBuracker (2) s cc w/ enclosure: Region II PAnderson See next page EReeves -DockettFile 50-348/364 Case File NRC PDR  !

RErickson w/o encl Local PDR '

LBush w/o enc 1 0FC : S :RSGB :RSGB :RSGB :PD :P  :

% ___...__ p ........ ___

-7_. ..: . 'I:.

_S.!.$.__....!_S$_.....!...___".._!.___..._____!.!$!II.I..!_______..-

DATE$8/6/87 $8/h /87 $8/ h87 $8/h/87 $8/p/67 $8/p/87 $

OFFICIAL EECORD COPY  !

B708190173 870812 PDR ADOCK 05000348 F PDR _ ,m

.3 I

t Mr. R. P. Mcdonald Alabama Power Company Joseph M. Farley Nuclear Plant cc:

! Mr. W. O. Whitt D. Biard MacGuineas. Esquire l Executive Vice President Volpe, Boskey and Lyons Alabama Power Comptcy 918 16th Street, N.W.

Post Office Box 2641 Washington, DC 20006 Birmingham, Alabama 35291-0400 Charles R. Lowman i Mr. Louis B. Long, General Manager Alabama Electric Corporation Southern Company Services, Inc. Post Office Box 550 Post Office Box 2625 Andalusia, Alabama 36420 Birmingham, Alabama 35202 Chairman Regional Administrator, Region II Houston County Commission t!.S. Nuclear Regulatory Commission Dothan, Alabama 36301 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Ernest L. Blake, Jr., Escuire Shaw, Pittman, Potts and Trowbridge Claude Earl Fox, M.D.

~

2300 N Street, N.W. State Health Officer Washington, DC 20037 State Department of Public Health State Office Building Montgomery, Alabama 36130 Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Mr. J. D. Woodard Williams and Ward General Manager - Nuclear Plant Post Office Box 306 Post Office Box 470 Birmingham, Alabama 35201 Ashford, Alabama 36312 Resident Inspector U.S. Nuclear Regulatory Commission Post Office Box 24 - Route 2 Columbia, Alabama 36319 i

Dockst No. 50-348 50-364 j I

1 COMMENTS ON PHYSICAL SECURITY PLAN CHANGES i (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)

J. M. Farley Nuclear Plant l

Provide a schedule for implementor.g the amended safeguards requirements l within 180 days after Commission approval of the proposed security plan. I Reference 10 CFR 73.55. 1 i

I State that vital area access controls will not De dropped for life threat-ening situations not involving public health and safety. Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (Q&A #3).

I Provide a commitment that the search requirements will be implemented l within 60 days after Commission approval of the proposed revisions. '

Reference 10 CFR 73.55(d)(1).

Provide a commitment that if security force members leave the protected area to perform official duties subsequent to their initial entry and search, they will be searched prior +o re-entry into the protected area if they have not been under direct observation or accompanied by another member of the security force. Reference 10 CFR 73.55(d)(1) and Generic Letter 87-08 (Q&A #11).

Provide a commitment that in the case of an individual's involuntary termination for cause, the individual's unescorted facility access will be revoked, and identification badge and other entry devices shall be retrieved prior to or simultaneously upon notification of termination.

Reference 10 CFR 73.55(d)(7)(i)(C).

Provide a commitment to ensure prompt access to vital equipment to accor,- ,

modate the potential need for rapid ingress or egress of individuals during emergency conditions or situations. Indicate how this prompt access will be ensured (e.g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means). Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (Q&A #6).

Indicate what components of the secondary power supply system will be protected as vital. Reference 10 CFR 73.55(e)(1) and Generic Letter 87-08 (Q&A #18).

Provide a commitment to maintain a log indicating name, badge number, time of entry, and time of exit of all individuals granted access to a vital area except those individuals entering or exiting the reactor l control room. Reference 10 CFR 73.70(d).

_ _-